As of: 12/21/2024
Export to Excel
Export to PDF

Executed Interconnection
Agreements Page
Generator Interconnection Queue


Public Queue

QP Updated Type Requested Alternative Name Unit Fuel Type Net MW Summer MW Winter MW County ST Op Date Sync Date W/D Date POI Serv SIS I39 TO Report Dev Zone FS SIS OS FAC IA Project Status Status Jurisdiction
1594 11/15/2024 G 11/15/2024 Woonsocket Substation – Tifft ST BESS OT BAT 4.5 4.5 4.5 Providence RI 12/31/2026 12/31/2026 RIE feeder 26W7, Woonsocket Substation NA N N RI A N
1593 11/15/2024 G 11/15/2024 Point St Substation – Aldrich St BESS OT BAT 3 3 3 Providence RI 12/31/2026 12/31/2026 RIE feeder 76F6, Point St Substation NA N N RI A N
1592 8/21/2024 G 8/21/2024 SHELD BESS OT BAT 3 3 3 Hampden MA 9/1/2025 9/1/2025 South Hadley Electric Light Department 13.8KV NA N N PD WMA A N
1591 8/19/2024 G 8/19/2024 Chase Hill Substation - Western RI DER Study #3 PV SUN 2.375 2.375 2.375 Washington RI 12/31/2026 12/1/2026 RIE Feeder 155F2, Chase Hill Substation NA N N PD RI A N
1590 8/19/2024 G 8/19/2024 Tower Hill Substation - Western RI DER Study #3 PV SUN 3.06 3.06 3.06 Washington RI 12/31/2026 12/1/2026 RIE Feeder 88F7, Tower Hill Substation NA N N PD RI A N
1589 8/19/2024 G 8/19/2024 Kent County Substation - Western RI DER Study #3 PV SUN 21.748 21.748 21.748 Kent RI 12/31/2026 12/1/2026 RIE feeder 3309 and 3311, Kent County Substation NA N N PD RI A N
1588 8/19/2024 G 8/19/2024 Wood River Substation - Western RI DER Study #3 PV SUN 49 49 49 Washington RI 12/31/2026 12/1/2026 RIE feeder 85T2 and 85T3, Wood River Substation NA N N PD RI A N
1587 8/20/2024 G 8/15/2024 Battery Storage OT BAT 3 3 3 Worcester MA 10/15/2025 9/15/2025 West Boylston Denton Lovell Substation T2 Transformer fed from the P142W. Distribution Feeder -F23 Hartwell Feeder NA N N PD CMA A N
1586 8/14/2024 G 8/14/2024 Battery Storage OT BAT 16 16 16 Chittenden VT 4/1/2026 3/1/2026 Global Foundries 13.8 kV bus NA N N PD VT A N
1585 8/13/2024 G 8/13/2024 HGE Group Study OT BAT 12.98 12.98 12.98 Hampden MA 1/1/2026 3/1/2025 Holyoke 52W via 52W6 Circuit or New Circuit NA N N PD WMA A N
1584 8/13/2024 G 8/13/2024 HGE Group Study GT NG 4 4 4 Hampden MA 1/1/2026 1/1/2026 Holyoke 44P via New 34.5 kV Circuit NA N N PD WMA A N
1583 8/13/2024 G 8/13/2024 HGE Group Study OT BAT 4.95 4.95 4.95 Hampden MA 2/15/2025 2/15/2025 Holyoke 17L via 17L16 Circuit NA N N PD WMA A N
1582 10/24/2024 G 7/29/2024 Paxton BESS OT BAT 3 3 3 Worcester MA 12/2/2024 11/25/2024 Paxton Municipal Light Department 13.8KV NA Y Y PD SEMA A N
1581 7/31/2024 G 7/29/2024 TMLP Landfill Solar PV SUN 2.99 2.99 2.99 Bristol MA 1/25/2025 1/24/2025 TMLP Dist Feeder 1841.32 Station 18 13.8kV/115kV NA N N PD SEMA A N
1580 7/31/2024 G 7/29/2024 RMLD DER Group Study OT BAT 9.98 9.98 9.98 Middlesex MA 6/16/2025 6/15/2025 RMLD Station 3/NG S145 & T146 Lines NA N N PD CMA A N
1579 7/31/2024 G 7/29/2024 RMLD DER Group Study OT BAT 4.996 4.996 4.996 Middlesex MA 2/16/2025 2/15/2025 RMLD Station 4/EE 211-503 & 211-504 Lines NA N N PD CMA A N
1578 8/12/2024 G 6/26/2024 Solar PV SUN 20 20 20 Oxford ME 6/6/2028 5/20/2028 8/12/2024 CMP 115kV Woodstock Substation CNR N N PD ME W F
1577 8/12/2024 G 6/26/2024 Solar PV SUN 20 20 20 Knox ME 6/6/2028 5/20/2028 8/12/2024 CMP 115KV SECTION 80 CNR N N PD ME W F
1576 8/12/2024 G 6/26/2024 Solar PV SUN 20 20 20 Cheshire NH 6/6/2028 5/20/2028 8/12/2024 Eversource 115kV Section L-163, approximately 2.6 miles north of North Keene Substation. CNR N N PD NH W F
1575 8/12/2024 G 6/26/2024 Solar PV SUN 20 20 20 Oxford ME 6/6/2028 5/20/2028 8/12/2024 CMP 115kV Woodstock Substation CNR N N PD ME W F
1574 8/12/2024 G 6/26/2024 Battery Storage OT BAT 20 20 20 Merrimack NH 6/6/2028 5/20/2028 8/12/2024 EVERSOURCE 115KV SECTION C196, APPROXIMATELY 1.5 MILES SOUTH OF THE MERRIMACK SUBSTATION. CNR N N PD NH W F
1573 8/12/2024 G 6/26/2024 Solar PV SUN 20 20 20 York ME 6/6/2028 5/20/2028 8/12/2024 CMP 34.5kV Line 182, located approximately 2.5 miles from the West Buxton Substation. CNR N N PD ME W F
1572 8/6/2024 G 6/24/2024 Solar PV SUN 8.084 4.042 4.042 Windham VT 6/30/2026 6/23/2026 8/6/2024 Vernon #13 69kV CNR N N PD VT W F
1571 11/5/2024 G 6/13/2024 Battery Storage OT BAT 19.73 19.73 19.73 Worcester MA 6/30/2027 2/28/2027 42.066328, -71.864144 National Grid 69 kV Substation the East Webster 412 substation. CNR N N PD CMA A F
1570 9/27/2024 G 6/13/2024 Battery Storage OT BAT 19.73 19.73 19.73 Worcester MA 6/30/2027 2/28/2027 9/27/2024 National Grid 69kV line tap on line A-1S Coordinates: 42.493823759032914, -71.77425691308422. Based off the ISO-NE system diagram, it is assumed that the eastern circuit is A-1S and is the preferred connection. however seeking this to be confirmed with ISO-NE" CNR N N PD CMA W F
1569 11/7/2024 ETU 6/13/2024 Non-controllable objective ETU to enable 2400 MW injection NA N/A 2400 New London CT 6/30/2031 12/30/2030 N/A N/A N N PD CT A F
1568 12/1/2024 G 6/12/2024 Battery Storage OT BAT 312.84 152.7552 152.7552 Washington RI 1/31/2027 11/30/2026 The Primary Point of Interconnection will be a direct interconnection to the 115-kV bus at Davisville Substation Expansion owned by RI_NGRID. CNR N N PD RI A F
1567 11/5/2024 G 6/11/2024 Battery Storage OT BAT 514.8 514.8 514.8 Middlesex MA 1/31/2027 11/30/2026 The Primary Point of Interconnection will be a direct interconnection will be located on the IC’s property (Lat, long: 42°41'23.38"N, 71°26'20.43"W) by tapping the 345-kV Line 326-2 (Sandy Pond-Lawrence Rd), owned by RI_NGRID, at approx. 8.4 miles from the 345-kV Lawerence Rd Substation. CNR N N PD SEMA A F
1566 6/11/2024 G 6/11/2024 Wind WT WND 197.4 197.4 197.4 Aroostook ME 10/1/2028 5/1/2028 Orrington – Albion Road 345kV CNR N N PD BHE Third Maine Resource Integration Study A F
1565 9/11/2024 G 6/10/2024 Battery Storage OT BAT 81 81 81 Bristol MA 1/31/2027 11/30/2026 9/11/2024 Interconnect at the 115kV Sykes Rd Substation owned by MA_NGRID. CNR N N PD SEMA W F
1564 11/5/2024 G 6/6/2024 Battery Storage OT BAT 100.955 100.955 100.955 Windham VT 9/30/2027 3/30/2027 Vernon 115 kV (Line K-40) Coordinates: 42.78270705350802, -72.51706642321578 CNR N N PD VT A F
1563 11/5/2024 G 6/6/2024 Solar PV SUN 165 165 165 Somerset ME 6/6/2028 6/6/2028 CMP 115kV Line 83 CNR N N PD ME A F
1562 8/28/2024 G 6/7/2024 Battery Storage OT BAT 45.29 45.29 45.29 Litchfield CT 6/1/2027 12/1/2026 8/28/2024 Eversource 115 kV Line from Frost Bridge #8R to Carmel Hill #11S CNR N N PD CT W F
1561 11/22/2024 G 6/6/2024 Battery Storage OT BAT 141.6 141.6 141.6 Litchfield CT 4/1/2027 3/1/2027 115 kV line between Rocky River and Bulls Bridge substations CNR N N PD CT A F
1560 11/5/2024 G 6/6/2024 Battery Storage OT BAT 133.796 133.796 133.796 Bristol MA 4/1/2027 3/1/2027 Non-PTF 115KV lines ET and W owned by TMLP between Cleary Flood Substation and Substation #16 (W Water St), approximately 1.26 miles from Cleary Flood. Project will interconnect half of the new MW capability to each line. CNR N N PD SEMA A F
1559 11/5/2024 G 6/6/2024 Battery Storage OT BAT 93.2 93.2 93.2 New London CT 5/1/2027 4/1/2027 115 kV line 1070 between Ft Hill Farms and Stockhouse Substations, interconnected by a new three-breaker ring bus approximately 2.5 miles from Ft Hill Farms substation and 5.2 miles from Stockhouse Substations. CNR N N PD CT A F
1558 11/5/2024 G 6/6/2024 Battery Storage OT BAT 141.5 141.5 141.5 Bristol MA 1/1/2028 12/1/2027 115 kV line W4S between Grand Army Substation and Pottersville Substation. Approximately 0.43 miles from Grand Army - 115KV Substation and approximately 2.33 miles from Pottersville / Somerset substations CNR N N PD SEMA A F
1557 11/5/2024 G 6/6/2024 Battery Storage OT BAT 240.1577 240.1577 240.1577 Essex MA 1/1/2028 12/1/2027 115 kV Wakefield Junction Substation CNR N N PD BOST A F
1556 11/6/2024 G 6/6/2024 Battery Storage OT BAT 204.818 204.818 204.818 Worcester MA 10/11/2027 9/27/2027 Eversource 345 kV Line 3361, approximately 3.2 miles from Sherman Road and 7.6 miles from Blackstone. CNR N N PD CMA A F
1555 11/5/2024 G 6/6/2024 Battery Storage OT BAT 214.1568 214.1568 214.1568 Essex MA 1/1/2028 12/1/2027 115KV Line Q-169 between Resco-Saugus Tap and Melrose #2 Tap. Approximately 2.4 miles from Melrose #2 Tap and approximately 2.35 miles from Resco-Saugus Tap CNR N N PD BOST A F
1554 11/7/2024 G 6/7/2024 Battery Storage OT BAT 414.632 414.632 414.632 Providence RI 10/11/2027 9/27/2027 11/7/2024 NEP transmission line: 345 kV line 359, approximately 10.55 miles from West Farnum and 10.81 miles from Kent County substations. CNR N N PD RI W F
1553 12/1/2024 G 6/4/2024 Battery Storage OT BAT 135.6 126.401 126.401 Middlesex MA 5/1/2028 4/15/2028 Primary Point of Interconnection - National Grid Tewksbury 115kV substation, Open position opposite the J-162 line CNR N N PD BOST A F
1552 11/22/2024 G 6/4/2024 Battery Storage OT BAT 133.2 133.2 133.2 Hartford CT 4/1/2028 3/15/2028 11/22/2024 Eversource Energy Corporation owned 115 kV Line 1756 CNR N N PD CT W F
1551 11/7/2024 G 5/31/2024 Battery Storage OT BAT 190 190 190 Worcester MA 1/31/2027 11/30/2026 The Primary Point of Interconnection will be located on the IC’s property (Lat, long: 42°21'44.53"N, 72° 2'22.57"W) by tapping the 115-kV Line A127-4 (Barre-Paxton) at approx. 6km from Barre Substation owned by MA_NGRID. CNR N N PD CMA A F
1550 8/2/2024 G 5/31/2024 Battery Storage OT BAT 76 76 76 Plymouth MA 1/31/2027 11/30/2026 8/2/2024 The Primary Point of Interconnection will be located on the IC’s property (Lat, long: 41°58'7.22"N, 71° 1'18.59"W) by tapping the 115-kV Line U6-4 (Bridgewater-Raynham) at approx. 7,87 Km from Bridgewater Substation. The Alternative Point of Interconnection will be a direct interconnection to the 115-kV bus at Bridgewater Substation owned by MA_NGRID. CNR N N PD SEMA W F
1549 10/18/2024 G 6/3/2024 Battery Storage OT BAT 108 108 108 Providence RI 1/31/2027 11/30/2026 10/18/2024 The Primary Point of Interconnection will be a direct interconnection to the 115-kV bus at Highland Park Substation owned by RI_NGRID. The Alternative Point of Interconnection will be located on the IC’s property (Lat, long: 41°59'46.60"N, 71°28'16.01"W) by tapping the 115-kV Line J16 (Riverside-Highland Park) at approx. 0.27 km from Highland Park Substation. CNR N N PD RI W F
1548 10/17/2024 G 5/31/2024 Battery Storage OT BAT 165.76 165.76 165.76 Providence RI 3/1/2028 1/1/2028 10/17/2024 Primary POI: 42.001693, -71.710650, Eversource Line 347, Sherman Road to Killingly 345kV Alternate POI: 42.001693, -71.710650, Eversource West Farnum to Lake Road 345kV CNR N N PD RI W F
1547 11/5/2024 G 5/31/2024 Solar PV SUN 19.6 Penobscot ME 12/1/2027 11/1/2027 Clifton Switchyard in Clifton, Maine. NR N N PD BHE A F
1546 11/5/2024 G 5/30/2024 Battery Storage OT BAT 202.07 202.07 202.07 Berkshire MA 6/6/2030 12/5/2029 MA_WMECO Partridge 115kV substation. CNR N N PD WMA A F
1545 11/5/2024 G 5/30/2024 Battery Storage OT BAT 100.7521 100.7521 100.7521 Franklin MA 8/1/2028 4/1/2028 MA_WMECO 115 kV Erving Substation Bus No. 116107 CNR N N PD WMA A F
1544 7/3/2024 G 5/29/2024 Battery Storage OT BAT 0 105 105 Franklin MA 12/30/2029 7/9/2029 7/3/2024 115 kV B128 line; 18.88 miles from Barre B128 and 5.3 miles from French King CNR N N NA WMA W F
1543 11/5/2024 G 5/28/2024 Battery Storage OT BAT 588.3 588.3 588.3 Barnstable MA 12/1/2028 9/15/2028 The project will tap the Bourne-Jordan Pond (342) 345kV line with a new three breaker ring bus to connect the project. CNR N N PD SEMA A F
1542 11/5/2024 G 5/28/2024 Battery Storage OT BAT 202.07 202.07 202.07 Hampden MA 1/24/2030 12/23/2029 MA_WMECO Blandford 115kV substation CNR N N PD WMA A F
1541 12/1/2024 G 5/28/2024 Battery Storage OT BAT 101 101 101 Middlesex MA 5/31/2028 5/1/2028 42.385528, -71.490823 on Hudson-Sudbury 115kV line CNR N N PD BOST A F
1540 5/15/2024 G 5/15/2024 EE CT DER Group Study OT BAT 19.999 19.999 19.999 Hartford CT 12/31/2025 12/31/2025 EE Enfield 12C NA N N PD CT A N
1539 5/15/2024 G 5/15/2024 EE CT DER Group Study OT BAT 20 20 20 Middlesex CT 4/5/2027 4/5/2027 EE 30K DOOLEY NA N N PD CT A N
1538 5/15/2024 G 5/15/2024 EE CT DER Group Study OT BAT 4.99 4.99 4.99 New London CT 12/31/2025 12/31/2025 EE Flanders 11Y NA N N PD CT A N
1537 5/15/2024 G 5/15/2024 EE CT DER Group Study OT BAT 4.99 4.99 4.99 New London CT 12/31/2025 12/21/2025 EE 1Q UNCASVILLE NA N N PD CT A N
1536 5/29/2024 G 5/15/2024 EE CT DER Group Study PV SUN 3.74 3.74 3.74 Litchfield CT 7/1/2024 7/1/2024 5/29/2024 EE WINSTED 33B/CAMPVILLE NA N N PD CT W N
1535 5/15/2024 G 5/8/2024 EE 2024 SEMA/Cape ASO Group Study OT SUN BAT 2.805 2.805 2.805 Barnstable MA 12/31/2026 12/31/2026 EE STA_946 Mashpee NA N N PD SEMA A N
1534 5/10/2024 G 5/8/2024 EE 2024 SEMA/Cape ASO Group Study OT SUN BAT 4.98 4.98 4.98 Plymouth MA 12/31/2026 12/31/2026 EE STA_646 Crystal Spring NA N N PD SEMA A N
1533 5/10/2024 G 5/8/2024 EE 2024 SEMA/Cape ASO Group Study OT SUN BAT 16.94 16.94 16.94 Plymouth MA 12/31/2026 12/31/2026 EE STA_713 Tremont NA N N PD SEMA A N
1532 5/10/2024 G 5/8/2024 EE 2024 SEMA/Cape ASO Group Study OT SUN BAT 4.999 4.999 4.999 Plymouth MA 12/31/2026 12/31/2026 EE STA_727 Brook Street NA N N PD SEMA A N
1531 5/15/2024 G 5/8/2024 EE 2024 SEMA/Cape ASO Group Study OT SUN BAT 4.98 4.98 4.98 Plymouth MA 12/31/2024 12/31/2024 EE STA_745 Rochester NA N N PD SEMA A N
1530 5/10/2024 G 5/8/2024 EE 2024 SEMA/Cape ASO Group Study OT SUN BAT 4.999 4.999 4.999 Bristol MA 12/31/2026 12/31/2026 EE STA_624 Wing Lane NA N N PD SEMA A N
1529 5/10/2024 G 5/8/2024 EE 2024 SEMA/Cape ASO Group Study OT BAT 4.99 4.99 4.99 Plymouth MA 12/31/2024 12/31/2024 EE STA_738 Duxbury NA N N PD SEMA A N
1528 5/10/2024 G 5/8/2024 EE 2024 SEMA/Cape ASO Group Study OT BAT 4.9992 4.9992 4.9992 Plymouth MA 12/31/2026 12/31/2026 EE TA_739 Marshfield NA N N PD SEMA A N
1527 5/10/2024 G 5/8/2024 EE 2024 SEMA/Cape ASO Group Study OT SUN BAT 2.5 2.5 2.5 Barnstable MA 12/31/2026 EE STA_933 Falmouth NA N N PD SEMA A N
1526 5/10/2024 G 5/8/2024 EE 2024 SEMA/Cape ASO Group Study OT SUN BAT 4.98 4.98 4.98 Bristol MA 12/31/2026 12/31/2026 EE STA_636 Industrial Park NA N N PD SEMA A N
1525 6/25/2024 G 5/6/2024 Battery Storage OT BAT 134.7 134.7 134.7 New Haven CT 1/31/2027 11/30/2026 6/25/2024 The Primary Point of Interconnection will be located on the IC’s property (Lat, long: 41°28'9.40"N, 73° 7'52.44"W) by tapping the 115-kV Line 1619 (Towantic-Stevenson) at approx. 1.8 Km from Towantic Substation. The Alternative Point of Interconnection will be a direct interconnection to the 115-kV bus at Oxford Substation owned by CT_CL&P. CNR N N PD CT W F
1524 11/5/2024 G 5/6/2024 Battery Storage OT BAT 237.6 237.6 237.6 Hartford CT 1/31/2027 11/30/2026 The Primary Point of Interconnection will be located on the IC’s property (Lat, long: 41°49'19.50"N, 72°43'23.49"W) by tapping the 115-kV Line 1751 (Bloomfield_J-NW.Hartford) at approx. 0.98 km from Bloomfield Substation owned by CT_CL&P. The Alternative Point of Interconnection will be a direct interconnection to the 115-kV bus at Bloomfield Substation owned by CT_CL&P. CNR N N PD CT A F
1523 10/22/2024 G 5/6/2024 Battery Storage OT BAT 253.816 253.816 253.816 Norfolk MA 6/1/2029 4/1/2029 National Grid’s 115kV South Wrentham substation CNR N N PD RI A F
1522 8/16/2024 G 4/25/2024 Battery Storage OT BAT 150 125.5 125.5 Bristol MA 5/1/2028 4/15/2028 8/16/2024 Primary POI will be National Grid Line C-181 (Brayton Point to Reynolds Ave, 115 kV). Primary POI is 10.6 miles from Brayton Point and 1.9 miles from Reynolds Ave. POI Coords: 41.856375, -71.193471 CNR N N PD RI W F
1521 5/6/2024 G 4/22/2024 Solar CNR only PV SUN 0 50 50 Addison VT 5/31/2026 5/1/2026 Vergennes 115 kV Substation CNR N N VT A F
1520 8/23/2024 G 4/16/2024 Battery Storage OT BAT 125 125 125 New Haven CT 5/1/2028 3/1/2028 Primary POI: Eversource Owned 115kV Line # 1142 Alternate POI 1: 115kV Express Feeder to Oxford 26N Substation Alternate POI 2: Eversource Owned 115kV Line # 1403 CNR N N PD CT A F
1519 6/21/2024 G 4/12/2024 Offshore Wind WT WND 1200 1200 1200 NA RI 4/10/2031 7/1/2030 Kent County 345kV CNR N N PD RI A F
1518 8/22/2024 G 4/9/2024 Battery Storage OT BAT 139.5 139.5 139.5 Berkshire MA 8/30/2028 5/31/2028 Eversource, Partridge 115kV Substation CNR N N PD WMA A F
1517 6/20/2024 G 4/9/2024 Battery Storage OT BAT 365.8 365.8 365.8 Franklin MA 8/30/2028 5/31/2028 National Grid 69kV Line E-5D Deerfeild-Shutesbury CNR N N PD WMA A F
1516 6/6/2024 G 4/9/2024 Battery Storage OT BAT 114.7 114.7 114.7 Windsor VT 8/30/2028 5/31/2028 Vermont Electric Power Company (VELCO) Ascutney 115 kV Substation CNR N N PD VT A F
1515 8/23/2024 G 4/9/2024 Battery Storage OT BAT 508.4 508.4 508.4 Berkshire MA 8/30/2028 5/31/2028 Alps-Berkshire 345kV line CNR N N PD WMA A F
1514 8/23/2024 G 4/8/2024 Battery Storage OT BAT 408.1 408.1 408.1 Worcester MA 8/30/2028 5/31/2028 National Grid Barre Tap-Wendell Depot Tap 115kV CNR N N PD CMA A F
1513 8/23/2024 G 4/8/2024 Battery Storage OT BAT 408.1 408.1 408.1 Worcester MA 8/30/2028 5/31/2028 Bear Swamp- Pratts Junction 230kV CNR N N PD CMA A F
1512 5/29/2024 G 4/8/2024 Battery Storage + Solar OT SUN BAT 100.4637 100.4637 100.4637 Franklin MA 12/31/2027 8/31/2027 5/29/2024 New England Power Co, 115 kV, 2.25 miles from E131 TAP 113010 and 3.29 miles from HARRIMAN 113146) (115 kV) CNR N N PD WMA W F
1511 5/15/2024 G 4/8/2024 Battery Storage OT BAT 250.8939 250.8939 250.8939 Hampden MA 12/31/2027 8/1/2027 5/14/2024 Western Massachusetts Electric Company (Eversource Energy) 345kV Ludlow CNR N N PD WMA W F
1510 8/23/2024 G 4/3/2024 Battery Storage OT BAT 152.7552 152.7552 152.7552 Wocester MA 12/31/2027 12/31/2027 Carpenter Hill substation, 115 kV bus, National Grid at open bay CNR N N PD CMA A F
1509 8/23/2024 G 4/3/2024 Battery Storage OT BAT 152.7552 152.7552 152.7552 Worcester MA 12/31/2027 12/31/2027 3-breaker ring bus tapping the W175 line. ESA sub located approximately 0.23 miles from West Charlton 115 kV substation at current coordinates 42° 8'10.02"N 72° 1'30.37"W CNR N N PD CMA A F
1508 9/26/2024 G 4/1/2024 Battery Storage OT BAT 167.1 167.1 167.1 Hartford CT 4/1/2028 3/20/2028 9/26/2024 Primary POI: 345kV Line, Agawam to North Bloomfield Line, POI: 42.031254, -72.698516 Alternative POI: 115kV Line, Tap156253 to North Bloomfield, POI: 42.031274, -72.698830 CNR N N PD CT W F
1507 7/29/2024 G 3/27/2024 Solar Increase PV SUN 25 177.4113 177.4113 Hartford CT 12/15/2028 10/15/2028 To interconnect at the POI of Gravel Pit Solar as an increase to (QP1030 + QP 1247 + QP 1357), the POI is the new Gravel Pit Solar substation at the new three-breaker ring bus on the 115 kV Connecticut Light & Power Company 1200 line between Barbour Hill and Windsor Locks. CNR N N PD CT A F
1506 4/18/2024 G 3/22/2024 Battery Storage OT BAT 152.656 152.656 152.656 Middlesex MA 6/1/2028 5/1/2028 4/18/2024 The proposed POI is tapping Eversource’s 115kV transmission line from Hudson to Sudbury. NR N N PD BOST W F
1505 8/23/2024 G 3/14/2024 Offshore Wind WT WND 1275 1275 1275 NA CT 9/1/2031 3/1/2031 Eversource 345kV Montville Substation CNR N N PD CT A F
1504 3/20/2024 G 3/13/2024 Solar PV SUN 10 10 10 Belknap NH 12/31/2025 12/1/2025 3/20/2024 EE Laconia substation NA N N PD NH W N
1503 3/20/2024 G 3/13/2024 EE Lost Nation Group DG Study PV SUN 9.98 9.98 9.98 Coos NH 12/31/2025 12/1/2025 3/20/2024 EE Lost Nation substation NA N N PD NH W N
1502 6/6/2024 G 3/28/2024 Battery Storage OT BAT 19.3 Franklin VT 7/1/2026 6/1/2026 Direct connection to VELCO 115kV Highgate substation (44.943833, -73.058515) CNR N N PD VT A F
1501 12/11/2024 G 2/29/2024 Battery Storage OT BAT 167.1 167.1 167.1 New London CT 4/1/2028 3/20/2028 12/11/2024 Primary POI: 115kV line 1080 (41.5515028, -72.1253556) , Alternate POI: 115kV line 1000 (41.551478, -72.125294) CNR N N PD CT W F
1500 4/25/2024 G 2/20/2024 Offshore Wind CNR only WT WND 0 1249.5 1249.5 NA MA 11/4/2033 3/27/2033 National Grid Brayton Point 345kV Substation CNR N N RI A F
1499 8/23/2024 G 2/13/2024 Battery Storage OT BAT 115.6 115.6 115.6 Hampden MA 10/31/2026 9/30/2026 Palmer 503 Substation new 115 kV line CNR N N PD WMA A F
1498 5/9/2024 G 2/8/2024 Battery Storage OT BAT 109.52 109.52 110.87 Fairfield CT 12/31/2027 12/15/2027 Direct tap into the Pequonnock 115kV substation in Bridgeport, CT CNR N N PD SWCT A F
1497 5/14/2024 G 2/7/2024 Solar PV SUN 68 68 68 Penobscot ME 7/15/2028 4/15/2028 5/14/2024 Tap on Enfield ME – Passadumkeag 115kV line CNR N N PD BHE W F
1496 5/1/2024 G 2/7/2024 Battery Storage addition(QP1192) OT SUN BAT 101.1158 202.2316 202.2316 Hartford CT 12/15/2027 10/15/2027 To interconnect at the POI of Broadleaf Storage, via a shared facility. It is connected as a tap at existing 345 kV line between N. Bloomfield to Agawam Line. POI is approximately 3.6 mi north of N. Bloomfield and 11.5 mi south of Agawam. CNR N N PD CT A F
1495 4/9/2024 G 2/22/2024 Battery Storage OT BAT 19.3 19.3 19.3 Windsor VT 7/1/2026 6/1/2026 Direct connection to VELCO 115kV Windsor substation (43.48988, -72.40858) CNR N N PD VT A F
1494 1/26/2024 G 1/26/2024 Walpole 146 110A - 2023 EE GB ASO OT SUN BAT 4.99 4.99 4.99 Norfolk MA 12/31/2026 12/31/2026 Eversource Walpole 146 110A NA N N PD SEMA A N
1493 1/26/2024 G 1/26/2024 Medway 65 110B - 2023 EE GB ASO OT SUN BAT 3.9 3.9 3.9 Middlesex MA 12/31/2026 12/31/2026 Eversource Medway 65 110B NA N N PD SEMA A N
1492 1/26/2024 G 1/26/2024 Medway 65 110A - 2023 EE GB ASO OT BAT 4.948 4.948 4.948 Middlesex MA 12/31/2026 12/31/2026 Eversource Medway 65 110A NA N N PD SEMA A N
1491 1/26/2024 G 1/26/2024 Canton 470 110A - 2023 EE GB ASO OT BAT 4.99 4.99 4.99 Norfolk MA 12/31/2026 12/31/2026 Eversource Canton 470 110A NA N N PD SEMA A N
1490 1/23/2024 G 1/17/2024 EE Mansfield Center DG Cluster PV SUN 19.975 19.975 19.975 Tolland CT 12/31/2024 6/30/2024 EE Card St 11F NA N N PD CT A N
1489 1/23/2024 G 1/17/2024 EE Mansfield Center DG Cluster OT SUN BAT 10.799 10.799 10.799 Tolland CT 7/27/2025 12/29/2024 EE Mansfield 12J NA N N PD CT A N
1488 9/25/2024 G 1/11/2024 Offshore Wind WT WND 1275 1275 1275 NA CT 9/1/2031 3/1/2031 ETU QP1309 (new switchyard proposed at intersection of 345kV transmission lines 364, 371, 383, 310, and 348) CNR N N PD CT A F
1487 1/10/2024 G 1/9/2024 EE CT DG Group Study PV SUN 5 5 5 New Haven CT 12/31/2024 12/31/2024 EE Oxford 26N NA N N PD CT A N
1486 5/1/2024 G 1/2/2024 Battery Storage OT BAT 300 300 300 New Haven CT 6/30/2027 4/30/2027 Bunker Hill 115kV substation CNR N N PD SWCT A F
1485 8/7/2024 G 1/2/2024 Offshore Wind CNR WT WND 0 1200 1200 NA CT 5/31/2031 1/31/2031 8/7/2024 Eversource (CL&P) 345kV Montville Substation CNR N N CT W F
1484 6/28/2024 G 12/29/2023 CMP Moshers/Prides Corner 115 kV SS - Greater Portland Area DG Study OT SUN WAT 7.24 7.24 7.24 Cumberland ME 12/31/2024 12/31/2024 CMP Moshers/Prides Corner 115 kV Substation NA Y N CMP PD ME A N
1483 6/28/2024 G 12/29/2023 CMP Elm St 115 kV SS - Greater Portland Area DG Study PV SUN 4.97 4.97 4.97 Cumberland ME 12/31/2024 12/31/2024 CMP Elm St 115 kV Substation NA Y N CMP PD ME A N
1482 6/28/2024 G 12/29/2023 CMP Spring St 115 kV SS - Greater Portland Area DG Study PV SUN 4.98 4.98 4.98 Cumberland ME 12/31/2024 12/31/2024 CMP Spring St 115 kV Substation NA Y N CMP PD ME A N
1481 6/28/2024 G 12/29/2023 CMP Vallee Lane 115 kV SS - Louden-Biddeford Area DG Study PV SUN 1.99 1.99 1.99 Cumberland ME 12/31/2024 12/31/2024 CMP Vallee Lane 115 kV Substation NA Y N CMP PD ME A N
1480 2/26/2024 G 12/29/2023 CMP Biddeford IP 115 kV SS - Louden-Biddeford Area DG Study PV SUN 4.95 4.95 4.95 York ME 12/31/2024 12/31/2024 CMP Biddeford IP 115 kV Substation NA Y Y CMP ME A N
1479 6/28/2024 G 12/29/2023 CMP West Buxton 115 kV SS - Louden-Biddeford Area DG Study PV SUN 4.5 4.5 4.5 York ME 12/31/2024 12/31/2024 CMP West Buxton 115 kV Substation NA Y N CMP ME A N
1478 3/8/2024 G 12/28/2023 Battery Storage OT BAT 50 50 50 Hampden MA 5/25/2028 2/24/2028 A new 115kV POI Station tie-in to the Pleasant-Blandford Line adjacent to the existing Eversource Blanford Substation CNR N N PD WMA A F
1477 12/19/2023 G 12/19/2023 NG DG @ Sykes Road OT BAT 9.998 9.998 9.998 Bristol MA 12/31/2025 12/31/2025 NG Sykes Rd 282TR (M13N) NA N N PD SEMA A N
1476 1/2/2024 G 12/18/2023 NG NEMA Group DER Study OT BAT 5 5 5 Middlesex MA 12/31/2025 12/31/2025 NG East Tewksbury T1 NA N N PD BOST A N
1475 1/2/2024 G 12/18/2023 NG NEMA Group DER Study OT SUN BAT 4.998 4.998 4.998 Essex MA 12/31/2025 12/31/2025 NG Newbury 60-4T NA N N PD BOST A N
1474 1/2/2024 G 12/18/2023 NG NEMA Group DER Study OT BAT 9.982 9.982 9.982 Essex MA 12/31/2025 12/31/2025 NG King St T3 NA N N PD BOST A N
1473 1/26/2024 G 12/14/2023 Battery Storage OT BAT 202.07 202.07 202.07 Hampden MA 4/4/2028 2/23/2028 1/22/2024 MA_WMECO Blandford 115kV substation CNR N N PD WMA W F
1472 1/26/2024 G 12/12/2023 Battery Storage OT BAT 108 108 108 Providence RI 1/31/2027 11/30/2026 1/9/2024 The Primary Point of Interconnection will be a direct interconnection to the 115-kV bus at Highland Park Substation owned by RI_NGRID. The Alternative Point of Interconnection will be located on the IC’s property (Lat, long: 41°59'46.60"N, 71°28'16.01"W) by tapping the 115-kV Line J16 (Riverside-Highland Park) at approx. 0.27 km from Highland Park Substation. CNR N N PD RI W F
1471 2/1/2024 G 12/12/2023 Battery Storage OT BAT 134.7 134.7 134.7 New Haven CT 1/31/2027 11/30/2026 2/1/2024 The Primary Point of Interconnection will be located on the IC’s property (Lat, long: 41°28'9.40"N, 73° 7'52.44"W) by tapping the 115-kV Line 1619 (Towantic-Stevenson) at approx. 1.8 Km from Towantic Substation. The Alternative Point of Interconnection will be a direct interconnection to the 115-kV bus at Oxford Substation owned by CT_CL&P. CNR N N PD CT W F
1470 2/1/2024 G 12/12/2023 Battery Storage OT BAT 237.6 237.6 237.6 Hartford CT 1/31/2027 11/30/2026 2/1/2024 The Primary Point of Interconnection will be located on the IC’s property (Lat, long: 41°49'19.50"N, 72°43'23.49"W) by tapping the 115-kV Line 1751 (Bloomfield_J-NW.Hartford) at approx. 0.98 km from Bloomfield Substation owned by CT_CL&P. The Alternative Point of Interconnection will be a direct interconnection to the 115-kV bus at Bloomfield Substation owned by CT_CL&P. CNR N N PD CT W F
1469 2/15/2024 G 12/12/2023 Battery Storage OT BAT 190 190 190 Worcester MA 1/31/2027 11/30/2026 2/15/2024 The Primary Point of Interconnection will be located on the IC’s property (Lat, long: 42°21'44.53"N, 72° 2'22.57"W) by tapping the 115-kV Line A127-4 (Barre-Paxton) at approx. 6km from Barre Substation owned by MA_NGRID. CNR N N PD CMA W F
1468 1/26/2024 G 12/12/2023 Battery Storage OT BAT 76 76 76 Plymouth MA 1/31/2027 11/30/2026 1/26/2024 The Primary Point of Interconnection will be located on the IC’s property (Lat, long: 41°58'7.22"N, 71° 1'18.59"W) by tapping the 115-kV Line U6-4 (Bridgewater-Raynham) at approx. 7,87 Km from Bridgewater Substation. The Alternative Point of Interconnection will be a direct interconnection to the 115-kV bus at Bridgewater Substation owned by MA_NGRID. CNR N N PD SEMA W F
1467 12/18/2024 G 12/12/2023 Battery Storage OT BAT 69.4 69.4 69.4 Worcester MA 10/31/2026 9/30/2026 National Grid 69KV Meadow Street 552 Substation CNR N N PD CMA A F
1466 6/11/2024 G 12/5/2023 Winslow-County Rd Lakewood 115 kV SS - Winslow-County Rd-Lakewood 2 DG Study PV SUN 22.96 22.96 22.96 Kennebec/Somerset ME 12/31/2024 12/31/2024 CMP Winslow-County Rd Lakewood 115 kV substation NA Y N CMP PD ME A N
1465 6/11/2024 G 12/5/2023 Augusta E/Puddledock/Bowman St 115 kV SS - Midcoast Area DG Study OT SUN BAT 27.53 27.53 27.53 Kennebec ME 12/31/2024 12/31/2024 CMP Augusta E/Puddledock/Bowman St 115 kV substation NA Y N CMP PD ME A N
1464 2/5/2024 G 12/5/2023 Wind Repower WT WND 0 35.2 35.2 Caledonia VT 12/31/2026 11/16/2026 VELCO, 115kV, Sheffield Substation 44.663509, -72.123160 CNR N N PD VT A F
1463 11/27/2023 G 11/22/2023 EE Valley DG Group Study PV SUN 8 8 8 Plymouth MA 12/31/2026 12/31/2026 EE Valley 715 substation NA N N PD SEMA A N
1462 2/20/2024 G 11/27/2023 Battery Storage OT BAT 115 115 115 Norfolk MA 12/20/2029 11/25/2029 2/20/2024 Tap on Belmont 115 kV - Stoughton Tap 115 kV Line with three breaker ring bus scheme. POI is located at the 1.75 miles from Stoughton 115kV substation and the 2.8 miles from Belmont Substation. Latitude: 42.09564, Longitude: -71.08200 CNR N N PD SEMA W F
1461 5/1/2024 G 10/18/2023 Battery Addition OT KER BAT 1.498 165.38 169.25 Rockingham NH 9/1/2025 8/1/2025 400 Gosling Road, Portsmouth, New Hampshire. The project will interconnect to the 115kV Bus 1 & 2 at Schiller Substation, directly adjacent to the project’s proposed location on the former coal storage space directly to the southeast of Schiller Substation. CNR N N PD NH A F
1460 9/25/2024 G 10/12/2023 Battery Storage OT BAT 706.3 706.3037 706.3037 Bristol MA 9/30/2027 9/15/2027 Primary POI: NG Brayton Point 345kV substation Alternate POI: Customer built substation with a tap into the west-most 345kV line exiting the NG 345kV Brayton Point substation CNR N N PD RI A F
1459 11/21/2023 G 10/2/2023 Bath 115 kV SS - Midcoast Area DG Study PV SUN 3.43 3.43 3.43 Lincoln ME 12/31/2024 12/31/2024 CMP Bath 115 kV Substation NA Y N CMP PD ME A N
1458 11/21/2023 G 10/2/2023 Lincolnville 115 kV SS - Midcoast Area DG Study PV SUN 4.95 4.95 4.95 Lincoln ME 12/31/2024 12/31/2024 CMP - Lincolnville 115 kV Substation NA Y N CMP PD ME A N
1457 11/21/2023 G 10/2/2023 Mason 115 kV SS - Midcoast Area DG Study PV SUN 3.94 3.94 3.94 Lincoln ME 12/31/2024 12/31/2024 CMP Mason 115 kV Substation NA Y N CMP PD ME A N
1456 11/21/2023 G 10/2/2023 Topsham 115 kV SS - Midcoast Area DG Study PV SUN 3.94 3.94 3.94 Waldo/Sagadahoc ME 12/31/2024 12/31/2024 CMP Topsham 115 kV Substation NA Y N CMP PD ME A N
1455 11/21/2023 G 10/2/2023 Highland/Park St 115 kV SS - Midcoast Area DG Study PV SUN 2 2 2 Knox ME 12/31/2024 12/31/2024 CMP Highland/Park St 115 kV Substation NA Y N CMP PD ME A N
1454 11/21/2023 G 10/2/2023 Newcastle 115 kV SS - Midcoast Area DG Study PV SUN 16.58 16.58 16.58 Cumberland/Kennedbec/Sagadahoc/Lincoln ME 12/31/2024 12/31/2024 CMP Newcastle 115 kV Substation NA Y N CMP PD ME A N
1453 11/21/2023 G 10/2/2023 Coopers Mills 115 kV SS - Midcoast Area DG Study PV SUN 2.88 2.88 2.88 Lincoln ME 12/31/2024 12/31/2024 CMP Coopers Mills 115 kV Substation NA Y N CMP PD ME A N
1452 8/12/2024 G 10/5/2023 Battery Storage OT BAT 151.286 151.286 151.286 Worcester MA 5/28/2027 3/26/2027 8/8/2024 The Primary Point of Interconnection will be a new 3-breaker-ring bus located on the IC’s property (Lat, long: 42.322909, -71.984654) which connects to T line A127-4 at 115 KV (Barre Substation to Paxton Substation). The POI distance following the T Line is approximately 7.66 miles from the Barre Substation and approximately 3.04 miles from the Paxton Substation. The Alternative Point of Interconnection will be a new 3-breaker ring bus located on the IC’s property (Lat, long: 42.322909, -71.984654) which connects to T line B128-5 at 115 KV (Treasure Valley Substation to Barre Substation). The POI distance following the T Line is approximately 0.2 miles from the Treasure Valley Substation and 7.66 miles from the Barre Substation. CNR N N PD CMA W F
1451 7/30/2024 G 10/5/2023 Offshore wind WT WND 1309 1309 1309 NA MA 9/27/2030 12/27/2029 7/30/2024 Primary: Pottersville 115kV Substation, Secondary: Bridgewater 345kV Substation CNR N N PD SEMA W F
1450 11/21/2023 G 9/29/2023 Woodstock 115 kV SS - Roxbury-Rumford-Woodstock Area DG Study PV SUN 1.623 1.623 1.623 Oxford ME 12/15/2024 12/15/2024 CMP Woodstock 115 kV Substation NA Y N CMP PD ME A N
1449 11/21/2023 G 9/29/2023 Sturtevant 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area Study PV SUN 12.949 12.949 12.949 Franklin ME 12/30/2024 6/1/2024 CMP Sturtevant 115 kV Substation NA Y N CMP PD ME A N
1448 11/21/2023 G 9/29/2023 Ludden Lane 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study PV SUN 1.999 1.999 1.999 Oxford ME 6/1/2024 6/1/2024 CMP Ludden Lane 115 kV Substation NA Y N CMP PD ME A N
1447 11/21/2023 G 9/29/2023 Leeds 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study PV SUN 4.999 4.999 4.999 Androscoggin ME 9/1/2024 9/1/2024 CMP Leeds 115 kV Substation NA Y N CMP PD ME A N
1446 6/28/2024 G 9/29/2023 Raymond 115 kV SS - Raymond Area DG Study PV SUN 25.07 25.07 25.07 Cumberland ME 6/20/2025 9/1/2024 CMP Raymond 115 kV Substation NA Y N CMP PD ME A N
1445 12/15/2023 G 9/21/2023 Solar PV SUN 51.5 51.5 51.5 Somerset ME 12/15/2027 10/15/2027 12/15/2023 The CMP 115 kV Chase Pond substation being built on Section 222. CNR N N ME W F
1444 11/6/2023 G 9/21/2023 Battery Storage OT BAT 250 250 250 Norfolk MA 9/15/2027 7/15/2027 11/6/2023 National Grid’s 115kV South Wrentham substation NR N N PD SEMA W F
1443 11/20/2023 G 9/20/2023 Battery Storage OT BAT 200 202.6914 202.6914 Rockingham NH 12/30/2026 12/1/2026 11/20/2023 Project will interconnect will be a shared facility at QP-1428's POI - via tap at existing 115 kV line between Eversource 115kV Scobie Pond - Pulpit Rock Line A184 115kV. CNR N N PD NH W F
1442 9/4/2024 G 9/18/2023 Battery Storage OT BAT 151.576 151.576 151.576 Bristol MA 5/31/2027 3/31/2027 9/4/2024 Primary: Eversource 115 kV Cross Road Line 111, alternate: line 109 CNR N N PD SEMA W F
1441 11/2/2023 G 9/18/2023 Battery Storage OT BAT 103 103 103 Hampden MA 5/31/2027 3/26/2027 11/2/2023 Eversource Southwick Substation (115 KV) CNR N N PD WMA W F
1440 4/22/2024 G 9/18/2023 Battery Storage OT BAT 151.556 151.556 151.556 Hampden MA 5/31/2027 3/26/2027 The Primary Point of Interconnection will be a new 3-breaker ring bus located on the IC’s property connecting to Eversource T line 1314 (Agawam to Chicopee) at 115 KV. The POI substation would be 3.39 miles from the Chicopee Substation and 3.66 miles from the Agawam substation. The electric line placement percentage from the Chicopee substation is 48%. Alternative POI: The Alternative Point of Interconnection will be a new 3-breaker ring bus located on the IC’s property connecting to T line 1904 (Piper to Memorial Drive) at 115 KV CNR N N PD WMA A F
1439 10/29/2024 G 9/18/2023 Battery Storage OT BAT 151.306 151.306 151.306 Hampshire MA 5/31/2027 3/26/2027 10/29/2024 The Primary Point of Interconnection will be a new 3-breaker ring bus located on the IC’s property which connects to Eversource T line 1113 (Fairmont to Tillson) at 115 KV. The break in the line will take place 4.52 miles from the Fairmont Substation and 10.55 miles from the Tillson substation. The distance from the line break to the 3-breaker ring bus located on the IC’s property will be approximately 0.22 miles. The approximate latitude/longitude coordinates of the 3-breaker ring bus is 42.249111, -72.533752. The Alternative Point of Interconnection will be a new 3-breaker ring bus located on the IC’s property which connects to Eversource T line 1134 (Fairmont to Five Corners) at 115 KV. The break in the line will take place 4.52 miles from the Fairmont Substation and 0.11 miles from the Five Corners Substation. The distance from the line break to the 3-breaker ring bus located on the IC’s property will be approximately 0.22 miles. The approximate latitude/longitude coordinates of the 3-breaker ring bus is 42.249111, -72.533752. CNR N N BL WMA W F
1438 12/12/2023 G 10/10/2023 Solar PV SUN 15.58 15.58 15.58 York ME 12/31/2024 12/15/2024 12/11/2023 CMP 34.5 kV, Section 182 CNR N N PD ME W F
1437 1/2/2024 G 8/31/2023 Battery Storage OT BAT 103.32 103.32 103.5 New London CT 2/1/2029 1/15/2029 Montville to Gales Ferry 115kV line 1787, approximately 0.5mi north of Montville Substation CNR N N PD CT A F
1436 1/2/2024 G 8/29/2023 Battery Storage OT BAT 300 300 300 New London CT 6/1/2028 4/1/2028 Line tap of the Eversource 1235 115 kV Line approximately 1200’ from Uncasville 115kV SS CNR N N PD CT A F
1435 11/13/2024 ETU 8/21/2023 Non-controllable objective ETU to enable additional 1200 MW (to QP1309) injection near Millstone sub NA N/A 1200 New London CT 12/30/2030 5/1/2030 11/12/2024 N/A N/A N N PD CT W F
1434 6/20/2024 G 8/15/2023 Battery Storage OT BAT 160 160 160 Franklin MA 12/31/2027 10/31/2027 6/19/2024 Lat Long is 42.6254349775399, -72.56881378900127 The NG Harriman - Montague 115 kV line (Y-177) Distances: 3.35 miles to Montague and 20.67 miles to Harriman CNR N N PD WMA W F
1433 6/20/2024 G 8/15/2023 Battery Storage OT BAT 100 100 100 Hampden MA 12/31/2027 10/31/2027 6/19/2024 Lat Long is 42.13610456666797, -72.27784889556564 This is the National Grid's Little Red Road - Palmer 115 kV line (W-175). The POI is approximately 1.56 miles (23.9%) from the Palmer substation and 4.97 miles (76.1%) to the Little Rest Road substation CNR N N PD WMA W F
1432 8/15/2024 G 8/11/2023 Battery Storage OT BAT 256.53 256.53 256.98 New London CT 9/30/2028 9/15/2028 8/15/2024 Direct tap into the 115kV Uncasville Substation CNR N N PD CT W F
1431 8/9/2023 G 8/9/2023 Battery Storage OT BAT 7 7 7 Hartford CT 12/29/2024 12/1/2024 Eversource Northwest Hartford 2N NA N N PD CT A N
1430 4/25/2024 G 8/9/2023 Battery Storage OT BAT 237.545 237.545 237.545 Bristol MA 10/17/2027 9/16/2027 115 kV line C181N - Circuit 1. Alternate POI : 345 kV line 327 - Circuit 1 CNR N N PD RI A F
1429 8/11/2023 G 8/8/2023 Wind WT WND 197.4 197.4 197.4 Aroostook ME 10/1/2028 5/1/2028 CMP Orrington - Albion Road 345kV line CNR N N PD BHE Third Maine Resource Integration Study A F
1428 11/5/2024 G 7/25/2023 Solar PV SUN 101.549 101.549 101.549 Rockingham NH 12/30/2025 12/1/2025 A tap at existing 115 kV line between Eversource 115kV Scobie Pond - Pulpit Rock Line A184 115kV. * The new tap will be located at approx. 42.9292184N, -71.2567898W and along a ~6 mile segment of Line A184 (approx. 4.9 miles northeast of Scobie Pond and approx. 1.1 miles southwest of Pulpit Rock). CNR N N PD NH A F
1427 11/5/2024 G 7/21/2023 Solar PV SUN 253.61 253.6103 253.6103 York ME 10/1/2027 7/1/2027 Lebanon, Maine Line 391 Buxton Sub (CMP) to Scobie Pond (Eversource). GPS coordinates of the POI: 43°22'51.59"N, 70°55'57.74"W. ** This new tap is located approximately 27.8 miles southwest of Buxton substation and approx. 39.9 miles northeast of the Scobie Pond substation. CNR N N PD ME A F
1426 12/10/2024 G 7/14/2023 Battery Storage OT BAT 528.75 528.75 529.61 Bristol MA 3/31/2028 3/15/2028 12/10/2024 Primary POI is a direct tap into the Pottersville substation in Somerset, MA utilizing shared interconnection facilities with QP1412. Secondary POI is a direct tap into the Pottersville substation. Tertiary POI is a customer substation with a tap into the "Bell Rock Road 118 to Pottersville Station 115 kV" line, 1/2 mile east of the Pottersville substation. CNR N N PD SEMA W F
1425 9/4/2024 G 7/10/2023 Battery Storage OT BAT 151.596 151.596 151.596 Hampden MA 10/1/2026 7/1/2026 9/4/2024 Western Massachusetts Electric Co South Agawam Switching Station (115 kv) via a new breaker bay CNR N N PD WMA W F
1424 8/15/2023 G 7/10/2023 Battery Storage OT BAT 41.2 41.2 41.2 Worcester MA 9/1/2026 6/1/2026 8/15/2023 New England Power Company Westminster Switching Station (69KV Line) CNR N N PD CMA W F
1423 9/25/2024 G 7/10/2023 Battery Storage OT BAT 121.6 121.6 121.6 Worcester MA 9/1/2026 6/1/2026 9/4/2024 The Primary Point of Interconnection will be a new 3-breaker ring bus located on the IC’s property which will connect to National Grid T-Line H160 (Northboro Rd to Hudson) at 115 KV. The approximate line-break location will be 0.26 miles from Northboro Rd substation and 7.92 miles from Hudson Substation. The Alternative POI will be a new 3-breaker ring bus located on the IC’s property which connects to T-Line N166 (Northboro Rd to N.Marloboro) at 115 KV. CNR N N PD CMA W F
1422 4/25/2024 G 7/7/2023 Battery Storage OT BAT 326 326 326 Hartford CT 2/2/2029 12/1/2028 Barbour Hill Substation 115kV direct connection ( 41.854810, -72.528106) CNR N N PD CT A F
1421 1/26/2024 G 7/6/2023 Battery Storage OT BAT 175.67 175.67 175.67 Bristol MA 9/8/2024 8/8/2024 1/26/2024 41.987864, -71.265095 Tapping to National Grid 115kV line C181 CNR N N PD SEMA W F
1420 9/24/2024 G 6/29/2023 Battery Storage OT BAT 175.097 175.097 175.097 New London CT 12/31/2027 9/30/2027 Existing Eversource 115kV structure on Line 1410, West of 39 Dock Road (41.430126, -72.103424). CNR N N PD CT A F
1419 3/6/2024 G 6/28/2023 Battery Storage OT BAT 108.7 108.7 108.7 Bristol MA 4/1/2027 3/1/2027 3/6/2024 National Grid 115KV Bates Street Substation CNR N N PD SEMA W F
1418 12/5/2023 G 6/27/2023 Battery Storage OT BAT 108.7 108.7 108.7 Providence RI 4/1/2027 3/1/2027 11/30/2023 115KV Line Q143S-2 between Woonsocket and Franklin Square substations, approximately 10 miles from Woonsocket substation. CNR N N PD RI W F
1417 12/11/2024 G 6/26/2023 Battery Storage OT BAT 300 300 300 Windham CT 6/1/2028 4/1/2028 12/11/2024 Eversource 115kV Killingly Substation CNR N N PD CT W F
1416 8/9/2023 G 6/26/2023 Battery Storage OT BAT 196 196 196 Hampshire MA 5/19/2027 5/12/2027 8/8/2023 Eversource 115 KV Line Number 1447 CNR N N PD WMA W F
1415 9/26/2024 G 6/20/2023 Battery Storage OT BAT 261.9 261.9 261.9 Worcester MA 8/12/2024 7/12/2024 9/26/2024 POI interconnection coordinates: 42.471953, -71.734165 Interconnecting to National Grid 345kV line (line ID: 343) via line tap (approx. 8.5 mi from Wachusett Substation and 14.9 mi from Sandy Pond Substation). CNR N N PD CMA W F
1414 6/20/2023 G 6/19/2023 Individual @ Piper FC FC 4.1 4.1 4.1 Hampden MA 12/31/2026 12/31/2026 EE Piper 21N NA N N PD WMA A N
1413 6/20/2023 G 6/19/2023 Group @ Orchard OT SUN BAT 4.04 4.04 4.04 Hampden MA 12/31/2026 12/31/2026 EE Orchard 27A NA N N PD WMA A N
1412 9/20/2023 G 6/20/2023 Battery Storage OT BAT 179.47 179.47 179.84 Bristol MA 9/30/2027 9/15/2027 Direct tap into the Pottersville Substation in Somerset, MA CNR N N PD SEMA A F
1411 8/17/2023 ETU 6/20/2023 1200 MW controllable ETU - unidirectional NA N/A 1200 Middlesex MA 5/31/2032 12/31/2031 8/17/2023 Eversource Mystic 345 kV Substation N/A N N PD BOST W F
1410 6/16/2023 G 6/13/2023 Individual @ Amherst OT BAT 2 2 2 Hampshire MA 12/31/2024 12/1/2024 EE Amherst 17K NA N N PD WMA A N
1409 6/16/2023 G 6/13/2023 Individual @ Montague OT BAT 4.99 4.99 4.99 Franklin MA 12/31/2024 12/1/2024 EE MONTAGUE 21C NA N N PD WMA A N
1408 6/16/2023 G 6/13/2023 Individual @ Partridge OT SUN BAT 4 4 4 Berkshire MA 12/31/2024 12/1/2024 EE Partridge 15E1 NA N N PD WMA A N
1407 6/16/2023 G 6/13/2023 EE Group @ Blandford OT SUN BAT 28.936 28.926 28.936 Hampshire MA 12/31/2024 12/1/2024 EE BLANDFORD 19J NA N N PD WMA A N
1406 6/16/2023 G 6/13/2023 EE Group @ Doreen OT SUN BAT 9.15 9.15 9.15 Berkshire MA 12/31/2024 12/1/2024 EE Doreen 19A NA N N PD WMA A N
1405 6/16/2023 G 6/13/2023 EE Group @ Southwick OT SUN BAT 7 7 7 Hampden MA 12/31/2024 12/1/2024 EE SOUTHWICK 29A NA N N PD WMA A N
1404 6/16/2023 G 6/13/2023 Individual @ French King OT SUN BAT 2.2 2.2 2.2 Franklin MA 12/1/2024 EE French King 21B NA N N PD WMA A N
1403 9/19/2023 G 6/9/2023 Battery Storage OT BAT 304.72 304.72 304.72 Middlesex CT 11/20/2026 6/12/2026 Scoville 345kV substation CNR N N PD CT A F
1402 9/8/2023 G 6/7/2023 Battery Storage OT BAT 171.6 171.6 171.6 Hampden MA 6/1/2027 5/1/2027 POI interconnection coordinates: 42.068458, -72.462254 Interconnecting to the 115kV open bay at the NGRID West Hampden substation (connecting to T3's current position). CNR N N PD WMA A F
1401 9/8/2023 ETU 6/7/2023 controllable 345 kV ETU - Brayton Point to Pottersville NA N/A Bristol MA 12/31/2029 6/30/2029 N/A N/A N N PD SEMA A F
1400 9/8/2023 G 5/18/2023 Battery Storage OT BAT 101.97 101.97 101.97 Hartford CT 12/31/2026 7/31/2026 41.6317, -72.7289, Berlin 115 kV Substation CNR N N PD CT A F
1399 9/8/2023 G 5/18/2023 Battery Storage OT BAT 92.438 92.438 92.438 Hampden MA 5/31/2027 3/31/2027 The proposed POI is Buck Pond 115 kV substation, share gen leadline with QP1117. CNR N N PD WMA A F
1398 12/4/2024 G 5/8/2023 Battery Storage OT BAT 101.97 101.97 101.97 Worcester MA 12/31/2026 7/31/2026 12/3/2024 A newly constructed three-breaker ring bus that will sectionalize National Grid’s Fitzwilliam to Flagg Pond 115 kV transmission line I-135 at about 7.48 miles from the East Winchendon Substation and 6.34 miles from the Flagg Pond Substation CNR N N PD CMA W F
1397 4/25/2024 G 5/5/2023 Battery Storage OT BAT 100.24 100.2358 100.2358 Worcester MA 12/31/2026 7/31/2026 42.31815556, -71.98500556, Treasure Valley 115 kV Substation CNR N N PD CMA A F
1396 3/6/2024 G 5/5/2023 Battery Storage OT BAT 101.97 101.97 101.97 Providence RI 12/31/2026 7/31/2026 41.82919444, -71.52111667, Hartford 115 kV Substation CNR N N PD RI A F
1395 10/13/2023 G 5/5/2023 Battery Storage OT BAT 20 20 20 Hampshire MA 6/30/2027 6/30/2027 5/22/2023 National Grid 115 kV Line 1134 CNR N N PD WMA W F
1394 9/8/2023 G 5/4/2023 Battery Storage Addition OT BAT 0 284.05 284.05 Middlesex CT 7/1/2026 5/1/2026 POI between 10F-2T-2 and 10F-1T-1 breakers on the 345 kV bus; Northeast Utilities 11631 Substation - Middletown. CNR N N PD CT A F
1393 9/13/2023 G 5/3/2023 Gas Turbine GT NG 233 233 233 Fairfield CT 6/1/2026 5/4/2026 9/13/2023 Eversource Middleriver substation 115kv CNR N N PD SWCT W F
1392 2/2/2024 G 5/3/2023 Battery Storage OT BAT 53.74 53.74 53.74 New Haven CT 9/15/2026 8/15/2026 Latitude: 41.492036°, Longitude: -72.762080° -Owner: Connecticut Light and Power Company, Voltage 115 kV, Substation Name: North Wallingford 115 kV Station. CNR N N PD CT A F
1391 4/28/2023 G 4/28/2023 Wind CNR WT WND 0 26.01 26.01 Washington ME 11/1/2023 11/1/2023 Keene Rd Substation via through a 115kV Line 56 from Stetson Mountain115/34.5kV substation CNR N N BHE A F
1390 4/28/2023 G 4/28/2023 Wind CNR WT WND 0 34.485 34.485 Hancock ME 11/1/2023 11/1/2023 Bull Hill 115 kV Switching Station CNR N N BHE A F
1389 4/28/2023 G 4/27/2023 Wind CNR WT WND 0 58.14 58.14 Washington ME 11/1/2023 11/1/2023 Keene Rd Substation via through a 115kV Line 56 from Stetson Mountain115/34.5kV substation CNR N N BHE A F
1388 4/28/2023 G 4/27/2023 Wind CNR WT WND 0 61.2 61.2 Penobscot ME 11/1/2023 11/1/2023 Keene Rd Substation via through a 115kV Line 55 & Line 56 from Rollins Mountain115/34.5kV CNR N N BHE A F
1387 11/13/2024 ETU 4/27/2023 Non-controllable objective ETU to enable 1200 MW offshore wind/300 MW solar at Crystal Springs sub NA N/A Plymouth MA 12/30/2030 12/31/2029 11/12/2024 N/A N/A N N PD SEMA W F
1386 10/4/2024 G 4/26/2023 Battery Storage OT BAT 100 100 100 Berkshire MA 12/31/2026 10/31/2026 10/4/2024 National Grid Berkshire - Plainfield 115 kV line Lat/Long: 42.49627608454711, -73.01015449707741 CNR N N PD WMA W F
1385 10/23/2024 G 4/26/2023 Battery Storage OT BAT 200 233 233 Worcester MA 12/31/2026 9/1/2026 7/29/2024 National Grid's: Bellows Fall (37.18 mi) - E. Winchendon Tap (2.07 mi) 115kV line (J136N) NR N N PD CMA W F
1384 10/23/2024 G 4/26/2023 Battery Storage OT BAT 300 300 300 Worcester MA 12/31/2026 9/1/2026 7/29/2024 National Grid's Pratts Junction - Sandy Pond L138W-2 line (115 kV). 2.92 miles from Pratts Junction and 11.95 miles from Sandy Pond (on 115 kV line). Coordinates: 42.493249051839484, -71.7028083287439 CNR N N PD CMA W F
1383 12/15/2023 G 4/13/2023 Solar and Battery PV SUN BAT 139 139 139 Penoboscot ME 12/31/2028 9/1/2028 12/15/2023 44°46'22.13"N, 68°29'5.84"W new switching station to tie into Versant 115 kV line in Clifton CNR N N ISO-NE NA BHE W F
1382 6/5/2023 G 4/11/2023 Vineyard Offshore Wind CNR WT WND 0 843.2 843.2 N/A MA 10/31/2024 1/2/2024 Eversource (NSTAR) 115kV Barnstable Switch Station (958) CNR N N ISO-NE NA SEMA A F
1381 9/8/2023 ETU 4/11/2023 1200 MW (+/- 400 kV) HVDC External ETU NA N/A 1200 Grafton NH 7/1/2029 1/1/2029 In New Hampshire, the point of interconnection is near the old Monroe yard (AC capacitors and reactors and Phase II filters presently reside in this yard). The project will tie into the currently existing Comerford 230 kV substation. The northern section of the project will connect with the Hydro-Quebec system at the US-Canada border near Canaan, Vermont. NI N N ISO-NE NA NH A F
1380 6/5/2023 G 4/6/2023 Fuel Cell CNR FC FC 0 20.1 20.1 Hartford CT 12/15/2024 5/28/2024 The electrical connection where Eversource's 69 kV 680 line span from pole 2742 connects to the Farmington River Power Company's 680 line at pole 2743's insulator. CNR N N CT A F
1379 4/6/2023 G 4/3/2023 Solar PV SUN 218.4 218.4 218.4 Aroostook ME 10/31/2028 9/30/2028 Pittsfield Station. Pittsfield 345 kV substation is located between the existing Orrington - Albion Road line (3023) near the town of Pittsfield. CNR N N PD BHE Third Maine Resource Integration Study A F
1378 12/12/2023 G 4/3/2023 Battery Storage OT BAT 105 105 105 Windsor VT 4/8/2027 3/8/2027 12/12/2023 Vermont Electric Power Company, Ascutney 115 kV. CNR N N PD VT W F
1377 12/12/2023 G 4/3/2023 Battery Storage OT BAT 180 180 180 Windsor VT 4/8/2027 3/8/2027 12/12/2023 Vermont Electric Power Company, Coolidge 115 kV CNR N N VT W F
1376 10/9/2024 G 3/29/2023 Battery Storage OT BAT 325.7 325.7 325.7 New Haven CT 4/1/2027 3/1/2027 10/8/2024 115KV Line #1640 between Devon 2 & Wallingford substations, approximately 2.15 circuit miles from Wallingford substation CNR N N PD CT W F
1375 3/29/2023 G 3/29/2023 Wind WT WND 217 217 217 Aroostook ME 12/9/2026 10/8/2026 Pittsfield Station. Pittsfield 345 kV substation is located between the existing Orrington - Albion Road line (3023) near the town of Pittsfield. CNR N N PD BHE Third Maine Resource Integration Study A F
1374 10/15/2024 G 3/28/2023 Battery Storage OT BAT 226 226 226 Merrimack NH 4/7/2027 3/31/2027 Eversource 115 kV Line C196. CNR N N PD NH A F
1373 7/25/2023 G 3/15/2023 Battery Storage Increase (QP1362) OT BAT 140.48 743 743 Norfolk MA 11/12/2027 6/25/2027 Eversource's West Medway 345kV station CNR N N PD SEMA A F
1372 5/3/2023 ETU 3/15/2023 Non-controllable ETU - bi-directional NA N/A Lincoln ME 6/1/2028 6/1/2028 5/3/2023 New 345 kV Transmission Line from Maine Yankee 345 Substation (existing) to Coopers Mills 345 Substation (existing) N/A N N ME W F
1371 4/5/2023 ETU 3/10/2023 Non-controllable ETU - N to S flow only NA N/A Somerset /Lincoln ME 6/1/2028 6/1/2028 New Pittsfield Substation lat/long 44.795/-69.386 Existing Coopers Mills 345 kV Station lat/long 44.2966/-69.556771 N/A N N ME Third Maine Resource Integration Study A F
1370 3/15/2023 ETU 3/10/2023 1200 MW non-controllable ETU - N to S flow only NA N/A 1200 Aroostook/Somerset ME 6/1/2028 6/1/2028 Transmission line connects between the new Aroostook station and Pittsfield station. Pittsfield 345 kV substation is located between the existing Orrington - Albion Road line in Somerset county at Lat/Long 44.795/-69.386. The Aroostook station will be located in Aroostook county at Lat/Long 45.7634/-68.0278 N/A N N ME Third Maine Resource Integration Study A F
1369 11/21/2023 G 3/8/2023 Athens 115 kV SS - CMP Wyman Area Study PV SUN 1.992 1.992 1.992 Somerset ME 12/31/2024 CMP Athens substation, Circuit 827D2 NA Y Y CMP PD ME A N
1368 4/12/2023 G 3/9/2023 Battery Storage OT BAT 240.8 240.8 240.8 Essex MA 4/1/2027 3/1/2027 4/12/2023 National Grid 115KV Line Q169 - Approximately 0.5 Miles from Lynn Substation CNR N N PD BOST W F
1367 12/5/2023 G 3/9/2023 Battery Storage OT BAT 271.4 271.4 271.4 Bristol MA 4/1/2027 3/1/2027 11/30/2023 National Grid 115KV Line U6 between Pottersville and Bridgewater substations - approximately 6.1 circuit miles from Bridgewater substation CNR N N PD SEMA W F
1366 8/19/2024 G 3/9/2023 Battery Storage OT BAT 200.84 200.84 200.84 Fairfield CT 11/20/2026 6/12/2026 8/19/2024 Peaceable 115 kV station CNR N N PD SWCT W F
1365 7/7/2023 G 3/9/2023 Battery Storage OT BAT 301.26 301.26 301.26 Hampden MA 11/20/2026 6/12/2026 Connect to South Agawam 115 kV switchyard CNR N N PD WMA A F
1364 11/5/2024 G 3/1/2023 Battery Storage OT BAT 401.68 401.68 401.68 Rockingham NH 11/20/2026 6/12/2026 Timber Swamp Rd 345 kV station CNR N N PD NH A F
1363 11/5/2024 G 3/1/2023 Battery Storage OT BAT 301.26 301.26 301.26 Hampden MA 11/20/2026 6/12/2026 Ludlaw 345 kV station CNR N N PD WMA A F
1362 7/25/2023 G 2/24/2023 Battery Storage Increase (QP1238) OT BAT 301.26 602.52 602.52 Norfolk MA 11/12/2027 6/25/2027 Eversource's West Medway 345kV station CNR N N PD SEMA A F
1361 9/8/2023 G 2/24/2023 Offshore Wind WT WND 882 882 882 NA MA 2/15/2030 10/1/2029 9/8/2023 RIE, Jepson 115 kV Substation CNR N N PD SEMA W F
1360 2/23/2023 G 2/22/2023 Battery Storage OT BAT 10 10 10 Middlesex CT 6/15/2024 6/1/2024 CLP 11C Haddam, Circuit 11C13 NA N N PD CT A N
1359 3/9/2023 G 2/22/2023 Fuel Cell FC FC 1.84 1.84 1.84 Hartford CT 12/31/2024 11/30/2024 CLP Northwest Hartford 2N, Circuit 2N14 NA N N CT A N
1358 7/7/2023 G 2/21/2023 Battery Storage OT BAT 100 100 100 Hartford CT 7/31/2026 6/30/2026 Tap on South Windsor to Manchester 115kV line. CNR N N PD CT A F
1357 10/1/2024 G 2/16/2023 Solar Increase PV SUN 5 152.045 152.045 Hartford CT 6/15/2026 5/15/2026 To interconnect at the POI of Gravel Pit Solar (QP 1030 + QP 1247), as an increase to QP 1030 and QP1247, the POI is the new Gravel Pit Solar substation at the new three-breaker ring bus on the 115 kV Connecticut Light & Power Company 1200 line between Barbour Hill and Windsor Locks. CNR Y Y PD CT A F
1356 10/15/2024 G 2/9/2023 (Offshore wind Increase (Q700 +Q1154) WT WND 38.8 895 895 NA MA 10/30/2026 3/14/2026 10/14/2024 Eversource 345kV West Barnstable (921) CNR N N PD SEMA W F
1355 4/19/2023 G 2/6/2023 Battery Storage OT BAT 136.32 136.32 136.32 New Haven CT 10/1/2024 9/1/2024 POI is the Devon 115 kV Bus 2 between 7R-19T2 and 7R-23T-2 breakers NR N N PD SWCT A F
1354 4/13/2023 G 2/6/2023 Battery Storage OT BAT 289.29 289.29 289.29 Middlesex CT 10/1/2024 9/1/2024 4/13/2023 POI between 5A-5T-2 and 5A-6T-2; Northeast Utilities 11631 Substation - Middletown CNR N N PD CT W F
1353 4/19/2023 G 2/6/2023 Battery Storage OT BAT 289.29 289.29 289.29 New London CT 10/1/2024 9/1/2024 Montville 4J between 4J-11T-2 and 4J-12T-2. Interconnected with Montville Unit 6. New Montville Unit 6 Generator breaker will be installed for sync control. CNR N N PD CT A F
1352 7/7/2023 G 2/6/2023 Battery Storage OT BAT 262.68 262.68 262.68 New Haven CT 10/1/2024 9/1/2024 POI: East Shore Substation 115 kV CNR N N PD CT A F
1351 7/7/2023 G 2/6/2023 Battery Storage OT BAT 156.24 156.24 156.24 Fairfield CT 10/1/2027 8/1/2027 Owner: UI, Substation: Singer 345 kV CNR N N PD SWCT A F
1350 8/24/2023 ETU 1/31/2023 1200 MW Controllable ETU NA N/A 1200 RI 12/31/2029 9/1/2029 8/24/2023 POI at Rhode Island Energy's Kent county Substations, See assocation reference drawings N/A N N PD RI W F
1349 1/27/2023 G 1/26/2023 Scitico DG Cluster OT SUN BAT 5.2 5.2 5.2 Hartford CT 12/31/2023 7/1/2023 Eversource Scitico 27H/27H1 NA N N PD CT A N
1348 3/9/2023 G 1/26/2023 Battery Storage OT BAT 5.057 5.057 5.057 Middlesex CT 7/27/2025 6/25/2025 Eversource Portland 21H NA N N PD CT A N
1347 1/27/2023 G 1/26/2023 Enfield DG Cluster OT SUN BAT 18.77 18.77 18.77 Hartford CT 7/27/2025 12/31/2023 Eversource Enfield 12C/Windsor Locks 14K NA N N PD CT A N
1346 10/9/2024 G 1/12/2023 Battery Storage OT BAT 196.468 196.468 196.468 Hartford CT 9/15/2026 9/8/2026 10/9/2024 Eversource, North Bloomfield Substation, 345kV BUS. CNR N N PD CT W F
1345 12/18/2024 G 1/10/2023 Battery Storage OT BAT 75 75 75 New London CT 6/1/2025 4/1/2025 Shunock 115kV Substation, Pendleton Hill Substation, North Stonington, CT 06359 CNR N N PD CT A F
1344 12/30/2022 G 12/28/2022 Offshore Wind CNR only WT WND 0 827 827 NA MA 10/15/2025 8/15/2025 Eversource 345 kV West Barnstable Substation CNR N N SEMA A F
1343 9/19/2023 G 12/19/2022 Offshore Wind WT WND 1200 1200 1200 NA MA 12/15/2029 7/15/2029 National Grid 115 kV Pottersville CNR N N SEMA A F
1342 2/6/2023 G 12/15/2022 Western Maine Wind CNR WT WND 0 58.8 58.8 Somerset ME 12/20/2024 11/22/2024 CMP 115 kV Section 222 - coordinates 45° 9'30.90"N, 69°51'1.40"W CNR N N ME A F
1341 1/30/2023 G 12/6/2022 Battery Storage OT BAT 117.3 667.425 667.425 Bristol MA 6/30/2027 6/15/2027 1/30/2023 National Grid's Brayton Point 345kV Substation, Somerset MA. CNR N N PD SEMA W F
1340 1/30/2023 G 12/6/2022 Battery Storage OT BAT 292.52 550.12 550.12 Bristol MA 6/30/2027 6/15/2027 1/30/2023 National Grid's Brayton Point 345kV Substation, Somerset MA. CNR N N PD SEMA W F
1339 1/30/2023 G 12/6/2022 Battery Storage OT BAT 257.06 257.06 257.06 Bristol MA 6/30/2027 6/15/2027 1/30/2023 National Grid's Brayton Point 345kV Substation, Somerset MA. CNR N N PD SEMA W F
1338 7/30/2024 G 12/6/2022 Battery Storage OT BAT 275.06 275.06 275.06 Hampden MA 6/30/2027 6/15/2027 7/30/2024 Agawam to Ludlow - 345kV line, 2.5 miles west of Ludlow substation CNR Y N ISO-NE PD WMA W F
1337 11/17/2023 G 11/22/2022 Battery Storage OT BAT 130 130 130 Berkshire MA 12/31/2026 7/1/2026 11/17/2023 7,500' to Adams - NG Q117 VEL - 65,000' Bennington 115 kV line (42.72482385, -73.09931100). (The project site is on the western side of the transmission line off a gravel bank road and on the opposite side of the small solar array) CNR N N PD WMA W F
1336 1/5/2024 G 11/22/2022 Battery Storage OT BAT 130 130 130 Worcester MA 12/31/2026 7/1/2026 1/5/2024 Carpenter Hill - North Oxford - Millbury #2 115 kV (V-174) line (2.57 miles from the N. Oxford substation and 6.92 miles from the Millbury #2 substation). CNR N N PD CMA W F
1335 10/9/2024 G 11/10/2022 Battery Storage OT BAT 205.8 205.8 205.8 Bristol MA 4/1/2027 3/1/2027 10/8/2024 Non-PTF 115KV lines ET and W owned by TMLP between Cleary Flood Substation and Substation #16 (W Water St), approximately 1.26 miles from Cleary Flood. Project would interconnect half of the net MW capability to each line. CNR N N PD SEMA W F
1334 10/9/2024 G 11/10/2022 Battery Storage OT BAT 93.2 93.2 93.2 New London CT 5/1/2027 4/1/2027 10/8/2024 115 kV line 1070 between Ft Hill Farms and Stockhouse Substations, interconnected by a new three-breaker ring bus approximately 2.5 miles from Ft Hill Farms substation. CNR N N PD CT W F
1333 1/30/2024 ETU 11/8/2022 2400 controllable ETU - unidirectional NA N/A 1100 CT 5/31/2028 3/31/2028 1/30/2024 1. Singer 345kV Substation existing available circuit breaker position and new circuit breaker position. 2. Offshore platform at the MA/RI BOEM Wind Energy Areas N/A N N SWCT W F
1332 11/22/2023 ETU 11/8/2022 Enable 1200 MW injection at Mystic NA N/A 1200 MA 12/30/2029 5/1/2029 11/22/2023 N/A N/A N N PD BOST W F
1331 12/19/2023 G 11/2/2022 Battery Storage OT BAT 300 300 300 Hampden MA 12/23/2025 12/16/2025 12/19/2023 Interconnecting to POI coordinates (42.148537, -72.300019) on 115 kV Transmission line X-176, approximately 0.3 miles north of Palmer #503 substation and 5.76 miles from Thorndike #523 substation. CNR N N PD WMA W F
1330 12/19/2022 G 11/1/2022 Solar PV SUN 46.5 46.5 46.5 Sullivan NH 12/20/2023 11/17/2023 12/16/2022 43.177488°, -72.434553° - National Grid 115kV line CNR N N NH W F
1329 5/19/2023 G 10/24/2022 Solar PV SUN 54.4 54.4 54.4 Grafton NH 6/5/2024 5/15/2024 5/19/2023 POI: (44.321330°, -72.003124°), National Grid's PTF 230 kV bus at Comerford No. 18 station CNR N N PD NH W F
1328 4/28/2023 G 10/24/2022 Solar PV SUN 21.44 21.44 21.44 Grafton NH 6/5/2024 5/15/2024 4/27/2023 44.336047°, -71.874785°, National Grid 230 kV Substation CNR N N PD NH W F
1327 2/14/2023 G 10/20/2022 Battery Storage OT BAT 270 270 270 Norfolk MA 12/2/2023 11/2/2023 2/14/2023 West Walpole substation CNR N N PD SEMA W F
1326 10/13/2023 G 10/19/2022 Battery Storage OT BAT 40 40 40 Kent RI 12/30/2027 12/15/2027 10/13/2023 Line tap on the S-171 South 115 kV transmission line, roughly 4 miles from West Cranston Substation and 1.5 miles from Drumrock Substation. NR N N PD RI W F
1325 6/4/2024 G 10/19/2022 Battery Storage OT BAT 305 307.8 307.8 Providence RI 12/30/2027 12/15/2027 5/31/2024 NEP transmission line: 345 kV line 359, approximately 10.55 miles from West Farnum and 10.81 miles from Kent County substations. CNR N N PD RI W F
1324 10/27/2024 G 10/18/2022 Battery Storage OT BAT 55 55 55 Providence RI 12/30/2027 12/15/2027 10/23/2024 115 kV Line T-172N approximately 1.38 mi from Farnum Pike and 1.09 mi from Putnam Pike Substations CNR N N PD RI W F
1323 11/28/2022 ETU 10/11/2022 Non-controllable ETU from Line 3023 substation to Coopers Mills substation NA N/A ME 12/31/2027 10/8/2027 11/2/2022 New substation on line 3023 (per QP1227 ) to Coopers Mills Substation, Windsor Kennebec, ME, 04363 N/A N N PD ME W F
1322 11/28/2022 ETU 10/11/2022 Non-controllable ETU from Line 388 substation to Coopers Mills substation NA N/A ME 12/31/2027 10/8/2027 11/2/2022 New substation on line 388 (per QP1228 ) to Coopers Mills Substation, Windsor Kennebec, ME, 04363 N/A N N PD ME W F
1321 12/1/2022 TS 10/6/2022 NEP LNS NA N/A 17.56 17.56 17.56 Somerset MA 12/1/2024 12/1/2024 11/30/2022 NEP 115 kV Brayton Point N/A N N PD SEMA W F
1320 9/23/2024 G 10/7/2022 Battery Storage OT BAT 203.95 203.95 203.95 Worcester MA 11/16/2027 11/1/2027 National Grid 115KV Line R144 between Millbury No. 2 and Woonsocket substations - approximately 5.8 circuit miles from Woonsocket substation. CNR Y N PD SEMA A F
1319 8/26/2024 G 10/7/2022 Battery Storage OT BAT 141.6 141.6 141.6 Litchfield CT 2/23/2028 1/4/2028 115 kV line between Rocky River and Bulls Bridge substations CNR Y N CT A F
1318 7/20/2023 TS 10/3/2022 GRID LNS NA N/A 9 45 39 Middlesex/Worcester MA 10/3/2023 10/1/2023 7/3/2023 GRID 69 kV transmission lines U-21S and U-21E N/A N N PD CMA W F
1317 1/18/2024 ETU 9/30/2022 non-controllable objective ETU to enable 1200 MW injection near Norwalk substation NA N/A Fairfield CT 12/30/2029 5/1/2029 1/18/2024 N/A N/A N N SWCT W F
1316 8/28/2023 G 9/30/2022 Solar plus Battery OT SUN BAT 102 102 102 Cheshire NH 10/28/2027 10/28/2027 8/25/2023 Eversource 115kV line L163 CNR N N NH W F
1315 10/2/2024 G 9/29/2022 Battery Storage OT BAT 106.97 106.97 106.97 Windham CT 6/12/2026 6/9/2026 10/2/2024 Eversource Killingly Substation,115kV BUS, Tracy Rd, Killingly, CT 06241, 41.881384, -71.891162 CNR N N PD CT W F
1314 10/15/2024 G 9/27/2022 Offshore Wind WT WND 470 470 470 NA MA 11/1/2029 9/1/2029 10/14/2024 Eversource 115kV Acushnet, lines 112/114 NR N N PD SEMA W F
1313 9/26/2022 ETU 9/23/2022 NY ETU QP1125 NA N/A 0 0 0 St. Lawrence-Lewis NY 12/31/2025 12/1/2025 Moses/Adirondack/Poter Path N/A N N PD N/A A N
1312 7/17/2024 ETU 9/26/2022 non-controllable ETU - inc the simultaneous injection capacity to 2400 MW at Brayton Pt 345 kV sub NA N/A Somerset MA 12/30/2028 9/29/2028 N/A N/A N N PD RI A F
1311 10/1/2024 TS 9/23/2022 RNS - move load to new substation NA N/A 20 85.32 50.6 Plymouth MA 7/1/2026 7/1/2026 Wareham Street to new South Middleborough Substation N/A Y Y ISO-NE PD SEMA A F
1310 12/11/2023 G 9/23/2022 Battery Storage OT BAT 118.75 118.75 118.75 Berkshire MA 10/31/2025 9/30/2025 12/8/2023 115 kV Transmission line (1211 - Present between Doreen and Oswald substation) CNR N N PD WMA W F
1309 11/13/2024 ETU 9/23/2022 non-controllable objective ETU to enable 1200 MW injection near Millstone substation NA N/A 1200 New London CT 12/30/2029 5/1/2029 11/12/2024 N/A N/A N N PD CT W F
1308 11/21/2023 G 9/9/2022 Uxbridge Substation – NG Hopedale West Group Study OT BAT 6.994 6.994 6.994 Worcester MA 12/31/2025 11/15/2025 NG Feeder 321W6, Uxbridge T2 NA Y N NGRID PD SEMA A N
1307 11/21/2023 G 9/9/2022 Whitins Pond Substation – NG Hopedale West Group Study OT BAT 4.948 4.948 4.948 Worcester MA 12/31/2025 11/15/2025 NG Feeder 320W5, Whitins Pond T1 NA Y N NGRID PD SEMA A N
1306 11/21/2023 G 9/9/2022 Whitins Pond Substation – NG Hopedale West Group Study OT BAT 4.948 4.948 4.948 Worcester MA 12/31/2025 11/15/2025 NG Feeder 320W4, Whitins Pond T2 NA Y N NGRID PD SEMA A N
1305 11/21/2023 G 9/9/2022 Depot Street Substation – NG Hopedale West Group Study OT SUN BAT 1.5 1.5 1.5 Worcester MA 12/31/2025 11/15/2025 NG Feeder 335W1 (7U), Depot Street T1 and T2 NA Y N NGRID PD SEMA A N
1304 11/21/2023 G 9/9/2022 Uxbridge Substation – NG Hopedale West Group Study OT BAT 4.99 4.99 4.99 Worcester MA 12/31/2025 11/15/2025 NG Feeder 321W6, Uxbridge T2 NA Y N NGRID PD SEMA A N
1303 5/25/2023 G 9/22/2022 Battery Storage OT BAT 11.9 11.9 11.9 Franklin MA 5/28/2027 2/26/2027 5/25/2023 Eversource 21B8, 13.8 kV CNR N N PD WMA W F
1302 3/24/2023 G 9/22/2022 Battery Storage OT BAT 9.11 8.5 8.5 Franklin MA 5/28/2027 2/26/2027 3/24/2023 Eversource 21C1, Montague Substation,13.8 kV CNR N N PD WMA W F
1301 12/9/2022 G 9/6/2022 Battery Storage OT BAT 10 10 10 Worcester MA 5/15/2025 3/15/2025 12/9/2022 National Grid Feeder 01-21W1, Leicester Substation, 13.8 kV CNR N N PD CMA W F
1300 10/4/2022 G 8/19/2022 Solar plus Battery Increase (QP1129) OT SUN BAT 0.04 2.5 2.5 Bristol MA 8/31/2022 8/31/2021 10/4/2022 The primary connection of the proposed project to Eversource Energy is located at the Wing Lane substation #624 Transformer #1 Line #240. The site is located approximately 0.26 circuit miles from Substation 624 near PSS/E node 111293(Wing Lane 13.2 KV) CNR N N SEMA W F
1299 6/28/2024 G 8/18/2022 Solar Increase (QP1145) PV SUN 54.1 74.8 74.8 Hancock ME 9/25/2026 9/11/2026 Versant 115kV Line 57 (new ring bus located 0.7 miles north of Versant's 115kV substation). CNR Y Y ISO-NE PD BHE A F
1298 6/4/2024 G 8/16/2022 Battery Storage OT BAT 157.92 157.92 157.92 Worcester MA 6/30/2027 6/15/2027 5/31/2024 Eversource 345 kV Line 3361, approximately 3.2 miles from Sherman Road and 7.6 miles from Blackstone. CNR N N PD CMA W F
1297 9/13/2022 G 8/15/2022 Offshore Wind WT WND 1200 1200 1200 NA MA 5/31/2029 1/31/2029 9/13/2022 National Grid Brayton Point 345 kV Substation CNR N N PD SEMA W F
1296 12/10/2024 G 8/10/2022 Battery Storage OT BAT 125 125 125 Hartford CT 4/1/2027 3/15/2027 12/10/2024 Eversource Energy Corporation 115 kV line 1756 CNR Y N PD CT W F
1295 8/13/2024 G 8/9/2022 Solar plus Battery OT SUN BAT 205 205 205 Aroostook ME 11/28/2025 9/3/2025 8/13/2024 Orrington-Albion Rd 345kV line (3023) near the town of Pittsfield (approximately 19 miles from Albion Rd Substation) CNR N N PD ME W F
1294 6/6/2023 G 7/27/2022 Solar PV SUN 75.32 75.32 75.32 Washington ME 8/4/2026 7/21/2026 6/6/2023 Ring Bus constructed for QP760 on Versant 115kV Line 52 CNR N N PD BHE W F
1293 11/21/2023 TS 7/13/2022 GRID RNS NA N/A 12 183.7 183.7 Middlesex MA 8/1/2025 8/1/2025 NGRID 115 kV T146 line N/A Y Y ISO-NE PD BOST A F
1292 5/1/2023 G 7/12/2022 Battery Storage OT BAT 95 95 95 Worcester MA 9/30/2023 8/30/2023 5/1/2023 National Grid 115 kV E-157W line three-breaker ring bus location: 0.32 miles north of Millbury 2 station along transmission line; 2.62 miles south of Wyman station along transmission line (the length of the Millbury 2 - Wyman Gordon line is 2.94 miles). Three-breaker ring bus will be located <0.01 miles east of POI. CNR N N PD CMA W F
1291 12/6/2022 G 6/9/2022 Turners Falls CNR HD WAT 0 0.937 0.937 Franklin MA 11/15/2022 11/15/2022 The POI is at 13.8 kV where the conductors from WMECO's pole 70/460H1 attach to the Interconnection Customer's building on the other side of the canal. CNR N N WMA C F
1290 3/30/2023 G 6/8/2022 Group @ Wing Lane 624 - EMA ASO OT SUN BAT 14.979 14.979 14.979 Bristol MA 11/30/2023 9/30/2023 Eversource Wing Lane 624 NA N N PD SEMA A N
1289 3/30/2023 G 6/8/2022 Group @ West Pond 737 - EMA ASO OT SUN BAT 6.982 6.982 6.982 Middlesex MA 11/30/2023 9/30/2023 Eversource West Pond 737 NA N N PD SEMA A N
1288 3/30/2023 G 6/8/2022 Wellfleet 976 - EMA ASO OT SUN BAT 4.107 4.107 4.107 Barnstable MA 11/30/2023 9/30/2023 Eversource Wellfleet 976 NA N N PD SEMA A N
1287 3/30/2023 G 6/8/2022 Valley 715 - EMA ASO OT SUN BAT 3.7 3.7 3.7 Plymouth MA 11/30/2023 9/30/2023 Eversource Valley 715 NA N N PD SEMA A N
1286 3/30/2023 G 6/8/2022 Tremont 713 - EMA ASO OT SUN BAT 4.996 4.996 4.996 Plymouth MA 11/30/2023 9/30/2023 Eversource Tremont 713 NA N N PD SEMA A N
1285 3/30/2023 G 6/8/2022 Sandwich 916 - EMA ASO OT SUN BAT 4.6 4.6 4.6 Barnstable MA 11/30/2023 9/30/2023 Eversource Sandwich 916 NA N N PD SEMA A N
1284 3/30/2023 G 6/8/2022 Group @ Orleans 975 - EMA ASO OT SUN BAT 9.998 9.998 9.998 Barnstable MA 11/30/2023 9/30/2023 Eversource Orleans 975 NA N N PD SEMA A N
1283 3/30/2023 G 6/8/2022 Mashpee 946 - EMA ASO OT SUN BAT 1.49 1.49 1.49 Barnstable MA 11/30/2023 9/30/2023 Eversource Mashpee 946 NA N N PD SEMA A N
1282 3/30/2023 G 6/8/2022 Marshfield 739 - EMA ASO OT SUN BAT 4.6 4.6 4.6 Plymouth MA 11/30/2023 9/30/2023 Eversource Marshfield 739 NA N N PD SEMA A N
1281 3/30/2023 G 6/8/2022 Group @ Industrial Park 636 - EMA ASO OT SUN BAT 16.514 16.514 16.514 Bristol MA 11/30/2023 9/30/2023 Eversource Industrial Park 636 NA N N PD SEMA A N
1280 3/30/2023 G 6/8/2022 Hyannis 961 - EMA ASO OT SUN BAT 4.993 4.993 4.993 Barnstable MA 11/30/2023 9/30/2023 Eversource Hyannis 961 NA N N PD SEMA A N
1279 3/30/2023 G 6/8/2022 Group @ Hatchville 936 - EMA ASO OT SUN BAT 18.486 18.486 18.486 Barnstable MA 11/30/2023 9/30/2023 Eversource Hatchville 936 NA N N PD SEMA A N
1278 3/30/2023 G 6/8/2022 Harwich 968 - EMA ASO OT SUN BAT 3.998 3.998 3.998 Barnstable MA 11/30/2023 9/30/2023 Eversource Harwich 968 NA N N PD SEMA A N
1277 3/30/2023 G 6/8/2022 Fisher Road 657 - EMA ASO OT SUN BAT 3 3 3 Bristol MA 11/30/2023 9/30/2023 Eversource Fisher Road 657 NA N N PD SEMA A N
1276 3/30/2023 G 6/8/2022 Falmouth 933 - EMA ASO OT SUN BAT 3.5 3.5 3.5 Barnstable MA 11/30/2023 9/30/2023 Eversource Falmouth 933 NA N N PD SEMA A N
1275 3/30/2023 G 6/8/2022 Group @ Duxbury 738 - EMA ASO OT SUN BAT 6.782 6.782 6.782 Plymouth MA 11/30/2023 9/30/2023 Eversource Duxbury 738 NA N N PD SEMA A N
1274 3/30/2023 G 6/8/2022 Crystal Spring 646 - EMA ASO OT SUN BAT 1.7 1.7 1.7 Plymouth MA 11/30/2023 9/30/2023 Eversource Crystal Spring 646 NA N N PD SEMA A N
1273 3/30/2023 G 6/8/2022 Canton 470 - EMA ASO OT SUN BAT 4.999 4.999 4.999 Norfolk MA 11/30/2023 9/30/2023 Eversource Canton 470 NA N N PD SEMA A N
1272 10/29/2024 G 6/8/2022 West Springfield 45 MW BESS OT BAT 45 45 45 Hampden MA 5/8/2026 12/1/2025 West Springfield Station, 115kV Bus (existing 8C-3X 140 MVA transformer; position WS#2). CNR Y N ISO-NE PD WMA A F
1271 9/1/2022 ETU 6/7/2022 Non-Controllable ETU - Pittsfield to Coopers Mills flow only NA N/A Somerset/Lincoln ME 12/1/2027 10/1/2027 New Pittsfield substation (per QP1230) Pittsfield Somerset ME 04967 Coopers Mills substation Windsor Kennebec ME 04363 N/A N N PD ME Third Maine Resource Integration Study A F
1270 7/24/2023 G 5/31/2022 Nutmeg Solar CNR Only PV SUN 0 19.9 19.9 Hartford CT 12/7/2020 11/15/2020 Scitico 115 kV CNR N N CT C F
1269 8/10/2023 G 5/27/2022 Sanford Airport Solar CNR Only PV SUN 0 50 50 York ME 8/2/2023 8/2/2023 Cyro Drive substation 115 kV CNR N N ME C F
1268 12/7/2022 G 5/24/2022 Coolidge Solar CNR Only PV SUN 0 19.9 19.9 Windsor VT 12/20/2018 12/12/2018 115 kV Coolidge Substation CNR N N VT C F
1267 6/27/2022 G 5/20/2022 Battery Storage OT BAT 51.73 51.73 51.73 New London CT 8/8/2025 7/25/2025 6/24/2022 Groton Utilities Buddington Substation, 69kV bus (future 115kV) Alternate POI: Groton Utilities Buddington Substation, 34.5kV bus CNR N N PD CT W F
1266 9/4/2024 G 5/23/2022 Battery Storage OT BAT 100 100 100 Hartford CT 8/4/2025 7/3/2025 8/28/2024 115kV Manchester Substation (Bus# 120074) Geographic coordinates: 41.76948781166102, -72.56130136574556 CNR N N PD CT W F
1265 5/10/2023 G 5/23/2022 Revolution Offshore Wind CNR only WT WND 0 750.75 750.75 NA RI 9/7/2025 7/1/2025 NG 115 kV Davisville Substation, Washington County CNR N N RI A F
1264 1/12/2023 G 5/19/2022 Bear Swamp Pump Load increase PS WAT 0 333 333 Berkshire MA 1/6/2023 1/4/2023 The existing POI of the Bear Swamp generating station. NR Y N ISO-NE PD WMA C F
1263 7/13/2023 G 7/1/2022 Battery Storage OT BAT 18.87 Hampshire MA 10/27/2023 10/20/2023 7/13/2023 POI Coordinates: 42.42649, -72.53956, Feeder: 18G6, Express feeder, Owner of POI: WMECO (Eversource), Distribution Voltage Level: 13.8 kV, Substation Voltage Level: 115 kV - 13.8 kV CNR N N PD WMA W F
1262 8/29/2024 G 5/17/2022 Battery Storage OT BAT 80.875 80.875 80.875 Middlesex CT 7/6/2026 6/18/2026 8/29/2024 Haddam 115kV BUS [HADDAM(120632)]; 41°27'38.74"N, 72°28'38.23"W CNR Y N PD CT W F
1261 8/12/2024 G 5/17/2022 Battery Storage Addition (to QP1086) OT SUN BAT 0 160 160 Knox ME 11/30/2026 10/31/2026 CMP 115kV line Section 80 CNR Y Y ISO-NE PD ME A F
1260 8/31/2022 G 5/6/2022 Solar plus Battery OT SUN BAT 2.772 2.6888 2.6888 Hampden MA 6/1/2023 6/1/2023 8/31/2022 Eversource 13.8 kV Line 19S1 CNR N N WMA W F
1259 8/2/2024 G 6/15/2022 Battery Storage OT BAT 20 20 20 Berkshire MA 6/28/2027 3/28/2027 Eversource 115 kV Line 1231 (Berkshire - Plainfield) CNR Y N ISO-NE WMA A F
1258 1/25/2024 G 5/3/2022 Battery Storage CNR Only OT BAT 0 170 170 Norfolk MA 7/26/2027 6/26/2027 National Grid's South Wrentham 115kV Substation CNR N N SEMA A F
1257 5/3/2022 G 5/3/2022 Solar PV SUN 319.2 319.2 319.2 Aroostook ME 12/9/2026 10/8/2026 Pittsfield Station. Pittsfield 345 kV substation is located between the existing Orrington - Albion Road line (3023) near town of Pittsfield. CNR N N PD BHE Third Maine Resource Integration Study A F
1256 5/3/2022 G 5/3/2022 Wind WT WND 905 905 905 Aroostook ME 12/9/2026 10/8/2026 Pittsfield Station. Pittsfield 345 kV substation is located between the existing Orrington - Albion Road line (3023) near town of Pittsfield. CNR N N PD BHE Third Maine Resource Integration Study A F
1255 5/31/2023 G 5/2/2022 Detroit/Guilford/Belfast DG Area Study OT SUN BAT 103.77 103.77 103.77 Piscataquis/Penobscot/Somerset/Waldo/Hancock ME 12/31/2027 12/31/2027 CMP Detroit 115 kV Substation NA Y Y CMP PD ME A N
1254 6/11/2024 G 5/2/2022 Kimball DG Area Study OT SUN BAT 24.546 24.546 24.546 York/Oxford/Cumberland ME 6/30/2028 6/30/2028 CMP Kimball Road/Lovell 115 kV Substation NA Y Y CMP PD ME A N
1253 11/14/2023 G 4/27/2022 Battery Storage CNR Only (see QP887) OT BAT 0 150 150 Norfolk MA 5/31/2026 4/30/2026 11/14/2023 Wareham Substation 115kV, Eversource Line 113 CNR N N SEMA W F
1252 10/1/2024 G 4/21/2022 Battery Storage OT BAT 314.7 314.7 314.7 Essex MA 6/1/2026 2/15/2026 Ward Hill 345 kV Substation CNR Y Y PD BOST A F
1251 8/26/2022 G 4/11/2022 Battery Storage OT BAT 60 60 60 Hartford CT 12/31/2024 10/15/2024 8/26/2022 To interconnect at the POI of Gravel Pit Solar QP 1030, via a Shared Facility, QP 1030 is described as a line cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks. CNR N N PD CT W F
1250 5/19/2023 G 4/14/2022 Battery Storage OT BAT 50.7 50.7 50.7 York ME 11/1/2024 9/1/2024 5/18/2023 CMP Goosefare 115kV Substation 43 31 22 N 70 26 59 W CNR N N ME W F
1249 3/28/2023 G 4/19/2022 Battery Storage Addition OT BAT 0 16.02 16.02 New London CT 5/14/2027 3/12/2027 3/28/2023 Tunnel 23 kV Substation CNR N N CT W F
1248 2/23/2023 G 4/6/2022 Battery Storage OT BAT 154.656 154.656 154.656 Bristol MA 5/31/2026 3/1/2026 NGRID 115kV Robinson Ave substation CNR N N PD RI A F
1247 5/29/2024 G 4/5/2022 Solar PV SUN 25 25 25 Hartford CT 11/1/2025 10/1/2025 To interconnect at the POI of Gravel Pit Solar QP 1030, via a Shared Facility, QP 1030 is described as a line cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks. CNR Y Y ISO-NE PD CT A F
1246 7/25/2023 G 3/31/2022 Solar PV SUN 150 150 150 Grafton NH 11/1/2025 10/1/2025 7/25/2023 230 kV Comerford to North Litchfield A201Line; alternative POI is B-202. NR N N PD NH W F
1245 10/1/2024 G 3/31/2022 Solar PV SUN 150 150 150 Hartford CT 11/1/2028 10/1/2028 345kV Line 3419 Tap between Meekville Junction/Barbour Hill (PSSE Bus Number: 119103) To LudlowPSSE Bus Number: 116045) NR Y Y PD CT A F
1244 1/10/2023 G 3/31/2022 Solar PV SUN 75 75 75 Franklin ME 11/1/2025 10/1/2025 11/14/2022 115 kV New Sturtevant Substation (PSSE Bus Number: 100116) NR N N PD ME W F
1243 3/31/2022 G 3/31/2022 Solar PV SUN 300 300 300 Aroostook ME 11/1/2026 10/1/2026 345kV line between Orrington(PSSE Bus Number: 100002) -Albion Rd (PSSE Bus Number: 100092) near the town of Pittsfield NR N N PD ME Third Maine Resource Integration Study A F
1242 7/3/2024 G 3/28/2022 Lewiston CMP Cluster 5 OT SUN BAT 54.6566 54.6566 54.6566 Oxford/Androscoggin ME 6/30/2028 6/30/2028 CMP Lewiston NA Y Y CMP PD ME A N
1241 3/14/2023 G 3/28/2022 Sanford/Quaker Hill CMP Cluster 4 OT SUN BAT 66.402 66.402 66.402 York ME 6/30/2028 6/30/2026 CMP Sandford/Quaker Hill NA Y Y CMP PD ME A N
1240 10/27/2024 G 3/25/2022 Battery Storage OT BAT 62.84 62.84 62.84 Kent RI 12/31/2025 12/15/2025 10/23/2024 National Grid Kent County Substation - 115kV open line position between 4T3T and 3T10 breakers. CNR N N PD RI W F
1239 10/16/2024 G 3/25/2022 Solar plus Battery OT SUN BAT 129 183.6 183.6 Oxford ME 4/21/2026 4/7/2026 CMP 115kV Woodstock S/S CNR Y N PD ME A F
1238 6/8/2023 G 3/22/2022 Battery Storage OT BAT 301.26 301.26 301.26 Norfolk MA 11/23/2026 6/15/2026 Primary: West Medway 345kV station CNR N N PD SEMA A F
1237 8/31/2022 G 3/21/2022 Battery Storage CNR only OT BAT 0 205 205 Washinton RI 6/1/2026 6/1/2026 Primary - NEP L190-2, Alt NEP G185S CNR N N RI A F
1236 5/23/2022 ETU 3/15/2022 1200 MW non-controllable ETU - N to S flow only NA N/A 1200 Aroostook/Somerset ME 6/1/2028 6/1/2028 Transmission Line connects between the new Aroostook station and Pittsfield Station. Pittsfield 345 kV substation is located between the existing Orrington - Albion Road line in Somerset County at lat/long 44.795/-69.386. The Aroostook station will be located in Aroostook county at lat/long 45.7634/-68.0278. N/A N N PD ME Third Maine Resource Integration Study A F
1235 8/12/2022 G 3/14/2022 Battery Storage OT BAT 20 20 20 Bristol MA 12/31/2024 10/28/2024 8/11/2022 Eversource's Cross Road 13.2kV Circuit 532 CNR N N PD SEMA W F
1234 8/12/2022 G 3/14/2022 Battery Storage OT BAT 20 20 20 Bristol MA 12/31/2024 10/28/2024 8/11/2022 Eversource's Cross Road 13.2kV Circuit 533 CNR N N PD SEMA W F
1233 8/12/2022 G 3/14/2022 Battery Storage OT BAT 20 20 20 Bristol MA 12/31/2024 10/28/2024 8/11/2022 Eversource's Cross Road 13.2kV Circuit 541 CNR N N PD SEMA W F
1232 10/27/2024 G 3/4/2022 Battery Storage OT BAT 27.44 27.44 27.44 Providence RI 12/31/2025 12/15/2025 10/23/2024 NEC 115/34.5kV Iron Mine Hill Substation #1203 spare buss position #2 CNR N N PD RI W F
1231 4/22/2022 G 3/4/2022 Battery Storage CNR Only OT BAT 0 204.64 204.64 Windham CT 5/1/2025 2/15/2025 4/22/2022 Eversource Killingly 345kV Substation CNR N N CT W F
1230 3/4/2022 ETU 3/3/2022 1200 MW non-controllable ETU - N to S flow only NA N/A 1200 Somerset/Aroostook ME 12/1/2027 10/1/2027 The Point of Interconnection will be a new station about 30 miles from Orrington that taps the existing segment 3023 between Orrington and Albion Rd. Hammond, ME to Pittsfield ME (see map) N/A N N PD ME Third Maine Resource Integration Study A F
1229 9/14/2022 G 2/22/2022 Solar plus Battery OT SUN BAT 3 3 3 Hampshire MA 12/31/2022 9/30/2022 9/14/2022 Eversource 13.8kV Circuit 18G4 CNR N N WMA W F
1228 9/4/2024 ETU 2/16/2022 1200 MW non-controllable ETU - N to S flow only NA N/A 1200 Hancock/Aroostook ME 12/9/2026 10/8/2026 9/4/2024 New substation on Line 388 N/A N N PD ME W F
1227 9/4/2024 ETU 2/16/2022 1200 MW non-controllable ETU - N to S flow only NA N/A 1200 Somerset/Aroostook ME 12/9/2026 10/8/2026 9/4/2024 New substation on Line 3023 near the Detroit Substation near Pittsfield, Maine. N/A N N PD ME W F
1226 11/16/2023 G 3/4/2022 Solar PV SUN 4.99 4.99 4.99 Sullivan NH 5/15/2025 5/1/2025 46 kV subtransmission line between GMP Maple Avenue B-42 and the 4402 breaker at the GMP/NGRID demarc considered at Bellows Falls NR Y N ISO-NE NH A F
1225 1/2/2024 G 2/3/2022 Offshore Wind WT WND 1200 1200 1200 NA MA 1/31/2029 9/30/2028 Bourne 345 kV Switching Station CNR N N PD SEMA A F
1224 9/14/2022 G 1/25/2022 Solar plus Battery OT SUN BAT 1 1 1 Worcester MA 4/29/2022 4/29/2022 9/14/2022 National Grid MA 13.8 kV, Whitins Pond 320W5 CNR N N CMA W F
1223 3/15/2022 G 1/18/2022 Battery Storage OT BAT 9.99 9.99 9.992 Worcester MA 4/29/2022 3/31/2022 3/15/2022 ZP Battery DevCo, LLC, 13.2kV, National Grid Feeder #413L3 CNR N N CMA W F
1222 3/30/2023 G 1/14/2022 Group @ Berkshire 18C OT SUN BAT 7.65 7.65 7.65 Hampden MA 11/30/2023 9/30/2023 Eversource Berkshire 18C NA N N PD WMA A N
1221 3/30/2023 G 1/14/2022 Cumberland 22B - WMA ASO OT SUN BAT 4.99 4.99 4.99 Hampden MA 11/30/2023 9/30/2023 Eversource Cumberland 22B NA N N PD WMA A N
1220 3/30/2023 G 1/14/2022 Group @ Blandford 19J - WMA ASO OT SUN BAT 6.99 6.99 6.99 Berkshire MA 11/30/2023 9/30/2023 Eversource Blandford 19J NA N N PD WMA A N
1219 3/30/2023 G 1/14/2022 Group @ French King - WMA ASO OT SUN BAT 8.9 8.9 8.9 Franklin/Hampshire MA 11/30/2023 9/30/2023 Eversource French King NA N N PD WMA A N
1218 5/31/2023 G 1/14/2022 Group @ Montigue - WMA ASO OT SUN BAT 9.86 9.86 9.86 Franklin MA 11/30/2023 9/30/2023 Eversource Montigue NA Y Y NU PD WMA A N
1217 3/30/2023 G 1/14/2022 Oswald - WMA ASO OT SUN BAT 2.49 2.49 2.49 Franklin MA 11/30/2023 9/30/2023 Eversource Oswald NA N N PD WMA A N
1216 3/30/2023 G 1/14/2022 Group @ Podick - WMA ASO OT SUN BAT 7.7 7.7 7.7 Hampden/Franklin MA 11/30/2023 9/30/2023 Eversource Podick NA N N PD WMA A N
1215 3/30/2023 G 1/14/2022 Group @ Maynard 416 - EMA ASO OT SUN BAT 8.476 8.476 8.476 Middlesex MA 11/30/2023 9/30/2023 Eversource Maynard 416 NA Y N NU PD BOST A N
1214 3/30/2023 G 1/14/2022 Group @ Medway 65 - EMA ASO OT SUN BAT 17.497 17.497 17.497 Middlesex/Norfolk MA 11/30/2023 9/30/2023 Eversource Medway 65 NA Y N NU PD BOST A N
1213 3/30/2023 G 1/14/2022 Holliston 130 - EMA ASO OT BAT 4.99 4.99 4.99 Middlesex MA 11/30/2023 9/30/2023 Eversource Holliston 130 NA Y N NU PD BOST A N
1212 1/26/2024 G 1/14/2022 Hopkinton 126 - EMA ASO OT SUN BAT 3.9 3.9 3.9 Middlesex MA 11/30/2023 9/30/2023 1/25/2024 Eversource Hopkinton 126 NA Y N NU PD BOST W N
1211 12/13/2022 G 1/10/2022 Wind WT WND 500 527 527 Aroostook ME 11/27/2026 9/3/2026 Orrington-Albion Rd 345kV line (3023) near the town of Pittsfield (approximately 19 miles from Albion Rd Substation) CNR N N PD ME Third Maine Resource Integration Study A F
1210 12/13/2022 G 1/7/2022 Wind WT WND 500 572 572 Aroostook ME 11/28/2025 9/3/2025 Orrington-Albion Rd 345kV line (3023) near the town of Pittsfield (approximately 19 miles from Albion Rd Substation) CNR N N PD ME Third Maine Resource Integration Study A F
1209 3/8/2022 G 12/30/2021 Battery Storage OT BAT 170 170 170 Providence RI 12/31/2024 12/1/2024 3/8/2022 RI_NGRID Hartford 115kV substation/ Bus ID: 117351 NR N N PD RI W F
1208 3/8/2022 G 12/30/2021 Battery Storage OT BAT 160 160 160 New Haven CT 12/31/2024 12/1/2024 3/8/2022 CT_UI June Street 115KV substation/ Bus ID: 123416 NR N N PD CT W F
1207 1/28/2022 G 12/30/2021 Battery Storage OT BAT 200 200 200 Barnstable MA 12/31/2024 12/1/2024 1/28/2022 MA_NSTAR_CE Canal 115KV substation NR N N PD SEMA W F
1206 3/8/2022 G 12/30/2021 Battery Storage OT BAT 200 200 200 Berkshire MA 12/31/2024 12/1/2024 3/8/2022 MA_NGRID Adams 115kV substation Bus ID: 113005 NR N N PD WMA W F
1205 10/31/2022 G 12/30/2021 Hamilton Sunstrand OT SUN 2 2 2 Hartford CT 4/1/2023 4/1/2023 Windsor Locks 14K NA Y Y NU CT A N
1204 3/9/2023 G 12/28/2021 LSE Scorpuis OT SUN 1.82 1.82 1.82 Putnam CT 12/31/2023 10/31/2023 Tracy 14M NA Y Y NU CT A N
1203 1/4/2022 G 12/28/2021 CTEC Solar 186 Foster St, South Windsor OT SUN 1.875 1.875 1.875 Hartford CT 7/1/2023 7/1/2023 Barbour Hill 23J NA N N CT A N
1202 1/3/2022 G 12/28/2021 Community Power Group, 24 Middle Road, Ellington, CT OT SUN 4 4 4 Tolland CT 7/1/2023 7/1/2023 Rockville 14W NA N N CT A N
1201 1/3/2022 G 12/28/2021 Verogy - Tripp RD OT SUN 2 2 2 Hartford CT 7/1/2023 7/1/2023 Rockville 14W NA N N CT A N
1200 1/3/2022 G 12/28/2021 Verogy - Thrall Rd, East Windsor OT SUN 4 4 4 Hartford CT 7/1/2023 7/1/2023 Rockville 14W or Barbour Hill 23J NA N N CT A N
1199 1/3/2022 G 12/28/2021 USS Vineyard Solar, Somers Rd PV SUN 4 4 4 Tolland CT 9/30/2022 9/30/2022 Scitico 27H NA N N PD CT A N
1198 2/23/2023 G 12/30/2021 Storage OT BAT 241.8 241.8 241.8 Bristol MA 5/12/2028 2/14/2028 Looping the D-182S line adjacent to National Grid’s 115 kV Reynold’s Ave Substation CNR N N RI A F
1197 3/30/2023 G 12/20/2021 Battery Storage OT BAT 150 150 150 Bristol MA 12/31/2027 10/28/2027 Eversource 115kV Cross Road Line 111 CNR N N PD SEMA A F
1196 3/8/2022 G 12/14/2021 Energy Storage OT BAT 99.9 99.9 99.9 Hampden MA 10/1/2024 8/1/2024 3/8/2022 National Grid Hampden Substation, 115 kV. Secondary is 115 kV Line 1976. CNR N N PD WMA W F
1195 9/30/2024 TS 11/23/2021 Regional Network Service NA N/A 6.3 6.3 6.3 Middlesex MA 11/15/2024 10/7/2024 NSTAR 115 kV Line 875-539 N/A Y N ISO-NE BOST A F
1194 12/6/2021 G 11/9/2021 Bear Swamp Pumping Load Increase PS WAT 0 333 333 Berkshire MA 11/9/2021 11/9/2021 The existing POI of the Bear Swamp generating station NR N N WMA C F
1193 8/26/2024 G 11/9/2021 Battery Storage OT BAT 325 325 325 Windham CT 1/1/2026 1/8/2025 CL&P 345 kV 3271 Line CNR Y N PD CT A F
1192 5/29/2024 G 11/4/2021 Solar PV SUN 101.128 101.128 101.128 Hartford CT 10/15/2027 9/24/2027 N. Bloomfield to Agawam 345kV Line. POI is approximately 3.6 mi north of N. Bloomfield (345kV) and 11.5 mi south of Agawam (345kV). CNR Y Y ISO-NE CT A F
1191 11/9/2021 G 11/3/2021 Increase to Pumping load PS WAT 0 333 333 Berkshire MA 11/3/2021 11/3/2021 11/9/2021 The current Bear Swamp interconnection points NR N N WMA W F
1190 8/12/2024 G 10/28/2021 Solar Knox PV SUN 33.5 33.5 33.5 Knox ME 3/31/2027 2/28/2027 CMP 115kV Line 80 CNR Y Y ISO-NE PD ME A F
1189 3/30/2023 G 10/27/2021 Wendall Depot Substation - NG WMA Group 3 OT SUN BAT 27.981 27.981 27.981 Franklin MA 12/31/2027 12/31/2027 NG Wendall Depot Substation NA N N PD WMA A N
1188 3/30/2023 G 10/27/2021 Ware Substation - NG WMA Group 3 OT SUN BAT 11 11 11 Hampshire MA 12/31/2027 12/31/2027 NG Ware Substation NA N N PD WMA A N
1187 3/30/2023 G 10/27/2021 W. Charlton Substation - NG WMA Group 3 OT BAT 19.984 19.984 19.984 Worcester MA 12/31/2027 12/31/2027 NG W. Charlton Substation NA N N PD WMA A N
1186 3/30/2023 G 10/27/2021 Treasure Valley Substation - NG WMA Group 3 OT BAT 9.992 9.992 9.992 Worcester MA 12/31/2027 12/31/2027 NG treasure Valley Substation NA N N PD WMA A N
1185 3/30/2023 G 10/27/2021 Stafford St. Substation - NG WMA Group 3 OT SUN BAT 22.448 22.448 22.448 Worcester MA 12/31/2027 12/31/2027 NG Stafford St. Substation NA N N PD WMA A N
1184 3/30/2023 G 10/27/2021 Snow St. Substation - NG WMA Group 3 OT SUN BAT 27.836 27.836 27.836 Worcester MA 12/31/2027 12/31/2027 NG Snow St. Substation NA N N PD WMA A N
1183 3/30/2023 G 10/27/2021 Royalston Substation - NG WMA Group 3 OT SUN BAT 5 5 5 Worcester MA 12/31/2027 12/31/2027 NG Royalston Substation NA N N PD WMA A N
1182 3/30/2023 G 10/27/2021 Pratts Junc. Substation - NG WMA Group 3 OT BAT 14.94 14.94 14.94 Worcester MA 12/31/2027 12/31/2027 NG Pratts Junc. Substation NA N N PD WMA A N
1181 3/30/2023 G 10/27/2021 N. Oxford Substation - NG WMA Group 3 OT SUN BAT 20.396 20.396 20.396 Worcester MA 12/31/2027 12/31/2027 NG N. Oxford Substation NA N N PD WMA A N
1180 3/30/2023 G 10/27/2021 Millbury Substation - NG WMA Group 3 OT SUN BAT 11.742 11.742 11.742 Worcester MA 12/31/2027 12/31/2027 NG Millbury Substation NA N N PD WMA A N
1179 3/30/2023 G 10/27/2021 Meadow Street 552 Substation - NG WMA Group 3 OT SUN BAT 13.799 13.799 13.799 Worcester MA 12/31/2027 12/31/2027 NG Meadow Street 552 Substation NA N N PD WMA A N
1178 3/30/2023 G 10/27/2021 Little Rest Rd Substation - NG WMA Group 3 OT SUN BAT 5.8 5.8 5.8 Worcester MA 12/31/2027 12/31/2027 NG Little Rest Rd Substation NA N N PD WMA A N
1177 3/30/2023 G 10/27/2021 Lashaway Substation - NG WMA Group 3 OT BAT 14.94 14.94 14.94 Worcester MA 12/31/2027 12/31/2027 NG Lashaway Substation NA N N PD WMA A N
1176 3/30/2023 G 10/27/2021 E. Winchendon Substation - NG WMA Group 3 OT SUN BAT 34.975 34.975 34.975 Worcester MA 12/31/2026 12/31/2026 NG E. Winchendon Substation NA N N PD WMA A N
1175 3/30/2023 G 10/27/2021 E. Westminster Substation - NG WMA Group 3 OT SUN BAT 4.99 4.99 4.99 Worcester MA 12/31/2026 12/31/2026 NG E. Westminster Substation NA N N PD WMA A N
1174 3/30/2023 G 10/27/2021 Crystal Lake Substation - NG WMA Group 3 OT BAT 7.998 7.998 7.998 Worcester MA 12/31/2026 12/31/2026 NG Crystal Lake Substation NA N N PD WMA A N
1173 3/30/2023 G 10/27/2021 Barre Substation - NG WMA Group 3 OT SUN BAT 12.398 12.398 12.398 Worcester MA 12/31/2027 12/31/2027 NG Barre Substation NA N N PD WMA A N
1172 10/2/2024 G 10/27/2021 Solar plus Battery OT SUN BAT 53.07 53.07 53.07 Merrimack NH 7/31/2025 5/31/2025 10/2/2024 Eversource 115kV F139 line CNR Y N NH W F
1171 10/30/2024 G 10/25/2021 Twin Energy Wind WT WND 18.3 20 20 Oxford ME 10/17/2025 9/18/2025 Roxbury Substation CNR Y Y ISO-NE PD ME A F
1170 10/11/2023 G 10/22/2021 Battery Storage OT BAT 100 100 100 Franklin MA 1/11/2023 12/14/2022 10/11/2023 National Grid's PTF (115kV Y-177 line), located at 42.730250 degrees north latitude, -72.931858 degrees west longitude. CNR N N PD WMA W F
1169 10/11/2023 G 10/22/2021 Roxbury Solar PV SUN 1.999 1.999 1.999 Oxford ME 2/7/2025 1/10/2025 CMP 12.47 kV distribution circuit 447D1 out of CMP Rumford Substation NR Y Y ISO-NE ME A F
1168 10/31/2022 G 10/4/2021 Fuel Cell FC NG 8.7 8.7 8.7 Hartford CT 10/15/2023 10/1/2023 Eversource Northwest Hartford 2N substation circuit 2N17 NA Y Y NU PD CT A N
1167 1/31/2023 G 10/4/2021 Solar PV SUN 4 4 4 Windham CT 1/31/2023 12/31/2022 1/30/2023 Eversource Tracy 14M substation circuit 14M9 NA Y Y NU PD CT W N
1166 1/31/2023 G 10/4/2021 Battery Storage OT BAT 20 20 20 New Haven CT 9/1/2024 8/1/2024 Eversource Oxford 26N Substation NA N N PD CT A N
1165 3/6/2024 G 10/22/2021 Solar PV SUN 1.999 Hancock ME 7/15/2023 7/15/2023 34.5kV Line on Bar Harbor Road. The 34.5 kV line from Ellsworth to Trenton is not explicitly modeled in the power flow. We added a model for this line and then tapped it at tap 30% of the total line length from Trenton for the POI. CNR Y Y ISO-NE BHE A F
1164 12/7/2022 G 9/23/2021 Solar PV SUN 20 20 20 Coos NH 11/1/2023 11/1/2023 12/7/2022 Eversource 34.5 kV Line 384, Pole 4 CNR N N PD NH W F
1163 12/13/2024 G 9/22/2021 Battery Storage OT BAT 205 201.43 201.43 Washington RI 6/1/2026 6/1/2026 RIE L190-2 (0.615 miles from Davisville and 1.935 miles from Old Baptist substations). NR N N RI A F
1162 6/1/2023 G 9/21/2021 Solar with Battery OT SUN BAT 87 95.6 95.6 Windham CT 12/31/2023 11/30/2023 6/1/2023 POI will be the three breaker ring bus at the 1607 Line. Approximate Coordinates 41.7119, -71.9379. CNR N N PD CT W F
1161 9/13/2022 G 9/8/2021 Solar plus Battery OT SUN BAT 3.6 3.6 3.6 Berkshire MA 7/1/2022 6/15/2022 9/12/2022 Eversource 22.8Kv feeder 15E1 Name of the substation = Partridge 15E substation CNR Y N ISO-NE PD WMA W F
1160 9/13/2022 G 8/31/2021 Solar plus Battery OT SUN BAT 4.536 4.536 4.536 Berkshire MA 7/1/2022 6/15/2022 9/12/2022 Eversource 22.8Kv feeder 15E1 Name of the substation = Partridge 15E substation CNR Y N ISO-NE PD WMA W F
1159 8/18/2023 G 8/27/2021 Battery Storage OT BAT 276 276 276 Suffolk MA 12/30/2023 12/5/2023 8/18/2023 Primary POI - Mystic 115 kV Station, Alternative POI - Mystic 345 kV Station NR N N PD BOST W F
1158 6/21/2023 ETU 8/19/2021 1200 MW DC Transmission Line NA N/A 1200 MA 5/31/2028 2/29/2028 6/21/2023 Mystic 345 kV Substation N/A N N BOST W F
1157 12/19/2022 ETU 8/19/2021 1200 MW DC Transmission Line NA N/A 1200 MA 5/31/2028 2/29/2028 12/19/2022 Mystic 345 kV Substation N/A N N BOST W F
1156 9/21/2021 G 8/16/2021 Solar PV SUN 101.164 101.164 101.164 Hartford CT 10/15/2024 9/15/2024 9/21/2021 N. Bloomfield to NE Simsbury 115kV Line. POI is 200 feet east of the NE Simsbury Substation(115kV) and 2.25 miles west of N.Bloomfield(115kV). CNR N N PD CT W F
1155 9/21/2021 G 8/16/2021 Solar PV SUN 101.09 101.09 101.09 Hartford CT 10/15/2024 9/15/2024 9/21/2021 N. Bloomfield to Agawam 345kV Line. POI is approximately 3.6 mi north of N. Bloomfield (345kV) and 11.5 mi south of Agawam (345kV). CNR N N PD CT W F
1154 10/2/2024 G 8/13/2021 Offshore wind Inc (QP700) WT WND 18 856.2 856.2 NA MA 10/30/2026 3/14/2026 Eversource 345kV West Barnstable (921) CNR Y Y ISO-NE PD SEMA CSIS A F
1153 9/28/2022 G 8/11/2021 Offshore wind WT WND 440 440 440 NA MA 11/1/2026 9/1/2026 9/28/2022 Eversource 115kV Acushnet, lines 112/114, Alternative Eversource Pine Street 115kV CNR N N PD SEMA W F
1152 9/8/2022 G 8/4/2021 Solar + Battery Storage OT SUN BAT 9.998 9.998 9.998 Hampshire MA 9/1/2022 9/1/2022 9/8/2022 National Grid 13.8 kV 909W4 CNR N N WMA W F
1151 6/26/2023 G 8/4/2021 13665 Felt Road Solar OT SUN BAT 1.968 Oxford ME 11/15/2024 11/15/2024 CMP 34.5 kV Feeder 452K1, Woodstock Substation CNR Y Y ISO-NE PD ME A F
1150 5/22/2023 G 7/29/2021 Offshore Wind WT WND 11.55 11.55 11.55 NA ME 9/1/2023 8/1/2023 5/22/2023 CMP Boothbay Harbor 34.5kV substation CNR N N ME W F
1149 11/12/2024 G 8/6/2021 Battery addition OT WAT BAT 0 6.7 6.7 Franklin MA 8/17/2025 8/13/2025 National Grid's PTF (E-5B, F-6 West PTF transmission lines) CNR Y N WMA A F
1148 11/19/2024 G 7/13/2021 Lite Brite Battery Storage OT BAT 305.624 305.624 305.624 Suffolk MA 5/26/2028 4/30/2028 Electric Avenue 115 kV substation (bus number 110926), Zone MA_NST CNR Y N ISO-NE BOST A F
1147 7/12/2021 G 7/8/2021 Solar PV SUN 20 20 20 Rensselaer NY 12/30/2022 11/30/2022 National Grid’s North Troy – Hoosick 115kV Line #5 NA N N PD N/A A N
1146 11/12/2024 G 7/7/2021 Swain Solar PV SUN 40.355 40.91 40.91 Oxford ME 7/9/2027 6/25/2027 10/30/2024 CMP 115kV Line 270 CNR Y Y ISO-NE PD ME W F
1145 8/31/2023 G 7/7/2021 Solar PV SUN 20.7 20.7 20.7 Hancock ME 7/8/2024 6/24/2024 Versant 115 kV Trenton substation bus; Alternate POI - Versant 115kV Line 57 CNR Y Y ISO-NE PD BHE A F
1144 10/27/2021 G 6/17/2021 Solar OT SUN BAT 1 1 1 Dukes MA 11/1/2022 10/1/2022 10/26/2021 Eversource 23 kV Line 4-99-99 CNR N N SEMA W F
1143 4/11/2024 G 6/15/2021 Battery Storage OT BAT 508.248 508.248 508.248 Middlesex MA 5/31/2028 12/1/2027 Mystic 345 kV between breaker 101, 106 and 107 CNR Y Y ISO-NE NA BOST A F
1142 12/19/2022 ETU 6/7/2021 1200 MW DC Bidirectional Transmission line NA N/A Suffolk/Barnstable MA 9/30/2027 7/31/2027 12/19/2022 K Street 345 kV Substation associated terminals Boston, MA Bourne 345 kV Substation associated terminals Sandwich, MA N/A N N NA BOST W F
1141 9/3/2021 ETU 6/7/2021 1200 MW DC Bidirectional Transmission line NA N/A Suffolk/Barnstable MA 9/30/2027 7/31/2027 9/2/2021 Mystic 345 kV Substation associated terminals Everett, MA Bourne 345 kV Substation associated terminals Sandwich, MA N N NA BOST W F
1140 1/11/2022 TS 6/3/2021 Regional Network Service Request NA N/A 395 395 316 Hampden MA 10/1/2023 10/1/2023 1/11/2022 Eversource 115 kV Lines 1293 & 1302 N/A N N NA WMA W F
1139 8/12/2024 G 6/4/2021 Turner Meadow Solar PV SUN 20 20 20 Androscoggin ME 11/20/2026 11/15/2026 CMP 34.5kV Line 50 CNR Y Y ISO-NE NA ME A F
1138 10/8/2024 G 6/3/2021 Husky Solar PV SUN 50.159 50.159 50.159 Windham CT 5/10/2028 5/1/2028 The POI will be located about 6.9 miles from the 1607/1505 line ROW (Exeter Tap) and about 1.1 miles from the Exeter Sub 54N along the 115 kV underground line to the Exeter Sub 54N. CNR Y Y ISO-NE PD CT A F
1137 5/26/2021 G 5/25/2021 Nasonville Substation – NG RI-Nasonville-21-Comp-1 Study PV SUN 9.5 9.5 9.5 Providence RI 3/15/2023 3/15/2023 NG feeder 127W43, Nasonville Substation NA N N PD RI A N
1136 6/25/2024 G 5/20/2021 Solar PV SUN 20 20 20 Strafford NH 5/15/2026 4/15/2026 43°23'7.50"N, 71° 1'23.45"W, Direct Tap, Circuit #3174 34.5 kV CNR Y N ISO-NE NH A F
1135 2/2/2023 G 5/13/2021 Solar + Battery Storage OT SUN BAT 113.01 113.01 113.01 Coos NH 5/15/2025 2/15/2025 2/2/2023 Eversource W179-1 115 kV Line between Berlin and Pontook Hydro Substations, 11.5 miles from the Berlin Substation CNR N N PD NH W F
1134 3/9/2023 G 5/6/2021 Noresco Navy IC NG 10.8 10.8 10.8 New London CT 4/15/2023 3/1/2023 GU 323 NA Y N CT A N
1133 9/10/2024 G 4/27/2021 Stored Solar Fitchburg CNR Only ST WDS 0 17 17 Worcester MA 8/8/2024 8/8/2024 Flagg Pond 69kv CNR N N CMA C F
1132 9/14/2022 G 4/23/2021 Solar + Battery Storage OT SUN BAT 3 3 3 Hampshire MA 12/28/2021 12/28/2021 9/14/2022 13.2 Kv, Circuit #527L1, POI Pole# 52/42-2-3-1 CNR N N WMA W F
1131 9/21/2022 G 4/23/2021 Solar + Battery Storage OT SUN BAT 4.95 9.9 9.9 Barnstable MA 12/31/2021 12/31/2021 9/20/2022 Falmouth Station #933 Line #98 Pole# 9105/16 CNR Y N ISO-NE SEMA W F
1130 9/14/2022 G 4/23/2021 Solar + Battery Storage OT SUN BAT 2 2 2 Franklin MA 4/30/2022 4/30/2022 9/14/2022 Eversource 13.8kV 22B3 feeder CNR N N WMA W F
1129 10/4/2022 G 4/22/2021 Solar + Battery Storage OT SUN BAT 2.456 2.456 2.456 Bristol MA 12/31/2021 10/31/2021 10/4/2022 The primary connection of the proposed project to Eversource Energy is located at the Wing Lane substation #624 Transformer #1 Line #240. The site is located approximately 0.26 circuit miles from Substation 624 near PSS/E node 111293(Wing Lane 13.2 KV) CNR N N SEMA W F
1128 9/13/2022 G 4/21/2021 Solar + Battery Storage OT SUN BAT 4.536 4.536 4.536 Berkshire MA 7/15/2022 7/8/2022 9/12/2022 Eversource 22.8Kv feeder 15E2 Name of substation = Partridge 15E substation CNR N N PD WMA W F
1127 9/16/2022 G 4/21/2021 Solar + Battery Storage OT SUN BAT 0.999 0.999 0.999 Barnstable MA 2/28/2022 2/17/2022 9/16/2022 Eversource East 22.8kV CKT #4-77-450 (Pole# 429/5) NR N N SEMA W F
1126 9/16/2022 G 4/21/2021 Solar + Battery Storage OT SUN BAT 4 4 4 Barnstable MA 2/28/2022 2/17/2022 9/16/2022 Eversource West 22.8kV CKT #4-77-450 (POLE#429/8) CNR N N SEMA W F
1125 9/28/2023 G 4/21/2021 Solar PV SUN 72 72 72 Somerset ME 1/31/2024 12/1/2023 9/28/2023 44°36'30.65"N 69°38'23.26"W. CMP Line 241, new substation on 115kV line between Heywood Road Substation and County Road Substation. CNR N N PD ME W F
1124 6/26/2023 G 4/21/2021 Battery Storage OT BAT 107.5 107.5 107.5 Hampden MA 1/1/2025 10/1/2024 6/26/2023 Eversource 345kV Ludlow substation via the 115kV Stony Brook Substation CNR N N WMA W F
1123 8/14/2024 G 4/21/2021 Naugatuck Avenue Battery Storage CNR Only (see QP1089) OT BAT 0 205.32 205.32 New Haven CT 12/1/2026 10/15/2026 devon 115kV substation CNR N N PD SWCT A F
1122 6/16/2021 G 4/19/2021 Battery Storage OT BAT 20 20 20 Addison VT 12/31/2022 8/31/2022 6/16/2021 VELCO Middlebury Substation @ 46kV bus CNR N N VT W F
1121 10/19/2022 G 4/16/2021 Offshore wind WT WND 1200 1200 1200 NA MA 5/31/2033 12/1/2032 Brayton Point 345 kV CNR N N PD SEMA A F
1120 4/22/2022 G 4/14/2021 Battery Storage OT BAT 204.64 204.64 204.64 Windham CT 5/1/2025 2/15/2025 4/22/2022 Eversource Killingly 345kV Substation NR Y N ISO-NE PD CT W F
1119 4/25/2022 G 4/14/2021 Offshore wind WT WND 1320 1320 1320 NA MA 9/1/2027 3/1/2027 4/25/2022 Primary National Grid Brayton Point 345kV, Alt Kent County 345 kV CNR N N PD SEMA W F
1118 2/13/2024 G 4/15/2021 Offshore wind Increase (QP909) WT WND 386 1200 1200 NA MA 9/30/2027 3/31/2027 2/13/2024 National Grid 115kV Bell Rock, CNR N N PD SEMA W F
1117 2/14/2024 G 4/15/2021 Streamfield OT BAT 202.4 202.4 202.4 Hampden MA 5/31/2027 4/15/2027 The proposed POI is Buck Pond 115 kV substation, the alternative POI is to build a new substation next to Buck pond 115 kV in the north side by breaking Line 1657 CNR Y Y ISO-NE WMA A F
1116 7/17/2024 G 4/13/2021 SouthCoast Wind 1 WT WND 1200 1200 1200 NA MA 12/31/2031 5/1/2030 Brayton Point making use of QP 837 to connect CNR Y Y ISO-NE PD RI A F
1115 9/15/2023 G 4/8/2021 Hecate Energy Eastern Ave Energy Center OT BAT 250 250 250 Suffolk MA 11/9/2026 8/14/2026 Sta 488 Chelsea 115 kV substation CNR Y Y ISO-NE PD BOST A F
1114 4/21/2021 G 4/1/2021 Solar PV SUN 103 103 103 Somerset ME 1/31/2024 11/30/2023 4/20/2021 New Substation Tapping CMP 115 kV Circuit, Section 241 CNR N N PD ME W F
1113 5/5/2023 G 3/24/2021 Rumford Uprate and Battery addition OT WAT BAT 8.5 52.5 52.5 Oxford ME 5/5/2023 3/24/2023 11.5kV bus at Brookfield owned existing Rumford Falls Substation which is connected to the CMP 115kV 218 Line. CNR Y N ISO-NE PD ME C F
1112 7/3/2024 G 3/24/2021 Battery Storage OT BAT 105 105 105 Franklin MA 12/30/2029 7/9/2029 7/3/2024 115 kV B128 line; 18.88 miles from Barre B128 and 5.3 miles from French King NR Y Y ISO-NE PD WMA W F
1111 9/21/2023 G 3/22/2021 Battery Storage OT BAT 20 20 20 Norfolk MA 3/1/2026 2/15/2026 9/21/2023 Ever Source 115kV Ring Station 150 (@ spare bay in breaker and-a-half switchyard) CNR Y Y ISO-NE PD SEMA W F
1110 10/25/2023 G 3/18/2021 Norman Street Battery Storage OT BAT 204 204 204 Middlesex MA 3/18/2028 2/15/2028 Mystic 115kV CNR Y Y ISO-NE PD BOST A F
1109 10/2/2024 G 3/17/2021 Offshore Wind Inc. (Q806) WT WND 487 1314 1314 NA MA 12/31/2026 4/1/2026 Eversource 345kV West Barnstable (921) CNR Y Y ISO-NE PD SEMA CSIS A F
1108 11/15/2024 G 3/16/2021 Battery Storage OT BAT 188.96 188.96 188.96 Plymouth MA 5/14/2027 2/12/2027 11/15/2024 Eversource (NSTAR - South) 115 kV Line 116, 0.31 miles from Brook St 115 kV substation and 4.55 miles from Carver 115 kV substation CNR N N PD SEMA W F
1107 10/2/2024 G 3/16/2021 Battery Storage OT BAT 189 182.23 182.23 Plymouth MA 5/14/2027 2/14/2027 Eversource (NSTAR - South) 115 kV Wareham Line 108 CNR Y N PD SEMA A F
1106 4/23/2021 G 3/15/2021 Battery Storage OT BAT 55.05 55.05 55.05 Franklin MA 5/15/2025 2/15/2025 4/22/2021 Eversource 115 kv Ashfield substation CNR N N WMA W F
1105 10/21/2021 G 3/15/2021 Battery Storage OT BAT 104.5 104.5 104.5 Worcester MA 5/15/2025 2/15/2025 10/20/2021 National Grid 115 kV Paxton Line A127-4 CNR N N CMA W F
1104 4/20/2023 G 3/11/2021 Bonny Eagle Energy Storage - Uprate OT WAT BAT 8 25.5 25.5 York ME 4/20/2023 3/13/2023 The battery will connect to Brookfield owned 34.5kV bus inside the Bonny Eagle Power station. The Bonny Eagle Power Station 34.5kV bus ties in to the CMP owned Bonny Eagle substation. CNR Y Y ISO-NE PD ME C F
1103 1/2/2024 G 3/10/2021 Berlin Energy Uprate and Battery Addition OT WAT BAT 15 44.2 44.2 Coos NH 12/19/2023 9/25/2023 22kV bus at Brookfield owned Goebel St Substation connected to the Eversource Berlin 115kV substation. CNR Y Y ISO-NE PD NH C F
1102 11/26/2021 G 3/1/2021 Battery Storage OT BAT 200 200 200 Kent RI 3/1/2023 3/1/2023 11/26/2021 NEC 115 kV G-185S-2 CNR N N PD RI W F
1101 10/19/2022 ETU 2/25/2021 Objective ETU - upgrade alternative NA N/A NA NH 9/14/2025 9/14/2025 N/A N/A Y Y ISO-NE NH A F
1100 2/26/2024 G 2/19/2021 Solar PV SUN 164.56 164.56 164.56 Somerset ME 3/31/2028 1/29/2028 The proposed POI is on Central Maine Power 115 kV line Section 82 (Athens – Hartland), approximately 7.5 circuit miles to Athens Substation and approximately 4.3 circuit miles to Hartland station. Approximate POI coordinates: 44.8759° N, 69.5423° W CNR Y N ISO-NE PD ME A F
1099 12/15/2022 G 2/19/2021 Solar PV SUN 31.4 31.4 31.4 Knox ME 12/31/2024 12/15/2024 12/15/2022 Central Maine Power 34.5 kV Line Section 51A (S51A Tap – Highland) @ 44°07'59.3"N, 69°11'43.5"W CNR Y N ISO-NE PD ME W F
1098 4/1/2024 G 2/19/2021 Solar PV SUN 51.4 51.4 51.4 Hancock ME 12/31/2024 12/15/2024 4/1/2024 34.5 kV bus at Versant Power Trenton substation at 44°26'19.81"N, 68°22'29.11"W CNR Y Y ISO-NE PD BHE W F
1097 8/8/2024 G 2/15/2021 Green Apple Solar PV SUN 178.59 178.59 178.59 Androscoggin ME 11/1/2027 5/15/2027 44.172365, -70.104225 CMP 115kv Line 212 CNR Y Y ISO-NE PD ME A F
1096 3/14/2023 G 2/4/2021 CMP Winslow 115 kV SS - Winslow-Lakewood Areas Study OT SUN BAT 18.978 18.978 18.978 Somerset/Kennebec ME 4/30/2024 4/30/2024 CMP Winslow 115 kV SS NA Y Y CMP PD ME A N
1095 3/14/2023 G 2/4/2021 CMP Lakewood 115 kV SS - Winslow-Lakewood Areas Study PV SUN 28.901 28.901 28.901 Somerset ME 4/30/2024 4/30/2024 CMP Lakewood 115 kV SS NA Y Y CMP PD ME A N
1094 3/14/2023 G 2/4/2021 CMP County Road 115 kV SS - Winslow-Lakewood Areas Study OT SUN BAT 17.725 17.725 17.725 Kennebec ME 4/30/2024 4/30/2024 CMP County Road 115 kV SS NA N N PD ME A N
1093 12/12/2023 ETU 2/5/2021 NB TA#1365950 HVDC OT N/A 0 0 0 Salisbury, New Brunswick NB 1/1/2030 1/1/2030 12/12/2023 Salisbury, New Brunswick N/A N N NA N/A W N
1092 1/31/2023 G 1/20/2021 Solar PV SUN 26 26 26 Hartford CT 9/1/2024 8/1/2024 Eversource North Bloomfield 2A NA N N CT A N
1091 11/1/2021 G 1/14/2021 Battery Storage OT BAT 50.4 50.4 50.4 Providence RI 5/2/2022 5/2/2022 11/1/2021 The proposed POI is off the 115kV H17 transmission line owned by NEP via a spare buss position located in the Iron Mine HIll Substation owned by NEC. CNR N N PD RI W F
1090 9/16/2022 G 1/13/2021 Park City Offshore Wind CNR WT WND 0 838.2 838.2 NA MA 12/31/2029 5/1/2029 Eversource (NSTAR) 345kV West Barnstable CNR N N SEMA A F
1089 10/20/2023 G 1/8/2021 Naugatuck Avenue Battery Storage OT BAT 205.32 205.32 205.32 New Haven CT 12/1/2026 10/15/2026 Devon 115 kV open position between 4T and 5T NR Y Y ISO-NE PD SWCT A F
1088 3/9/2023 G 12/7/2020 Solar PV SUN 27 27 27 Grafton NH 6/1/2022 5/1/2022 3/9/2023 Littleton W&L Section 30 34.5 kv line or 12.47 kv distrivution line NA N N NH W N
1087 8/12/2024 G 12/17/2020 SolarFairfield PV SUN 18.14 18.14 18.14 Somerset ME 6/30/2027 1/1/2027 New Rice Rips 34.5 kV Substation in Oakland Maine NR Y Y ISO-NE PD ME A F
1086 8/12/2024 G 11/30/2020 Warren Meadow Solar PV SUN 74.5 74.5 74.5 Knox ME 11/30/2026 9/30/2026 CMP 115kV line Section 80 CNR Y Y ISO-NE PD ME A F
1085 1/21/2021 G 11/17/2020 Solar PV SUN 100 100 100 Penobscot ME 12/30/2024 11/30/2024 1/21/2021 BHE 115kV Line 64 CNR N N PD BHE W F
1084 2/8/2021 G 11/4/2020 Battery Storage OT BAT 102 102 102 Kennebec ME 12/1/2023 9/1/2023 1/27/2021 Bowman st 115kV CNR N N PD ME W F
1083 11/30/2020 G 10/29/2020 Battery Storage OT BAT 200 204 204 Middlesex MA 12/1/2023 10/1/2023 11/30/2020 Mystic 115kV NR N N PD BOST W F
1082 5/7/2021 G 10/29/2020 Battery Storage OT BAT 204 204 204 Middlesex MA 6/1/2025 2/1/2025 5/7/2021 Mystic 115kV NR N N PD BOST W F
1081 10/21/2020 G 10/9/2020 Solar PV SUN 100 100 100 Penobscot ME 12/30/2024 11/30/2024 10/21/2020 BHE 115kV Line 97 CNR N N PD BHE W F
1080 10/18/2024 G 10/8/2020 Solar PV SUN 65 66.5 66.5 Oxford ME 10/24/2024 10/3/2024 10/18/2024 Ludden Lane 115 kV substation (Riley 115 kV line) CNR Y Y ISO-NE PD ME W F
1079 3/14/2023 G 10/2/2020 Puddledock Road 115 kV SS - Augusta Area Study PV SUN 2.5 2.5 2.5 Kennebec ME 5/23/2023 5/23/2023 CMP WINTHROP Substation, Circuit 256D3 NA Y Y CMP PD ME A N
1078 3/14/2023 G 10/2/2020 Puddledock Road 115 kV SS - Augusta Area Study PV SUN 4.95 4.95 4.95 Kennebec ME 5/16/2023 5/16/2023 CMP PUDDLEDOCK ROAD Substation, Circuit 262D1 NA Y Y CMP ME A N
1077 3/14/2023 G 10/2/2020 Puddledock Road 115 kV SS - Augusta Area Study PV SUN 4.875 4.875 4.875 Kennebec ME 1/4/2024 1/4/2024 CMP BOND BROOK Substation, Circuit 208D1 NA Y Y CMP PD ME A N
1076 3/14/2023 G 10/2/2020 Bowman Street 115 kV SS - Augusta Area Study OT SUN BAT 4.975 4.975 4.975 Kennebec ME 6/27/2023 6/27/2023 CMP WEST STREET Substation, Circuit 255D1 NA Y Y CMP PD ME A N
1075 3/14/2023 G 10/2/2020 Bowman Street 115 kV SS - Augusta Area Study PV SUN 1.75 1.75 1.75 Sagadahoc ME 9/12/2023 9/12/2023 CMP RICHMOND Substation, Circuit 240D1 NA Y Y CMP PD ME A N
1074 4/18/2023 G 10/2/2020 Bowman Street 115 kV SS - Augusta Area Study OT SUN BAT 9.475 9.475 9.475 Kennebec ME 3/28/2023 3/1/2023 CMP MANCHESTER Substation, Circuit 233D1 and 233D2 NA Y Y CMP PD ME C N
1073 3/14/2023 G 10/2/2020 Bowman Street 115 kV SS - Augusta Area Study PV SUN 3.25 3.25 3.25 Kennebec ME 6/28/2022 6/28/2022 CMP GARDINER Substation, Circuit 226D2 NA Y Y CMP ME C N
1072 3/14/2023 G 10/2/2020 Bowman Street 115 kV SS - Augusta Area Study PV SUN 1.703 1.703 1.703 Kennebec ME 6/15/2023 6/15/2023 CMP CAPITOL STREET Substation, Circuit 215D3 NA Y Y CMP PD ME A N
1071 3/14/2023 G 10/2/2020 Bowman Street 115 kV SS - Augusta Area Study OT SUN BAT 9.94 9.94 9.94 Kennebec ME 12/30/2022 9/30/2022 CMP BOWMAN STREET Substation, Circuit 263D1 NA Y Y CMP PD ME C N
1070 3/14/2023 G 10/2/2020 Augusta E. Side 115 kV SS - Augusta Area Study OT SUN BAT 4.25 4.25 4.25 Kennebec ME 12/13/2022 12/13/2022 CMP SOUTH CHINA Substation, Circuit 244D2 NA Y Y CMP PD ME C N
1069 3/14/2023 G 10/2/2020 Augusta E. Side 115 kV SS - Augusta Area Study PV SUN 4 4 4 Kennebec ME 3/25/2022 3/25/2022 CMP SIDNEY Substation, Circuit 242D1 NA Y Y CMP PD ME C N
1068 3/14/2023 G 10/2/2020 Augusta E. Side 115 kV SS - Augusta Area Study PV SUN 9.998 9.998 9.998 Kennebec ME 10/21/2024 10/21/2024 CMP CONY ROAD Substation, Circuit 216D1 and 216D2 NA Y Y CMP PD ME A N
1067 3/14/2023 G 10/2/2020 Augusta E. Side 115 kV SS - Augusta Area Study OT SUN BAT 3.75 3.75 3.75 Kennebec ME 5/3/2022 5/3/2022 CMP BLAIR ROAD Substation, Circuit 207D2 NA Y Y CMP PD ME C N
1066 3/14/2023 G 10/2/2020 Augusta E. Side 115 kV SS - Augusta Area Study PV SUN 2 2 2 Kennebec ME 3/1/2024 3/1/2024 CMP AUGUSTA K5 Substation, Circuit 200D2 NA Y Y CMP PD ME A N
1065 10/9/2020 G 9/25/2020 Solar PV SUN 100 100 100 Penobscot ME 11/30/2024 11/30/2024 10/9/2020 BHE 115kV Line 97 NR N N PD BHE W F
1064 12/1/2020 G 9/17/2020 Solar PV SUN 11.8 11.8 11.8 Washington ME 9/15/2023 8/20/2023 12/1/2020 Emera Maine 34.5 kV Line 19, connecting Scott’s Hill Substation and Pembroke Substation Latitude: 44.873 Longitude: -67.356 CNR N N PD BHE W F
1063 12/23/2021 G 9/15/2020 Syncarpha Blandford Solar plus battery storage OT SUN BAT 4.99 9.998 9.998 Berkshire MA 12/14/2021 12/9/2021 Eversource 23 kv 19J2 CNR N N WMA C F
1062 12/3/2020 G 9/10/2020 Battery Storage OT BAT 100 100 100 Fairfield CT 6/1/2023 3/1/2023 12/3/2020 Baird substation CNR N N PD SWCT W F
1061 7/19/2021 G 9/10/2020 Solar PV SUN 135 135 135 Hartford CT 10/31/2022 9/30/2022 7/19/2021 The project will connect at North East Simsbury Substation (115 kV), with an alternate POI at the North East Simsbury to North Bloomfield 115 kV line in close proximity to the N.E. Simsbury substation. NR N N PD CT W F
1060 10/26/2023 G 9/9/2020 Offshore Wind Increase WT WND 0 1200 1200 NA CT 11/30/2027 3/31/2027 Eversource (CL&P) Millstone 345 kV substation CNR Y N ISO-NE PD CT A F
1059 12/14/2022 G 9/9/2020 Offshore Wind WT WND 1200 1278.9 1278.9 NA MA 11/30/2027 3/31/2027 12/13/2022 Eversource NSTAR Pilgrim 345 kV substation CNR N N PD SEMA W F
1058 8/28/2023 G 9/9/2020 Offshore Wind WT WND 1200 1266.72 1266.72 NA CT 11/30/2027 3/31/2027 Eversource (CL&P) Millstone 345 kV substation CNR Y N ISO-NE PD CT A F
1057 4/22/2021 G 8/28/2020 Battery Storage OT BAT 500 500 500 Middlesex MA 6/1/2025 3/1/2025 4/22/2021 Mystic 345 kV NR N N PD BOST W F
1056 3/4/2021 G 8/28/2020 Battery Storage OT BAT 50 50 50 New Haven CT 6/1/2022 3/1/2022 3/3/2021 June Street substation CNR N N SWCT W F
1055 4/29/2024 G 8/26/2020 Fuel Cell FC NG 14.4 14.4 14.4 New Haven CT 3/21/2024 10/12/2023 UI 13.8kV Indian Well Substation NA Y Y UI PD SWCT C N
1054 10/8/2024 G 8/19/2020 Wood River - NG WRI DG Area Study #2 <5 MW PV SUN 9.75 9.75 9.75 Washington RI 6/30/2025 6/15/2025 10/8/2024 NG Wood River Substation, feeder 85T2 NA Y Y NGRID PD RI W N
1053 9/15/2021 G 8/19/2020 Westerly - NG WRI DG Area Study #2 <5 MW PV SUN 4.875 4.875 4.875 Washington RI 6/30/2025 6/15/2025 9/14/2021 NR Westerly substation, feeder 16F2 NA Y Y NGRID PD RI W N
1052 9/15/2021 G 8/19/2020 West Cranston - NG WRI DG Area Study #2 <5 MW PV SUN 1.56 1.56 1.56 Washington RI 4/1/2022 3/15/2022 9/14/2021 NG West Cranston substation, feeder 21F2 NA Y Y NGRID PD RI W N
1051 10/8/2024 G 8/19/2020 Tower Hill - NG WRI DG Area Study #2 <5 MW PV SUN 3.06 3.06 3.06 Washington RI 6/30/2025 6/15/2025 10/8/2024 NG Tower Hill substation, feeder 88F7 NA Y Y NGRID PD RI W N
1050 8/27/2020 G 8/19/2020 Putnam Pike - NG WRI DG Area Study #2 <5 MW PV SUN 3 3 3 Providence RI 8/31/2021 8/15/2021 NG Putnam Pike substation, feeder 38F3 NA N N PD RI A N
1049 9/15/2021 G 8/19/2020 Old Baptist Road - NG WRI DG Area Study #2 <5 MW PV SUN 4 4 4 Washington RI 4/1/2022 3/15/2022 9/14/2021 NG Old Baptisst Road substation, feeder 46F3 NA Y Y NGRID PD RI W N
1048 9/15/2021 G 8/19/2020 New London - NG WRI DG Area Study #2 <5 MW PV SUN 4.875 4.875 4.875 Kent RI 4/1/2022 3/15/2022 9/14/2021 NG New London substation, feeder 150F4 NA Y Y NGRID PD RI W N
1047 9/15/2021 G 8/19/2020 Kent County - NG WRI DG Area Study #2 <5 MW PV SUN 13.525 13.525 13.525 Kent RI 4/1/2022 3/15/2022 NG Kent County Substation, feeders 3309, 22F1 and 3311 NA Y Y NGRID PD RI A N
1046 3/3/2021 G 8/19/2020 Johnston - NG WRI DG Area Study #2 <5 MW PV SUN 4.875 4.875 4.875 Povidence RI 4/1/2022 3/15/2022 NG Johnston substation NA Y Y NGRID PD RI A N
1045 9/15/2021 G 8/19/2020 Hopkins Hill - NG WRI DG Area Study #2 <5 MW PV SUN 3.5 3.5 3.5 Kent RI 4/1/2022 3/15/2022 NG Hopkins Hill substation, feeder 63F3 NA Y Y NGRID PD RI A N
1044 3/3/2021 G 8/19/2020 Drumrock - NG WRI DG Area Study #2 <5 MW PV SUN 4.975 4.975 4.975 Kent RI 4/1/2022 3/15/2022 NG Drumrock sustation, feeder 14F4 NA Y Y NGRID PD RI A N
1043 10/8/2024 G 8/19/2020 Chase Hill - NG WRI DG Area Study #2 <5 MW PV SUN 7.325 7.325 7.325 Washington RI 6/30/2025 6/15/2025 10/8/2024 NG Chase Hillk substation NA Y Y NGRID PD RI W N
1042 10/8/2024 G 8/19/2020 Wood River - NG WRI DG Area Study #2 >5 MW PV SUN 34.375 34.375 34.375 Washington RI 6/30/2025 6/15/2025 10/8/2024 NG Wood River Substation, feeder 85T2 NA Y Y NGRID PD RI W N
1041 11/4/2024 G 8/19/2020 Kent County - NG WRI DG Area Study #2 >5 MW PV SUN 49.75 49.75 49.75 Kent RI 4/28/2025 4/14/2024 NG Kent County Substation, feeders 3309 and 3310 NA Y Y NGRID PD RI A N
1040 6/22/2022 G 8/19/2020 Farnum Pike - NG WRI DG Area Study #2 >5 MW PV SUN 8 8 8 Providence RI 12/29/2022 12/15/2022 NG Drumrock sustation, feeder 23F3 NA Y Y NGRID PD RI A N
1039 7/23/2024 G 8/19/2020 Warren Substation – NG RI-Warren-20-Comp-1 Study PV SUN 6.93 6.93 6.93 Kent RI 8/2/2024 6/28/2024 NG feeder 5F2, Warren Substation NA Y Y NGRID PD RI A N
1038 3/6/2024 G 8/7/2020 Solar PV SUN 76.25 76.25 76.25 Merrimack NH 10/31/2025 10/5/2025 3-breaker ring bus tap of the existing Comerford - Dunbarton Tap 230 kV line. This line is owned by National Grid and has the designation of Line B202 N. Latitude/ Longitude : 43.268, -71.66 CNR Y Y ISO-NE NH A F
1037 4/22/2021 G 8/4/2020 Battery Storage OT BAT 700 700 700 Suffolk MA 6/1/2024 3/1/2024 4/22/2021 The Mystic 345 kV substation. NR N N PD BOST W F
1036 8/28/2020 G 7/20/2020 Solar plus battery storage OT SUN BAT 85 85 85 Carroll NH 10/31/2023 10/2/2023 8/27/2020 115 kV bus at Eversource's White Lake Substation in Tamworth, New Hampshire (43.848851, -71.2444465) CNR N N PD NH W F
1035 9/23/2020 G 6/29/2020 Solar PV SUN 60 60 60 Coos NH 12/30/2023 11/30/2023 9/22/2020 Eversource Berlin to Lost Nation 115 kV Line W179; 44.564565, -71.19104; 9.69 miles from Berlin substation, 18.27 miles from Lost Nation substation CNR N N PD NH W F
1034 5/3/2021 G 6/29/2020 Solar PV SUN 60 60 60 Coos NH 12/30/2023 11/30/2023 4/30/2021 Eversource Whitefield to Berlin 115 kV S136 line (44.36675, -71.52688) 4.3 miles from Whitefield Substation CNR N N PD NH W F
1033 1/31/2023 G 6/24/2020 Solar PV SUN 6 6 6 Ellington CT 9/1/2024 8/1/2024 Eversource Scitico #27H9 NA Y Y NU CT A N
1032 3/30/2023 G 6/23/2020 Eversource Group @ Bell Rock #661 OT SUN BAT 11.992 11.992 11.992 Bristol MA 11/30/2023 9/30/2023 Eversource Bell Rock #661 NA N N SEMA A N
1031 10/19/2022 G 6/18/2020 Solar PV SUN 40 40 40 Hampshire MA 10/1/2023 8/8/2023 10/19/2022 NATIONAL GRID 69 kV LINE F-6W, WARE - DEERFIELD Latitude: 42.287024° Longitude: -72.289276° CNR Y N ISO-NE WMA W F
1030 1/11/2023 G 6/2/2020 Gravel Pit Solar Increase PV SUN 45 120 120 Hartford CT 11/7/2024 10/28/2024 Line cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks. CNR Y Y ISO-NE PD CT A F
1029 2/6/2024 G 5/29/2020 Solar PV SUN 120 120 120 Penobscot ME 12/1/2023 10/2/2023 2/6/2024 Emera Maine 115 kV Line 97 BHE, (Passadumkeag to Graham) NR Y Y ISO-NE PD BHE W F
1028 3/6/2024 G 5/28/2020 Western Maine Wind Project WT WND 58.8 58.8 58.8 Somerset ME 1/29/2025 1/20/2025 CMP 115 kV Section 222 - coordinates 45° 9'30.90"N, 69°51'1.40"W NR Y Y ISO-NE PD ME A F
1027 9/13/2022 G 5/14/2020 Solar + Battery Storage OT SUN BAT 2 2 2 Berkshire MA 12/15/2022 12/1/2022 9/13/2022 National Grid, 13.8kV, DISTRIBUTION CIRCUIT #09-1102W1 CNR Y Y ISO-NE WMA W F
1026 6/23/2020 G 5/8/2020 Solar PV SUN 90 90 90 Oxford ME 11/22/2021 10/25/2021 6/23/2020 CMP Rumford substation 115 kV NR N N PD ME W F
1025 8/25/2020 G 4/27/2020 Solar Increase PV SUN 5 20 20 Androscoggin ME 11/1/2021 10/1/2021 8/25/2020 34.5 kV line from Gulf island to Crowleys substation. 102159-97000-101460 CNR N N PD ME W F
1024 9/25/2024 G 4/28/2020 ENA Old Falmouth Road PV + Storage OT SUN BAT 4.85 4.85 4.85 Barnstable MA 8/8/2024 7/5/2024 The facility is located approximately 5.5 miles from MASHPEE Substation, via the 23 kV#88 circuit. CNR N N SEMA C F
1023 3/4/2022 G 4/24/2020 Solar + Battery Storage OT SUN BAT 2.425 2.425 2.425 Bristol MA 10/20/2021 10/20/2021 3/4/2022 Eversource 13.2 kV Circuit #522 approximately 5.95 miles from Fisher Road substation CNR N N SEMA W F
1022 2/22/2022 G 4/24/2020 Cranberry Highway Solar + Battery Storage OT SUN BAT 2.2 Plymouth MA 2/15/2022 2/5/2022 The primary connection of the proposed project to Eversource Energy is located on Tremont Station 713 Transformer #1 Line #86. The site is located approximately 2.29 circuit miles from Substation 713 near CYME® node 1200910-295. Circuit 3-86-966 CNR N N SEMA C F
1021 7/11/2024 G 4/27/2020 Emery Meadow Solar PV SUN 16.425 16.425 16.425 York ME 9/30/2026 9/15/2026 CMP 34.5 kV, Section 182 CNR Y Y ISO-NE PD ME A F
1020 12/14/2022 G 4/24/2020 Silver Maple Wind CNR WT WND 0 20 20 Penobscot ME 12/14/2022 9/24/2022 Emera Maine 115kV Transmission Line 66, between Graham Substation and Rebel Hill substation, adjacent to Pisgah Mountain Wind Farm. CNR N N BHE C F
1019 9/19/2023 G 4/24/2020 Battery Storage OT BAT 20 20 20 Penobscot ME 4/1/2024 1/1/2024 9/19/2023 Chester 46 kV NR Y N ISO-NE PD BHE W F
1018 8/29/2024 G 4/24/2020 Passadumkeag Wind CNR WT WND 0 39.97 39.97 Peneobscot ME 11/15/2021 11/15/2021 Interconnection shall be at the point where the leads from the switch located on the high side of the 115 kV/34.5 kV transformer connect into the 115 kV ring bus at the Passadumkeag Substation in Greenbush, Maine NR N N BHE C F
1017 8/31/2023 G 4/24/2020 Battery Storage OT BAT 200 200 200 New Haven CT 10/1/2026 7/1/2026 Eversource East Devon 345 kV Substation NR Y Y ISO-NE SWCT A F
1016 5/1/2024 G 4/24/2020 Solar PV SUN 16 16 16 Hillsborough NH 11/25/2024 10/31/2024 5/1/2024 At the Eversource NH 314 line (34.5kV) out of the South Milford substation. NR Y Y ISO-NE NH W F
1015 10/3/2023 G 4/22/2020 Battery Storage OT BAT 112.2 112.2 112.2 Penobscot ME 12/1/2024 9/1/2024 8/22/2023 Orrington 115kV CNR Y N ISO-NE PD BHE W F
1014 10/3/2023 G 4/22/2020 Battery Storage OT BAT 112.2 112.2 112.2 Penobscot ME 6/1/2024 3/1/2024 8/22/2023 EMERA Keene Rd 115 kV substation CNR Y Y ISO-NE PD BHE W F
1013 8/31/2023 G 4/22/2020 Solar PV SUN 17.2 17.2 17.2 Sagadahoc ME 9/30/2025 8/31/2025 CMP 34.5kV line 43, pole 278 NR Y Y ISO-NE PD ME A F
1012 8/28/2020 G 4/20/2020 Combined Cycle CC NG 800 800 850 Suffolk MA 6/1/2024 5/31/2024 8/28/2020 Eversource Mystic 115 kV station CNR N N PD BOST W F
1011 8/28/2020 G 4/20/2020 Combined Cycle CC NG 800 800 850 Suffolk MA 6/1/2024 5/31/2024 8/28/2020 Eversource Mystic 345 kV station CNR N N PD BOST W F
1010 12/1/2021 G 4/10/2020 Berkshire Wind CNR WT WND 0 19.6 19.6 Berkshire MA 9/13/2021 9/13/2021 Eversource 15-E 4 circuit. Interconnection Circuit connects to 115 KV transmission system at Partridge Substation in Pittsfield MA CNR N N WMA C F
1009 3/30/2023 G 4/9/2020 Eversource Group @ Wing Lane 624 OT SUN BAT 18.989 18.989 18.989 Bristol MA 11/30/2023 9/30/2023 Eversource Wing Lane #624 NA N N SEMA A N
1008 3/30/2023 G 4/9/2020 Eversource Group @ West Pond 737 OT SUN BAT 44.12 44.12 44.12 Plymouth MA 11/30/2023 9/30/2023 Eversource West Pond #737 NA N N SEMA A N
1007 3/30/2023 G 4/9/2020 Eversource Group @ Wareham 714 OT SUN BAT 48.019 48.019 48.019 Plymouth MA 11/30/2023 9/30/2023 Eversource Wareham #714 NA N N SEMA A N
1006 3/30/2023 G 4/9/2020 Eversource Group @ Valley 715 OT SUN BAT 9.98 9.98 9.98 Barnstable MA 11/30/2023 9/30/2023 Eversource Valley 715 NA N N SEMA A N
1005 3/30/2023 G 4/9/2020 Eversource Group @ Tremont Substation 713 OT SUN BAT 33.735 33.735 33.735 Plymouth MA 11/30/2023 9/30/2023 Eversource Tremont 713 NA N N SEMA A N
1004 3/30/2023 G 4/9/2020 Eversource Group @ Sandwich 916 OT SUN BAT 11.75 11.75 11.75 Barnstable MA 11/30/2023 9/30/2023 Eversource Sandwich 916 NA N N SEMA A N
1003 3/30/2023 G 4/9/2020 Eversource Group @ Rochester #745 OT SUN BAT 24.618 24.618 24.618 Plymouth MA 11/30/2023 9/30/2023 Eversource Rochester #745 NA N N SEMA A N
1002 3/30/2023 G 4/9/2020 Solar PV SUN 2.76 2.76 2.76 Plymouth MA 11/30/2023 9/30/2023 Eversource Kingston 735 NA N N SEMA A N
1001 3/30/2023 G 4/9/2020 Eversource Group @ Industrial Park 636 OT SUN BAT 29.11 29.11 29.11 Bristol MA 11/30/2023 9/30/2023 Eversource Industrial Park 636 NA N N SEMA A N
1000 3/30/2023 G 4/9/2020 Solar + battery OT SUN BAT 3.15 3.15 3.15 Barnstable MA 11/30/2023 9/30/2023 Eversource Harwich 968 NA N N SEMA A N
999 3/30/2023 G 4/9/2020 Eversource Group @ Fisher Rd Substation 657 OT SUN BAT 27.948 27.948 27.948 Bristol MA 11/30/2023 9/30/2023 Eversource Fisher Rd 657 NA N N SEMA A N
998 3/30/2023 G 4/9/2020 Eversource Group @ Falmouth 993 OT SUN BAT 7.99 7.99 7.99 Barnstable MA 11/30/2023 9/30/2023 Eversource Falmouth 933 NA N N SEMA A N
997 3/30/2023 G 4/9/2020 Eversource Group @ Crystal Spring 646 OT SUN BAT 7.499 7.499 7.499 Middlesex MA 11/30/2023 9/30/2023 Eversource Crystal Spring 646 NA N N SEMA A N
996 3/30/2023 G 4/9/2020 Eversource Group @ Cross Rd 651 OT SUN BAT 9.5 9.5 9.5 Bristol MA 11/30/2023 9/30/2023 Eversource Cross Rd #651 NA N N SEMA A N
995 3/30/2023 G 4/9/2020 Solar + Battery OT SUN BAT 5 5 5 Norfolk MA 11/30/2023 9/30/2023 Eversource Canton #470 NA N N SEMA A N
994 3/30/2023 G 4/9/2020 Solar + battery OT SUN BAT 5.5 5.5 5.5 Middlesex MA 11/30/2023 9/30/2023 Eversource Burlington #391 NA N N SEMA A N
993 3/30/2023 G 4/9/2020 Solar + Battery OT SUN BAT 2 2 2 Plymouth MA 11/30/2023 9/30/2023 Eversource Brook St 727 NA N N SEMA A N
992 3/30/2023 G 4/9/2020 Eversource Group @ Arsene St 654 OT SUN BAT 7 7 7 Bristol MA 11/30/2023 9/30/2023 Eversource Arsene Street #654 NA N N PD SEMA A N
991 3/30/2023 G 4/9/2020 Solar PV SUN 2.5 2.5 2.5 Franklin MA 11/30/2023 9/30/2023 Eversource Cumberland station NA Y Y NU WMA A N
990 3/30/2023 G 4/9/2020 Solar PV SUN 4.89 4.89 4.89 Berkshire MA 11/30/2023 9/30/2023 Eversource Partidge station NA Y Y NU WMA A N
989 3/30/2023 G 4/9/2020 Eversource Group Study @ Blandford PV SUN 12.48 12.48 12.48 Hampden MA 11/30/2023 9/30/2023 Eersource Blandford station NA Y Y NU WMA A N
988 11/1/2021 G 4/7/2020 Solar CNR only PV SUN 0 30 30 Cheshire NH 7/30/2024 6/30/2024 10/31/2021 The Project will interconnect at National Grid’s 115 kV line I-135 via a new three circuit breaker ring bus switching station located at 2.9 miles from Eversource’s Fitzwilliam Substation and 20.5 miles from Fitchburg Gas & Electric Light Company’s Flagg Pond Substation. CNR N N NH W F
987 8/31/2023 G 4/10/2020 Chariot Solar CNR only PV SUN 0 49.5 49.5 Cheshire NH 12/15/2024 11/15/2024 NGrid 115 kV Vernon Road tap to Vernon Road Substation, 2.5 mi from Vernon Road Substation NR N N NH A F
986 8/31/2023 G 4/7/2020 Solar PV SUN 19.99 19.99 19.99 Penobscot ME 11/18/2024 11/18/2024 Graham Substation – 46 kV open bus tie/breaker -via a tapped existing line approximately 5.1 miles to the substation. (44 51 39.25 N 68 39 28.19 W) NR Y Y ISO-NE PD BHE A F
985 7/20/2021 G 4/2/2020 Solar PV SUN 4 4 4 Washington ME 7/29/2021 7/15/2021 7/20/2021 Emera Maine 34.5kV Line 3 approximately 1.8 miles from Washington County Substation (WCS) CNR N N BHE W F
984 5/31/2023 G 4/1/2020 Storage OT BAT 150 150 150 Middlesex MA 9/20/2023 5/31/2023 5/31/2023 National Grid 115kV line 1/2 mile to the East of Billerica 70 substation CNR Y Y ISO-NE BOST W F
983 6/18/2020 G 3/31/2020 Solar PV SUN 40 40 40 Androscoggin ME 11/15/2022 10/16/2022 6/18/2020 The project will connect at Central Maine Power 200A at Switch 200A-2 (115 kV) CNR N N PD ME W F
982 8/10/2023 G 3/30/2020 Wind WT WND 3.8 3.8 3.8 Litchfield CT 9/1/2024 7/1/2024 Eversource Canton 5R NA N N PD CT A N
981 3/24/2022 G 3/27/2020 Bridgeport Harbor Unit #5 Uprate CC DFO NG 0.4 509.6 532.6 Fairfield CT 12/22/2021 12/22/2021 UI Singer Substation 345kv CNR N N PD SWCT C F
980 3/5/2021 G 3/26/2020 Solar addition PV SUN 10 20 20 Sullivan NH 11/15/2022 10/30/2022 3/5/2021 River Road 46 kV (Bus No 108291) is same as the previous interconnection QP799 CNR N N PD NH W F
979 8/26/2024 ETU 3/26/2020 NECEC 1200 MW HVDC (controllable - import only) CNR NA N/A 0 Androscoggin ME 1/7/2026 9/1/2024 N/A NI N N ME A F
978 3/30/2023 G 3/25/2020 Eversource Group Study @ Wing Lane PV SUN 5.08 5.08 5.08 Bristol MA 11/30/2023 9/30/2023 Eversource Wing Lane 624 NA Y Y NSTAR PD SEMA A N
977 3/30/2023 G 3/25/2020 Eversource Group Study @ Wareham OT SUN BAT 55.14 55.14 55.14 Plymouth MA 11/30/2023 9/30/2023 Eversource Wareham 714 NA Y Y NSTAR PD SEMA A N
976 3/30/2023 G 3/25/2020 Eversource Group Study @ Industrial Park OT SUN BAT 11.338 11.338 11.338 Bristol MA 11/30/2023 9/30/2023 Eversource Industrial Park 636 NA Y Y NSTAR PD SEMA A N
975 3/30/2023 G 3/25/2020 Eversource Group Study @ Crystal Spring OT SUN BAT 20.46 20.46 20.46 Plymouth MA 11/30/2023 9/30/2023 Eversource Crystal Spring 646 NA Y Y NSTAR PD SEMA A N
974 3/30/2023 G 3/25/2020 Solar plus Battery OT SUN BAT 4.999 4.999 4.999 Bristol MA 11/30/2023 9/30/2023 Eversource Cross Road 651 NA Y Y NSTAR PD SEMA A N
973 3/30/2023 G 3/25/2020 Eversource Group Study @ Brook St OT SUN BAT 9.778 9.778 9.778 Plymouth MA 11/30/2023 9/30/2023 Eversource Brook St NA Y Y NSTAR PD SEMA A N
972 5/16/2022 G 3/25/2020 Rumford Power Repair for Performance Upgrade CC NG 0.205 271 280 Oxford ME 11/15/2021 11/15/2021 Interconnection of Rumford Power’s 115 kV Bus to CMP’s 115kV bus, located on Rumford Power's support structure, extending to CMP’s 115kV Rumford Industrial Park Substation CNR N N PD ME C F
971 8/2/2024 G 3/26/2020 Combined Cycle Upgrade CC NG 4 564 588 Fairfield CT 7/12/2021 7/12/2021 UI Singer Substation CNR N N PD SWCT C F
970 7/9/2020 G 3/18/2020 Wood River Substation - NG Western RI DG Area Study PV SUN 7.84 7.84 7.84 Washington RI 8/15/2021 8/1/2021 NG Wood River Substation NA Y Y NGRID PD RI A N
969 7/9/2020 G 3/18/2020 Tower Hill Substation - NG Western RI DG Area Study PV SUN 2 2 2 Washington RI 8/15/2021 8/1/2021 NG Tower Hill Substation NA Y Y NGRID PD RI A N
968 7/9/2020 G 3/18/2020 Putnam Pike Substation - NG Western RI DG Area Study PV SUN 5.62 5.62 5.62 Providence RI 8/15/2021 8/1/2021 NG Putnam Pike Substation NA Y Y NGRID PD RI A N
967 7/9/2020 G 3/18/2020 Old Baptist Road Substation - NG Western RI DG Area Study PV SUN 4.422 4.422 4.422 Washington RI 8/15/2021 8/1/2021 NG Old Baptist Road Substation NA Y Y NGRID PD RI A N
966 3/19/2020 G 3/18/2020 New London Substation - NG Western RI DG Area Study PV SUN 3 3 3 Kent RI 8/15/2021 8/1/2021 NG New London Substation NA N N PD RI A N
965 7/9/2020 G 3/18/2020 Kent County Substation - NG Western RI DG Area Study PV SUN 10.368 10.368 10.368 Kent RI 8/15/2021 8/1/2021 NG Lafayette No. 30 (supplied by Kent County Substation) NA Y Y NGRID PD RI A N
964 7/9/2020 G 3/18/2020 Kenyon Substation - NG Western RI DG Area Study PV SUN 3.5 3.5 3.5 Washington RI 8/15/2021 8/1/2021 NG Kenyon Substation NA Y Y NGRID PD RI A N
963 7/9/2020 G 3/18/2020 Johnston Substation - NG Western RI DG Area Study PV SUN 4.25 4.25 4.25 Providence RI 8/15/2021 8/1/2021 NG Johnston Substation NA Y Y NGRID PD RI A N
962 7/9/2020 G 3/18/2020 Drumrock - NG Western RI DG Area Study PV SUN 3.85 3.85 3.85 Kent RI 8/15/2021 8/1/2021 NG Drumrock NA Y Y NGRID PD RI A N
961 7/9/2020 G 3/18/2020 Wolf Hill substation - NG Western RI DG Area Study PV SUN 2.2 2.2 2.2 Providence RI 8/15/2021 8/1/2021 NG Wolf Hill Substation NA Y Y NGRID PD RI A N
960 7/9/2020 G 3/18/2020 Chase Hill Substation - NG Western RI DG Area Study PV SUN 6.339 6.339 6.339 Washington RI 8/15/2021 8/1/2021 NG Chase Hill Substation NA Y Y NGRID PD RI A N
959 7/9/2020 G 3/18/2020 Chase Hill Substation - NG Western RI DG Area Study PV SUN 6.75 6.75 6.75 Washington RI 8/15/2021 8/1/2021 NG feeder 88F1, Chase Hill Substation NA Y Y NGRID PD RI A N
958 8/4/2021 G 3/18/2020 Wood River - NG Western RI DG Area Study PV SUN 6.474 6.474 6.474 Washington RI 1/24/2022 1/17/2022 NG feeder 85T2, Wood River Substation NA Y Y NGRID PD RI A N
957 5/26/2022 G 3/18/2020 Tower Hill - NG Western RI DG Area Study PV SUN 6.75 6.75 6.75 Washington RI 1/15/2023 12/15/2022 NG feeder 88F1, Tower Hill substation NA Y Y NGRID PD RI A N
956 5/1/2024 G 3/16/2020 Solar PV SUN 10 10 10 Rockingham NH 10/28/2024 10/4/2024 5/1/2024 Eversource NH 3103 Line (34.5 kV) out of Brentwood substation extended along Exeter Rd NR Y Y ISO-NE NH W F
955 8/26/2020 G 3/12/2020 Vineyard Offshore Wind CNR Only WT WND 0 800 800 NA MA 10/31/2024 1/2/2024 Eversource 115kV Barnstable Switch Station CNR N N SEMA A F
954 3/21/2023 G 3/5/2020 Tiverton Uprate CC NG 0 287.5 305.5 Newport RI 5/31/2021 5/31/2021 Interconnection with Narragansett Electric Company's M13 and L14 115kV line taps to NEC's Tiverton substation. CNR N N PD SEMA C F
953 2/14/2024 G 2/19/2020 BD Solar Church Hill PV SUN 20 20 20 Androscoggin ME 12/31/2026 11/30/2026 101105 Augusta East w New Breaker NR Y Y ISO-NE ME A F
952 4/8/2020 G 2/18/2020 Solar PV SUN 4.99 4.99 4.99 Androscoggin ME 9/30/2021 8/31/2021 4/8/2020 CMP 34.5kV line. 44.074807, -70.280400 NR N N ME W F
951 11/4/2024 G 2/3/2020 Riley-Jay-Otis-Livermore HD WAT 28.325 28.325 28.325 Androscoggin/Franklin ME 11/1/2024 2/27/2024 CMP 115 kV Section 230 NR Y Y ISO-NE PD ME C F
950 8/23/2022 G 1/20/2020 Solar PV SUN 17 17 17 Oxford ME 6/20/2024 6/15/2024 8/23/2022 New substation on CMP 34.5 kV circuit Section #97 as shown on one-line CNR Y N ISO-NE PD ME W F
949 3/9/2023 G 1/23/2020 Fuel Cell FC NG 9.66 9.66 9.66 Fairfield CT 12/1/2024 12/1/2024 UI 13.8kV Congress I Substation NA Y Y UI SWCT A N
948 11/3/2020 G 1/10/2020 Solar PV SUN 51.02 51.02 51.02 Grafton NH 6/1/2022 5/1/2022 11/3/2020 Eversource 115kV B-112 transmission line just east of Beebe River Substation CNR N N PD NH W F
947 3/12/2020 G 1/7/2020 Battery Storage OT BAT 200 200 200 Androscoggin ME 12/7/2022 12/7/2022 3/12/2020 Sec 377, Approx. 2.71 miles east of Surowiec 345kV bus CNR N N PD ME W F
946 4/1/2020 G 12/27/2019 Solar PV SUN 18.4 18.4 18.4 York ME 8/31/2021 8/15/2021 4/1/2020 CMP 34.5 kv, Section 182 CNR N N CMP PD ME W F
945 6/9/2021 G 12/18/2019 ND OTM LLC Generator Reactivation ST BLQ WDS 8 8 8 Penobscot ME 6/5/2021 6/5/2021 Emera Maine 46 kv Line 5/7 / Old Town Maine @ Penobscot River NR Y Y ISO-NE PD BHE C F
944 8/8/2024 G 12/18/2019 Bay State Wind 4 Offshore Wind WT WND 1200 1200 1200 NA MA 11/4/2033 3/27/2033 National Grid Brayton Point 345kV NR Y Y ISO-NE PD RI A F
943 11/12/2021 G 12/12/2019 Solar PV SUN 15 15 15 Androscoggin ME 11/1/2021 10/1/2021 11/12/2021 Interconnecting to the existing CMP 34.5 kV line Section 72 between Gulf Island and Crowleys (about 3.85 miles from Crowleys). CNR Y N ISO-NE PD ME W F
942 4/29/2024 G 12/10/2019 Brayton Road Solar PV SUN 8.423 8.423 8.423 Newport RI 2/15/2024 1/9/2024 GRID 33F4 Feeder Connecting to Tiverton No. 2 substation NA Y Y NGRID PD SEMA C N
941 4/29/2024 G 12/10/2019 Brayton Road Solar PV SUN 3.368 3.368 3.368 Newport RI 2/15/2024 1/9/2024 GRID 33F4 Feeder Connecting to Tiverton No. 2 substation NA Y Y NGRID PD SEMA C N
940 11/5/2024 G 12/4/2019 Gravel Pit Solar increase PV SUN 25 75 75 Hartford CT 11/7/2024 10/28/2024 Line cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks. CNR Y Y ISO-NE PD CT A F
939 8/31/2023 G 11/25/2019 NB Fuel Cell FC NG 20 20 20 Hartford CT 12/15/2024 5/28/2024 Black Rock Substation (Eversource) via the Farmington River Power Company owned Burritt St substation 69kv line 680 NR Y Y ISO-NE CT A F
938 9/21/2020 G 11/21/2019 Solar PV SUN 35 35 35 Merrimack NH 10/3/2022 9/25/2022 9/21/2020 POI is Eversource NH pole 317/153 of the 317 line out of the Oak Hill Substation. CNR N N NH W F
937 8/12/2021 G 11/14/2019 Solar CNR only PV SUN 0 150 150 York ME 12/31/2022 12/15/2022 8/12/2021 CMP/Eversource 345 kV Line 391 from Buxton substation to Scobie Pond substation (approx. 27.7 miles from Buxton substation) CNR N N ME W F
936 12/6/2023 G 10/30/2019 Solar PV SUN 45 45 45 Coos NH 10/1/2024 9/10/2024 12/6/2023 115 kV bus of Eversource Paris Substation. NR Y Y ISO-NE NA NH W F
935 8/12/2024 G 10/30/2019 West Baldwin Solar PV SUN 17.1 17.1 17.1 Cumberland ME 9/30/2029 8/31/2029 CMP 34.5 kv Line, Section 91 NR Y Y ISO-NE PD ME A F
934 8/31/2023 G 10/25/2019 Pembroke Solar PV SUN 17.5 17.5 17.5 Merrimack NH 9/1/2024 8/5/2024 Eversource Pole 334/201 of the 334G Line looped between Garvins & Rimmon, roughly 3.5 miles from Garvins NR Y Y ISO-NE NA NH A F
933 12/1/2020 G 10/22/2019 Coolidge Solar CNR Only PV SUN 0 19.9 19.9 Windsor VT 11/13/2020 12/12/2018 115 kV Coolidge Substation CNR N N NA VT C F
932 1/3/2023 G 10/22/2019 Solar PV SUN 110 110 110 Carroll NH 10/3/2025 9/12/2025 11/23/2022 115 kV Eversource K1214 line between Saco Valley and Lovell, approximately 3.46 miles from Saco Valley. CNR Y N ISO-NE PD ME W F
931 10/18/2024 G 10/22/2019 Roxbury Solar PV SUN 55 55 55 Oxford ME 10/24/2024 10/3/2024 10/18/2024 CMP Roxbury substation 115 kV bus NR Y Y ISO-NE PD ME W F
930 10/24/2022 G 10/17/2019 Millstone Increase ST NUC 37 1262 1262 New London CT 5/26/2022 5/26/2022 Eversource's Millstone 345 KV switchyard (15G) - no change to existing connection CNR Y Y ISO-NE PD CT C F
929 8/31/2023 G 10/15/2019 GDC Saco Solar PV SUN 20 20 20 York ME 4/30/2025 3/15/2025 CMP Louden 34.5kV substation NR Y Y ISO-NE PD ME A F
928 11/27/2023 G 10/9/2019 Solar PV SUN 20 20 20 Somerset ME 4/1/2027 3/15/2027 11/27/2023 34.5 kV bus at CMP's Lakewood Substation in Madison, Maine CNR Y N ISO-NE PD ME W F
927 8/7/2024 G 9/16/2019 Offshore Wind WT WND 1200 1200 1200 NA CT 5/31/2031 1/31/2031 8/7/2024 Primary: Eversource (CL&P) 345kV Montville, Alternatively Eversource (CL&P) 345kV Millstone. NR Y Y ISO-NE PD CT W F
926 11/6/2020 G 9/11/2019 Offshore Wind Increase (Q781) WT WND 167 871 871 NA RI 12/1/2023 4/30/2023 11/6/2020 National Grid's 115kV Davisville Substation CNR N N PD RI W F
925 5/31/2023 ETU 9/6/2019 NY QP556 AC NA N/A 0 0 0 Onieda/Albany NY 12/31/2023 12/31/2023 NY Edic - New Scotland 345 kV N/A N N PD N/A A N
924 5/31/2023 ETU 9/6/2019 NY QP543 AC NA N/A 0 0 0 Albany/Dutchess NY 12/31/2023 12/31/2023 NY Greenbush PV 345 kV N/A N N PD A N
923 10/30/2024 G 9/3/2019 Solar PV SUN 20 20 20 Androscoggin ME 11/25/2024 11/18/2024 CMP 34.5 kV Leeds substation NA Y Y CMP PD ME A N
922 5/24/2022 G 9/3/2019 Offshore wind Increase (Q829) WT WND 200 600 600 NA MA 7/1/2025 4/1/2025 5/24/2022 NSTAR Electric Company 345 kV lines 322 and 342 CNR N N PD SEMA W F
921 10/21/2019 G 8/29/2019 Solar and Battery OT SUN BAT 9.35 9.35 9.35 York ME 12/31/2020 12/1/2020 10/17/2019 CMP Bonney Easgle substation - Circuit 610D2 NA N N PD ME W N
920 10/21/2019 G 8/29/2019 Solar and Battery OT SUN BAT 11.68 11.68 11.68 York ME 12/31/2020 12/1/2020 10/17/2019 CMP Biddleford Pump station - Circuit 605D1 NA N N PD ME W N
919 10/21/2019 G 8/29/2019 Solar and Battery OT SUN BAT 5 5 5 Knox ME 12/31/2020 12/1/2020 10/17/2019 CMP Thomaston Creek substation - Circuit 246D1 NA N N PD ME W N
918 10/21/2019 G 8/29/2019 Solar and Battery OT SUN BAT 5 5 5 Howard ME 12/31/2020 12/1/2020 10/17/2019 CMP Trap Corner substation, Circuit 453D1 NA N N PD ME W N
917 10/21/2019 G 8/29/2019 Solar and Battery OT SUN BAT 7.5 7.5 7.5 Androscoggin ME 12/31/2020 12/1/2020 10/17/2019 CMP Great Falls substation, Circuit 436D6 NA N N PD ME W N
916 10/21/2019 G 8/29/2019 Solar and Battery OT SUN BAT 5 5 5 Cumberland ME 12/31/2020 12/1/2020 10/17/2019 CMP Fort Hill substation, Circuit 624D1 NA N N PD ME W N
915 10/21/2019 G 8/29/2019 Solar and Battery OT SUN BAT 5 5 5 Oxford ME 12/31/2020 12/1/2020 10/17/2019 CMP Rumford substation, Curcuit 447D2 NA N N PD ME W N
914 10/21/2019 G 8/29/2019 Solar PV SUN 5 5 5 Androscoggin ME 12/31/2020 12/1/2020 10/17/2019 CMP Deer Rips substation, curcuit 412D4 NA N N PD ME W N
913 10/21/2019 G 8/29/2019 Solar PV SUN 9.98 9.98 9.98 Androscoggin ME 12/31/2020 12/1/2020 10/17/2019 CMP Hotel Road substation, Curcuit 420D4 NA N N PD ME W N
912 10/22/2021 G 8/23/2019 Bloom Energy Fuel Cell FC FC 10.2 10.2 10.2 New London CT 10/20/2021 10/7/2021 Eversource Willimantic 14S NA Y Y NU PD CT C N
911 7/5/2022 G 8/22/2019 Solar PV SUN 35 35 35 Oxford ME 12/30/2024 12/14/2024 7/5/2022 34.5 kV bus at CMP's Lovell Substation. Lat/Lon 44° 7.315'N, 70° 53.332'W CNR Y Y ISO-NE PD ME W F
910 8/11/2022 G 8/15/2019 Mousam River Solar PV SUN 20 20 20 York ME 9/30/2025 9/15/2025 34.5 kV bus at CMP Sanford Substation ( 43° 25.746'N, 70° 44.085'W) CNR Y Y ISO-NE PD ME A F
909 2/13/2024 G 8/1/2019 Offshore Wind WT WND 814 814 814 NA MA 5/31/2026 4/1/2026 2/13/2024 Primary National Grid 115kV Bell Rock, alt: Eversource 115kV Wings Lane, National Grid 115kV Somerset NR N N PD SEMA W F
908 10/21/2019 G 8/1/2019 Solar PV SUN 8.999 8.999 8.999 Somerset ME 12/31/2020 12/1/2020 10/17/2019 CMP Skowhegan North Side substation, Circuit 853D1 and 853D2 NA N N ME W N
907 10/21/2019 G 8/1/2019 Solar PV SUN 5 5 5 Androscoggin ME 8/31/2020 8/1/2020 10/17/2019 CMP Hotel Road substation, Circuit 420D4 NA N N ME W N
906 3/14/2023 G 8/1/2019 Solar PV SUN 4.8 4.8 4.8 York ME 7/14/2022 7/1/2022 CMP Pratt & Whitney substation, Circuit 661D2 NA Y Y CMP ME C N
905 2/14/2024 G 8/1/2019 Battery Storage OT BAT 10 10 10 Cumberland ME 8/1/2024 8/1/2024 CMP Mussey Road substation, Circuit 636D2 NA Y Y CMP ME A N
904 3/14/2023 G 8/1/2019 Battery Storage OT BAT 14 14 14 Kennebec ME 1/25/2024 1/1/2024 CMP Puddledock substation, circuit 262D1 NA Y Y CMP ME A N
903 7/14/2022 G 8/1/2019 Solar PV SUN 6.999 6.999 6.999 Kennebec ME 7/13/2022 5/24/2022 CMP Winslow substation, Circuit 870D2 NA Y Y CMP ME C N
902 7/2/2021 G 8/1/2019 Solar PV SUN 7.2 7.2 7.2 Kennebec ME 7/2/2021 6/22/2021 CMP Blair Road substation, Circuit207D2 NA Y Y CMP ME C N
901 6/28/2021 G 8/1/2019 Solar PV SUN 4.6 4.6 4.6 Oxford ME 6/14/2021 6/4/2021 CMP Oxford substation, Circuit 437D2 NA Y Y CMP ME C N
900 6/28/2021 G 8/1/2019 Solar PV SUN 4.6 4.6 4.6 Oxford ME 6/14/2021 6/4/2021 CMP Oxford subsation, Circuit 437D1 NA Y Y CMP ME C N
899 7/31/2020 ETU 7/29/2019 1200 MW HVDC Line into Singer (Controllable) NA N/A 1200 Fairfield CT 9/1/2024 7/1/2024 7/31/2020 The proposed point of interconnection is 345kV Singer substation in Bridgeport, CT. N/A N N PD SWCT W F
898 8/28/2019 G 7/26/2019 Solar PV SUN 33.1 33.1 33.1 Grafton NH 6/1/2022 5/1/2022 8/28/2019 NGRID 34.5kV transmission/distribution line 3318 in Monroe, NH CNR N N NH W F
897 8/28/2019 G 7/26/2019 Solar PV SUN 60 60 60 Grafton NH 6/1/2022 5/1/2022 8/28/2019 Eversource 34.5kV bus at the Beebe River Substation CNR N N NH W F
896 8/9/2024 G 7/17/2019 Saco Solar PV SUN 19.6 19.6 19.6 York ME 7/1/2026 6/1/2026 CMPCO 34.5kV Louden Substation Saco, Maine NR Y Y ISO-NE PD ME A F
895 8/9/2019 G 6/27/2019 CT additional GT NG WO 10 37.05 43.25 Tolland CT 2/1/2021 2/1/2021 8/9/2019 Connecticut Light and Power Company d/b/a Eversource Connecticut (ES CT) Card-Mansfield 900 Line operating at 69 kV at the North Eagleville / King Hill Road intersection CNR N N CT W F
894 12/2/2021 G 6/10/2019 Gas turbine repowering (Alt. to Q647) GT DFO NG 23 376 378 Middlesex CT 5/31/2025 1/16/2025 12/2/2021 Middletown 115 kV substation, Bus A, between breakers 1T and 2T CNR Y Y ISO-NE CT W F
893 10/20/2021 G 6/7/2019 Offshore Wind WT WND 1200 1200 1200 NA CT 5/31/2025 6/1/2024 10/20/2021 Millstone 345kV alternate: lines 348 and 310 CNR N N PD CT W F
892 4/20/2021 G 6/5/2019 Gravel Pit Solar PV SUN 50 50 50 Hartford CT 11/7/2024 10/28/2024 Line cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks CNR Y Y ISO-NE CT A F
891 1/16/2020 ETU 5/29/2019 1400 MW HVDC Line into Millstone NA N/A 1400 New London CT 3/1/2024 1/1/2024 1/16/2020 The proposed point of Interconnection is the Eversource Millstone 345kV substation in Waterford, CT - Alternate is Haddam 345 kV Substation N/A N N PD CT W F
890 6/26/2020 ETU 5/13/2019 Increase transfer capability for N to S flows (Norwalk Harbor substation to Northport substation) NA N/A NA CT 7/1/2023 6/2/2023 6/26/2020 N/A N/A N N SWCT W F
889 6/5/2023 ETU 5/1/2019 NECEC Elective Transmission Deliverability Upgrades NA N/A Androscoggin ME 8/28/2025 8/28/2025 N/A N/A Y Y ISO-NE PD ME A F
888 3/4/2021 G 4/26/2019 Millinocket Battery additon OT WAT BAT 0 126 126 Penobscot ME 12/30/2020 12/7/2020 115/34.5 kV Powersville Rd Substation and Millinocket Sub 4, 34.5 kV Bus CNR Y Y ISO-NE PD BHE C F
887 11/14/2023 G 4/26/2019 Battery Storage OT BAT 150 150 150 Plymouth MA 5/31/2026 4/30/2026 11/14/2023 Eversource Line 113 at Wareham 115 kV substation NR Y N ISO-NE PD SEMA W F
886 3/9/2020 G 4/26/2019 Battery Storage OT BAT 200 200 200 Norfolk MA 5/31/2023 4/30/2023 3/6/2020 Eversource 345 kV Holbrook CNR N N PD SEMA W F
885 9/3/2019 G 4/25/2019 Fuel Cell FC NG 20.24 20.24 20.24 Hartford CT 6/30/2020 5/1/2020 9/3/2019 Black Rock Substation (Eversource) via the Farmington River Power Company owned Burritt St substation 69kv line 680 CNR N N CT W F
884 1/12/2021 G 4/24/2019 Nutmeg Solar CNR only PV SUN 0 19.9 19.9 Hartford CT 12/7/2020 11/15/2020 115kV Sitico Sub CNR N N CT C F
883 6/17/2022 G 4/24/2019 Kendall Combined Cycle increase CC DFO NG 16.449 264.953 268.523 Middlesex MA 6/1/2025 6/1/2025 Kendall CT and Kendall Steam 3: point where Eversource Line 875-539 connects to Eversource 115 kV bus at Station 875. Kendall Jet: point where Eversource breaker J1242 connects to A bus at Kendall Station. CNR Y Y ISO-NE PD BOST A F
882 12/14/2021 G 4/24/2019 Kendall CNR Restoration CC DFO NG 13.551 248.504 252.074 Middlesex MA 11/4/2021 11/4/2021 Kendall CT and Kendall Steam 3: point where Eversource Line 875-539 connects to Eversource 115 kV bus at Station 875. Kendall Jet: point where Eversource breaker J1242 connects to A bus at Kendall Station. CNR Y Y BOST C F
881 6/2/2020 G 4/18/2019 Fore River CNR Uprate CC DFO NG 0 800 843 Norfolk MA 6/1/2020 6/1/2020 NSTAR Edgar 115kv substation. CNR N N SEMA C F
880 5/15/2019 G 4/17/2019 Generator reactivation ST BLQ WDS 24 24 24 Penobscot ME 10/30/2020 9/30/2020 5/15/2019 Emera Maine 46kv Line 5/7 / Old Town Maine @ Penobscot River CNR N N BHE W F
879 5/28/2019 G 4/15/2019 Simple Cycle Combustion Turbine Repowering (alternative to Q647) GT DFO NG 0 376 378 Middlesex CT 5/31/2023 1/16/2023 5/28/2019 Middletown 115 kV substation, Bus A, between breakers 1T and 2T CNR N N CT W F
878 5/2/2019 G 4/15/2019 Solar PV SUN 19.8 19.8 19.8 Sullivan NH 11/5/2020 3/5/2020 5/1/2019 Eversource Lost Nation Substation (34.5 kV) NR N N PD NH W F
877 1/25/2024 G 4/11/2019 Energy Storage OT BAT 170 170 170 Norfolk MA 7/26/2027 6/26/2027 National Grid's South Wrentham 115kV substation NR Y Y ISO-NE PD SEMA A F
876 12/21/2021 G 4/11/2019 Energy Storage OT BAT 246 246 246 Bristol MA 12/31/2024 10/28/2024 12/20/2021 Eversource 115kV Cross Road Substation Line 109 CNR Y Y ISO-NE PD SEMA W F
875 10/27/2021 G 4/8/2019 Farmington Solar CNR only PV SUN 0 78.4 78.4 Franklin ME 10/27/2021 9/9/2021 CMP's Sturtevant - Livermoore Fall 115 kV line CNR N N NA ME C F
874 11/29/2021 G 4/8/2019 Cross Town Battery Storage OT BAT 175 175 175 Cumberland ME 8/29/2025 5/30/2025 CMP Mosher 115kV Substation - Lat: 43°41'2.39"N Long: 70°23'56.24"W CNR Y Y ISO-NE PD ME A F
873 7/2/2020 ETU 4/4/2019 1200 MW HVDC Line (controllable) Into Mystic NA N/A 1200 Middlesex MA 8/1/2024 5/1/2024 7/2/2020 The proposed point of Interconnection is: NSTAR Mystic 345kV Substation N/A N N PD BOST W F
872 2/10/2020 G 4/1/2019 Battery Storage OT BAT 180 180 180 Washington RI 3/1/2023 11/15/2022 2/8/2020 National Grid 115kV Kent County- West Kingston line Approx: Latitude: 41°28'50.34"N, Longitude: 71°34'24.82"W CNR N N PD RI W F
871 1/17/2020 G 3/28/2019 Energy Storage OT BAT 100 100 100 Grafton NH 5/31/2023 3/1/2022 1/17/2020 PSNH 115kV Littleton substation CNR N N PD NH W F
870 7/31/2024 G 3/26/2019 Solar PV SUN 6.22 6.22 6.22 Providence RI 9/30/2024 4/1/2022 NG feeder 26W7, Woonsocket substation NA Y Y NGRID PD RI A N
869 8/6/2024 G 3/26/2019 Solar PV SUN 6.22 6.22 6.22 Providence RI 12/31/2024 4/1/2022 NG feeder 26W1, Woonsocket substation NA Y Y NGRID PD RI A N
868 10/18/2024 G 4/10/2019 Nellie Solar PV SUN 15 15 15 Sullivan NH 10/1/2024 9/4/2024 10/18/2024 Eversource 34.5 kV line 3410 out of the North Road substation, extended along Maple Street, Newport NH. NR Y Y ISO-NE PD NH W F
867 10/27/2021 G 3/21/2019 Wilbraham substation - NG Western MA Area Cluster Study PV SUN 4 4 4 Hampden MA 12/3/2020 12/3/2020 NG Wilbraham substation NA Y Y NGRID WMA C N
866 3/4/2021 G 3/21/2019 Whitmanville substation - NG Western MA Area Cluster Study PV SUN 26.612 26.612 26.612 Worcester MA 8/1/2020 8/1/2020 NG Whitmanville substation NA Y Y NGRID WMA W N
865 10/27/2021 G 3/21/2019 West Hampden 139 substation - NG Western MA Area Cluster Study PV SUN 13.173 13.173 13.173 Hampden MA 3/10/2023 7/5/2019 NG West Hampden substation NA Y Y NGRID WMA A N
864 10/27/2021 G 3/21/2019 W. Charlton substation - NG Western MA Area Cluster Study PV SUN 17.032 17.032 17.032 Worcester MA 10/10/2022 8/29/2020 NG W. Charlton substation NA Y Y NGRID WMA A N
863 10/27/2021 G 3/21/2019 Treasure Valley substation - NG Western MA Area Cluster Study PV SUN 2.23 2.23 2.23 Worcester MA 9/19/2019 9/19/2019 NG Treasure Valley substation NA Y Y NGRID WMA C N
862 10/27/2021 G 3/21/2019 Stafford Street substation - NG Western MA Area Cluster Study PV SUN 20.38 20.38 20.38 Worcester MA 10/1/2022 8/1/2020 10/20/2021 NG Stafford Street substation NA Y Y NGRID WMA W N
861 10/27/2021 G 3/21/2019 Snow Street substation - NG Western MA Area Cluster Study PV SUN 24.652 24.652 24.652 Worcester MA 4/5/2023 12/31/2020 NG Snow Street substation NA Y Y NGRID WMA A N
860 10/27/2021 G 3/21/2019 Shutesbury substation - NG Western MA Area Cluster Study PV SUN 19.992 19.992 19.992 Hampshire MA 12/31/2023 12/31/2021 NG Shutesbury substation NA Y Y NGRID WMA A N
859 2/26/2020 G 3/21/2019 Prospect Street substation - NG Western MA Area Cluster Study PV SUN 2 2 2 Worcester MA 8/1/2020 8/1/2020 2/18/2020 NG Prospect Street Substation NA N N WMA W N
858 2/26/2020 G 3/21/2019 Pratts Junction substation - NG Western MA Area Cluster Study PV SUN 2 2 2 Worcester MA 8/1/2020 8/1/2020 2/18/2020 NG Pratts Junction substation NA N N WMA W N
857 3/4/2021 G 3/21/2019 Powder Mill substation - NG Western MA Area Cluster Study PV SUN 70.664 70.664 70.664 Worcester MA 8/1/2020 8/1/2020 NG Powder Mill substation NA Y Y NGRID WMA W N
856 3/4/2021 G 3/21/2019 New Salem substation - NG Western MA Area Cluster Study PV SUN 21.272 21.272 21.272 Worcester MA 8/1/2020 8/1/2020 NG New Salem substation NA Y Y NGRID WMA W N
855 10/27/2021 G 3/21/2019 Millbury substation - NG Western MA Area Cluster Study PV SUN 14.44 14.44 14.44 Worcester MA 11/1/2023 5/21/2022 NG Millbury substation NA Y Y NGRID WMA A N
854 10/27/2021 G 3/21/2019 Litchfield substation - NG Western MA Area Cluster Study PV SUN 9.49 9.49 9.49 Worcester MA 4/30/2021 4/30/2021 NG Litchfield substation NA Y Y NGRID WMA C N
853 10/27/2021 G 3/21/2019 East Longmeadow substation - NG Western MA Area Cluster Study PV SUN 8.99 8.99 8.99 Hampden MA 8/7/2022 11/15/2019 NG East Longmeadow NA Y Y NGRID WMA A N
852 10/27/2021 G 3/21/2019 E. Webster substation - NG Western MA Area Cluster Study PV SUN 4.88 4.88 4.88 Worcester MA 10/1/2023 8/9/2022 NG E.. Webster substation NA Y Y NGRID WMA A N
851 2/26/2020 G 3/21/2019 Brookfield substation - NG Western MA Area Cluster Study PV SUN 24 24 24 Worcester MA 8/1/2020 8/1/2020 2/18/2020 NG Brookfield substation NA N N WMA W N
850 10/27/2021 G 3/21/2019 Bear Swamp Upper Yard substation - NG Western MA Area Cluster Study PV SUN 2.5 2.5 2.5 Berkshire MA 9/8/2021 9/8/2021 NG Bear Swamp Upper Yard substation NA Y Y NGRID WMA C N
849 10/27/2021 G 3/21/2019 Ashburnham substation - NG Western MA Area Cluster Study PV SUN 4.98 4.98 4.98 Worcester MA 1/12/2023 1/12/2023 NG Ashburnham substation NA N N WMA A N
848 10/27/2021 G 3/21/2019 Adams substation - NG Western MA Area Cluster Study PV SUN 10.978 10.978 10.978 Berkshire MA 12/31/2021 12/2/2021 NG Adams substation NA Y Y NGRID WMA A N
847 3/9/2020 G 3/19/2019 Battery Storage OT BAT 150 150 150 Essex MA 5/31/2023 4/30/2023 3/6/2020 Primary POI: Expand NGRID S.Danvers 115 kV substation by connecting to B-154N line Alternative POI: Tap B-154N line two spans west of the S. Danvers substation to construct a new three-breaker ring bus CNR N N PD BOST W F
846 8/10/2022 G 3/19/2019 Offshore Wind Increase WT WND 40 840 840 NA MA 5/31/2026 9/21/2025 8/10/2022 National Grid, 345 kV Brayton Point Substation, Somerset, MA CNR Y Y ISO-NE PD RI W F
845 11/12/2019 G 3/18/2019 Solar PV SUN 20 20 20 Windham CT 7/1/2020 6/1/2020 11/8/2019 3 Breaker Ring Bus on the Eversource 1607 Line (modeling based on same point as Exeter Tap for practical purposes) CNR N N PD CT W F
844 10/19/2023 G 3/13/2019 Medway Grid Battery Storage OT BAT 250 250 250 Norfolk MA 12/1/2025 10/1/2025 Eversource 345 kV West Medway substation CNR Y Y ISO-NE PD SEMA A F
843 4/18/2019 G 3/7/2019 Solar PV SUN 12 12 12 Essex VT 7/1/2020 6/1/2020 4/18/2019 POI location: 44.777214,-71.633269 New 34.5 kV Line Tap at VEC Pole 84-872 CNR N N VT W F
842 9/27/2021 G 3/5/2019 Milo Solar PV SUN 20 20 20 Pisataquis ME 9/25/2021 6/2/2021 EMERA 46kV 28 ME-16 Milo, Maine CNR Y Y ISO-NE BHE C F
841 12/27/2021 G 3/5/2019 Quinebaug Solar CNR only PV SUN 0.9 49.9 49.9 Windham CT 12/18/2021 12/11/2021 Killingly to Tunnel 115 kV line (approx 5.5 miles south of Brooklyn Substation) - New Eversource Canterbury switching station. GPS Coordinates: - 71 55’ 27.9” W - 41 44’ 14.21” N CNR N N CT C F
840 11/9/2020 G 3/1/2019 Sanford Airport Solar CNR only PV SUN 0 50 50 York ME 11/7/2020 10/6/2020 CMP's Sanford - Maguire 115 kV line, section 237 CNR N N NA ME C F
839 3/30/2023 G 2/25/2019 Solar PV SUN 20 20 20 Kent RI 3/17/2023 1/20/2023 GRID 3310 Feeder 34.5 kV to Kent County substation NA Y Y NGRID PD RI C N
838 8/14/2020 G 2/25/2019 Solar PV SUN 9.8 9.8 9.8 Kent RI 9/30/2021 9/1/2021 GRID 3310 Feeder 34.5 kV to Kent County substation NA Y Y NGRID PD RI A N
837 7/17/2024 ETU 2/22/2019 Somerset Wind Link - 1200 MW HVDC Line (Controllable) into Brayton Point NA N/A 1200 Bristol MA 12/1/2031 5/1/2030 The proposed point of interconnection is: GRID Brayton PT 345kV N/A Y Y ISO-NE PD RI A F
836 1/11/2022 G 1/31/2019 Solar PV SUN 6.25 6.25 6.25 Cranston RI 3/1/2023 1/1/2023 GRID Feeder 21F1 connected to West Cranston No. 21 substation NA Y Y NGRID RI A N
835 6/9/2020 G 1/22/2019 Solar PV SUN 5 5 5 Norfolk MA 9/3/2021 8/15/2021 GRID 348W7, Pole P53 on Washington St, Franklin NA N N NA SEMA A N
834 5/16/2022 G 1/17/2019 GD 1-9 Iron Mine Solar PV SUN 38.4 38.4 38.4 N. Smithfield RI 5/13/2022 12/30/2021 GRID 115 kV H17 Line (via 34.5 kV feeders from new 115/34.5 kV station) NA Y Y NGRID PD RI C N
833 10/26/2023 G 1/9/2019 Three Rivers Solar PV SUN 100 100 100 Hancock ME 12/31/2026 12/3/2025 New 115 kV breaker Ring bus, tapping 115 kV Line 93 (Emera Maine) between Bull Hill & Deblois NR Y Y ISO-NE PD BHE A F
832 9/5/2019 G 1/4/2019 Battery Storage OT BAT 150 150 150 Plymouth MA 12/1/2021 11/1/2021 9/5/2019 National Grid East Bridgewater 115kV substation, Lat: 42.023890°, Long: -70.966356° CNR N N PD SEMA W F
831 3/16/2021 G 12/21/2018 Battery Storage OT BAT 200 200 200 Windham CT 5/1/2024 4/1/2024 3/16/2021 Eversource Killingly 345kV substation, Lat: 41.881266°, Long: -71.891253° CNR Y Y ISO-NE PD CT W F
830 5/24/2022 G 12/19/2018 Offshore Wind WT WND 860 860 860 NA MA 7/1/2025 4/1/2025 5/24/2022 NSTAR Electric Company West Barnstable 345 kV. CNR N N PD SEMA W F
829 5/24/2022 G 12/19/2018 Offshore Wind WT WND 400 400 400 NA MA 7/2/2025 4/1/2025 5/24/2022 NSTAR Electric Company 345 kV lines 322 and 342 CNR N N PD SEMA W F
828 8/31/2021 ETU 12/14/2018 ETU for simultaneous delivery of specific Queued projects NA N/A NA MA 5/31/2025 3/31/2025 8/26/2021 N/A N/A N N PD SEMA W F
827 10/27/2021 G 12/14/2018 Westminster - NG Western MA Area Cluster Study PV SUN 4.875 4.875 4.875 Worcester MA 6/7/2021 6/7/2021 NG Westminster NA Y Y PD WMA C N
826 10/27/2021 G 12/14/2018 Wendell Depot Substation - NG Western MA Area Cluster Study PV SUN 14.97 14.97 14.97 Franklin MA 10/16/2021 6/1/2021 NG Wendell Depot Substation NA Y Y NGRID PD WMA C N
825 5/3/2019 G 12/14/2018 Webster St - NG Western MA Area Cluster Study PV SUN 9 9 9 Worcester MA 8/1/2020 8/1/2020 3/15/2019 NG Webster St NA N N PD WMA W N
824 10/27/2021 G 12/14/2018 Ware Substation - NG Western MA Area Cluster Study PV SUN 13.272 13.272 13.272 Hampshire MA 12/31/2023 7/8/2021 NG Ware Substation NA Y Y NGRID PD WMA A N
823 10/27/2021 G 12/14/2018 Thorndike Substation - NG Western MA Area Cluster Study PV SUN 12.448 12.448 12.448 Hampden MA 12/31/2023 10/1/2019 NG Thorndike Substation NA Y Y NGRID PD WMA A N
822 10/27/2021 G 12/14/2018 Royalston - NG Western MA Area Cluster Study PV SUN 2.5 2.5 2.5 Worcester MA 4/26/2022 4/26/2022 10/20/2021 NG Royalston NA Y Y NGRID PD WMA W N
821 10/27/2021 G 12/14/2000 Pondville - NG Western MA Area Cluster Study PV SUN 4.875 4.875 4.875 Worcester MA 5/22/2022 5/22/2022 NG Pondville NA N N PD WMA A N
820 10/27/2021 G 12/14/2018 Palmer Substation - NG Western MA Area Cluster Study PV SUN 18.095 18.095 18.095 Hampden MA 1/20/2022 2/28/2019 NG Palmer Substation NA Y Y NGRID PD WMA A N
819 10/27/2021 G 12/14/2018 N. Oxford Substation - NG Western MA Area Cluster Study PV SUN 8.7 8.7 8.7 Worcester MA 12/30/2020 1/31/2020 NG N. Oxford Substation NA Y Y NGRID PD WMA C N
818 10/27/2021 G 12/14/2018 Meadow Street 552 Substation - NG Western MA Area Cluster Study PV SUN 13.38 13.38 13.38 Worcester MA 11/8/2022 6/20/2020 NG Meadow Street 552 Substation NA Y Y NGRID PD WMA A N
817 10/27/2021 G 12/14/2018 Little Rest Rd Substation - NG Western MA Area Cluster Study PV SUN 6 6 6 Worcester MA 8/20/2022 8/14/2020 NG Little Rest Rd Substation NA Y Y NGRID PD WMA A N
816 10/27/2021 G 12/14/2018 Leicester - NG Western MA Area Cluster Study PV SUN 2.592 2.592 2.592 Worcester MA 5/31/2021 5/31/2021 NG Lecester NA N N PD WMA C N
815 10/27/2021 G 12/14/2018 Lashaway Substation - NG Western MA Area Cluster Study PV SUN 13.675 13.675 13.675 Worcester MA 4/15/2022 7/20/2020 NG Lashaway Substation NA Y Y NGRID PD WMA A N
814 10/27/2021 G 12/14/2018 Five Corners Substation - NG Western MA Area Cluster Study PV SUN 3 3 3 Hampshire MA 7/29/2021 7/29/2021 NG Five Corners Substation NA Y Y NGRID PD WMA C N
813 10/27/2021 G 12/14/2018 E. Winchendon Substation - NG Western MA Area Cluster Study PV SUN 3.9 3.9 3.9 Worcester MA 6/26/2022 6/26/2022 NG E. Winchendon Substation NA Y Y NGRID PD WMA A N
812 10/27/2021 G 12/14/2018 E. Westminster Substation - NG Western MA Area Cluster Study PV SUN 7.98 7.98 7.98 Worcester MA 8/1/2022 3/28/2021 NG E. Westminster Substation NA Y Y NGRID PD WMA A N
811 10/27/2021 G 12/14/2018 Crystal Lake Substation - NG Western MA Area Cluster Study PV SUN 24.73 24.73 24.73 Worcester MA 12/31/2020 4/19/2019 NG Crystal Lake Substation NA Y Y NGRID PD WMA C N
810 10/27/2021 G 12/14/2018 Chestnut Hill 702 Substation - NG Western MA Area Cluster Study PV SUN 3.276 3.276 3.276 Worcester MA 3/5/2020 3/5/2020 NG Chestnut Hill 702 Substation NA Y Y NGRID PD WMA C N
809 10/27/2021 G 12/14/2018 Belchertown Substation - NG Western MA Area Cluster Study PV SUN 8 8 8 Hampden MA 8/8/2021 6/21/2021 NG Belchertown Substation NA Y Y NGRID PD WMA C N
808 10/27/2021 G 12/14/2018 Barre substation - NG Western MA Area Cluster Study PV SUN 12.398 12.398 12.398 Worcester MA 12/30/2022 4/20/2021 NG Barre substation NA Y Y NGRID PD WMA A N
807 7/13/2022 G 12/13/2018 FPS Panton Solar PV SUN 50 50 50 Addison VT 5/31/2026 5/1/2026 Vergennes 115 kV Substation NR Y Y ISO-NE PD VT A F
806 10/2/2024 G 12/12/2018 Offshore Wind WT WND 827 827 827 NA MA 10/15/2025 8/15/2025 Eversource 345 kV West Barnstable Substation CNR Y Y ISO-NE PD SEMA CSIS A F
805 10/24/2024 G 12/10/2018 Solar PV SUN 10.99 10.99 10.99 Middletown RI 11/14/2024 11/7/2024 GRID Jepson 37K33 NA Y Y NGRID PD RI A N
804 2/4/2019 G 12/10/2018 Solar PV SUN 5 5 5 Windham CT 7/1/2020 7/1/2020 2/4/2019 Eversource, 23kV, Line 14MX29, POI is ~3.6 miles from Tracy Substation, POI Lat/Long = 41.907528, -71.914968 CNR N N CT W F
803 8/4/2021 G 12/6/2018 Solar PV SUN 50 50 50 York ME 7/1/2021 6/1/2021 8/4/2021 Tap CMP existing 115 kV line section 225 approximately 2.25 miles from Sanford 115 kV Substation CNR Y N ISO-NE PD ME W F
802 8/6/2019 G 12/4/2018 Generator Increase ST MSW 2.08 15.6 15.6 Hartford CT 9/3/2019 9/3/2019 8/6/2019 Connecticut Light and Powers 13.8 kv Forestville 12A Substation CNR Y N ISO-NE CT W F
801 2/15/2019 G 11/30/2018 Solar PV SUN 14 14 14 Cheshire NH 4/1/2022 3/1/2022 2/15/2019 Eversource 34.5 kV distribution circuit #3178, near pole 2/97 on Brattleboro Rd (Rt 119) in Hinsdale, NH Chestnut Hill SS, approx. 3.8 miles away) NR N N PD NH W F
800 2/14/2019 G 11/30/2018 Solar PV SUN 19.8 19.8 19.8 Somerset ME 4/1/2022 3/1/2022 2/13/2019 CMP 34.5 kV express feeder at project site (Approx. 2.12 mile feeder originating from CMP North Anson substation) NR N N PD ME W F
799 3/15/2021 G 11/16/2018 Solar PV SUN 10 10 10 Sullivan NH 11/1/2021 10/1/2021 3/5/2021 Primary POI - PSNH 46 kV River Road substation; Alternate POI - GMP 46 kV Line 102 CNR Y N ISO-NE PD NH W F
798 8/2/2019 G 11/8/2018 Solar PV SUN 15 15 15 Androscoggin ME 11/1/2021 10/1/2021 8/2/2019 Interconnecting to existing CMP 34.5 kV Sabattus substation CNR N N PD ME W F
797 6/9/2020 G 11/5/2018 Solar PV SUN 8.125 8.125 8.125 Worcester MA 12/30/2020 12/1/2020 GRID P7 and P8 McCormick Rd/Meadow St 552L5 (Spencer, MA) NA Y Y NGRID PD WMA A N
796 12/6/2018 G 10/26/2018 Solar PV SUN 50 50 50 Hartford CT 11/1/2022 10/15/2022 12/6/2018 Tap of existing 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks CNR N N CT W F
795 6/15/2022 G 10/26/2018 Solar (QF) PV SUN 56.496 56.496 56.496 North Kingstown RI 6/1/2021 5/15/2021 4/4/2022 GRID L-190 line via new station NA Y Y NGRID PD RI W N
794 10/24/2024 G 10/26/2018 Solar (QF) PV SUN 10 10 10 North Kingstown RI 11/27/2024 11/13/2024 GRID L-190 line via new station NA Y Y NGRID PD RI A N
793 9/20/2024 G 10/26/2018 Solar (QF) PV SUN 40 40 40 North Kingstown RI 10/22/2024 9/29/2023 GRID L-190 line via new station NA Y Y NGRID PD RI A N
792 1/13/2022 G 10/19/2018 Offshore Wind WT WND 805 805 805 NA CT 5/31/2023 4/1/2023 1/13/2022 Eversource (CL&P) 345kV Montville, alternatively Eversource (CL&P) 345kV Millstone CNR Y Y ISO-NE PD CT W F
791 3/6/2020 G 10/19/2018 Offshore Wind WT WND 805 805 805 NA CT 5/31/2023 4/1/2023 3/5/2020 Eversource (CL&P) 345kV Montville, alternatively Eversource (CL&P) 345kV Millstone CNR N N PD CT W F
790 2/13/2019 G 10/11/2018 Solar PV SUN 15 15 15 Coos NH 7/1/2020 7/1/2020 2/13/2019 Eversource, 115kV, Line X178-3, POI ~2.2 miles from Whitefield Substation, POI Lat/Long = 44.368066, -71.640429 CNR N N PD NH W F
789 5/19/2020 G 9/28/2018 CHP GT NG 6.268 6.268 9.091 Newport RI 6/30/2021 6/1/2021 GRID 13.8 kV supplied by 69/13.8 KV Navy Substion in RI NA Y Y NGRID PD RI A N
788 9/9/2022 G 9/28/2018 Solar PV SUN 19.9 19.9 19.9 New London CT 12/31/2023 7/31/2023 9/9/2022 Primary POI - Eversource Montville Plant 69 kV switchyard via new breaker position. Alternate POI - New 34.5 kV breaker position at Mohegan Tribal Utility Authority (MTUA) Fort Hill Substation. NR Y Y ISO-NE CT W F
787 11/27/2024 G 9/26/2018 Black Hill Point Energy Center PV SUN 19.9 19.9 19.9 Windham CT 9/25/2025 7/31/2025 11/27/2024 New 3 breaker ring bus switching station on Eversource (CL&P) Killingly to Tunnel 115 kV line L-1607. NR Y Y ISO-NE PD CT W F
786 11/27/2024 G 9/26/2018 Keay Brook Energy Solar PV SUN 19.9 19.9 19.9 York ME 9/25/2025 7/31/2025 11/27/2024 Tap of CMP 34.5 kV Section 185 A TA approximately 3.5 miles north of Lebanon substation NR Y Y ISO-NE PD ME W F
785 11/27/2024 G 9/26/2018 Tilton Heights Energy Center PV SUN 19.9 19.9 19.9 Belknap NH 9/25/2025 7/31/2025 11/27/2024 POI at Eversource 34.5 kV circuit #3216 (sourced from Webster SS) near pole #3798/1. NR Y Y ISO-NE PD NH W F
784 4/13/2020 G 9/18/2018 CPV Towantic incremental CC DFO NG 45 845.5 876.5 New Haven CT 3/1/2020 3/1/2020 Eversource 115 KV lines 1575, 1585 and 1990 CNR Y Y ISO-NE SWCT C F
783 4/17/2019 ETU 9/18/2018 controllable 150 kV HVDC Tie - Import Only NA N/A 400 Addison VT 12/31/2023 10/31/2023 4/17/2019 a new ~60-mile, 400 MW, ±150 kV, VSC-controlled HVDC transmission line originating from New York Power Authority’s (NYPA) Plattsburgh 230 kV Substation in Plattsburgh, NY and terminating at VELCO’s 345 kV Substation at New Haven, Vermont. The project will deliver a maximum of 400 MW from New York to New England. VGL is an elective transmission upgrade project that will begin in Clinton County, NY, and terminate in Addison County, VT. CNI N N PD VT W F
782 9/27/2019 G 9/13/2018 Offshore Wind WT WND 352 352 352 NA RI 12/1/2024 4/30/2024 9/27/2019 NG 115 kV Kent County substation, RI or alternatively NG 345 kV Kent County Substation, RI CNR N N PD RI W F
781 4/27/2022 G 9/13/2018 Revoultion Offshore wind WT WND 704 704 704 NA RI 9/7/2025 7/1/2025 NG 115 kV Davisville substation, Washington County NR Y Y ISO-NE PD RI A F
780 10/4/2021 G 9/11/2018 Combined Reciprocating, Solar and Battery modification OT NG SUN BAT 0 7.81 7.81 Middlesex MA 5/31/2022 5/1/2022 GRID Hendersonville 593 substation (593W1 and 593W4) NA Y Y NGRID PD BOST A N
779 9/17/2021 G 9/4/2018 Solar with Battery OT SUN BAT 9.98 9.98 9.98 Worcester MA 8/3/2021 3/31/2021 GRID Circuit 320W1, Pole 9, Puddon Street, Northbridge NA Y Y NGRID PD WMA C N
778 12/23/2021 G 8/31/2018 Kearsarge Solar with battery OT SUN BAT 5.4 5.4 5.4 Norfolk MA 12/21/2021 12/6/2021 GRID circuit 335W1, Pole 11 on Williams Way, Bellingham NA Y Y NGRID PD SEMA C N
777 5/3/2019 G 8/29/2018 Solar PV SUN 30 40 40 North Kingstown RI 8/1/2020 8/1/2020 10/17/2019 GRID L-190 line NA N N PD SEMA W N
776 10/22/2018 G 8/29/2018 Solar PV SUN 10 10 10 North Kingstown RI 10/1/2019 10/1/2019 10/17/2018 GRID 84T3 feeder to Davisville Substation NA N N SEMA W N
775 8/21/2020 G 8/20/2018 Solar PV SUN 20 20 20 Kennebec ME 11/1/2021 10/15/2021 8/21/2020 CMP Albion to Detroit 115 kV line approximately 2.5 miles from Albion NR N N PD ME W F
774 11/10/2020 G 8/13/2018 Solar PV SUN 8 8 8 Washington RI 7/15/2021 7/1/2021 GRID 85T1 Woodville Road NA Y Y NGRID SEMA A N
773 6/16/2020 G 8/13/2018 Solar PV SUN 4.95 4.95 4.95 Plymouth MA 12/18/2019 12/1/2019 GRID Circuit 912W75 River Street NA Y Y NGRID SEMA C N
772 6/6/2019 G 8/7/2018 Combined Reciprocating, Solar and Battery OT NG SUN BAT 7.81 7.81 7.81 Middlesex MA 6/3/2019 5/1/2019 GRID Norman Street D substation (8W1) NA Y Y NGRID BOST C N
771 8/28/2018 G 7/26/2018 Battery Storage OT BAT 19.01 19.01 19.01 Penobscot ME 6/1/2019 5/1/2019 8/28/2018 Lincoln (Maine) - 46 kv - bus #103039 CNR N N PD BHE W F
770 7/27/2018 G 6/20/2018 Solar PV SUN 10 10 10 Rockingham NH 6/1/2019 5/31/2019 7/27/2018 Eversource 34.5 kV feeder (3184 circuit), Mammoth Rd substation NA N N NH W N
769 8/21/2018 G 6/13/2018 Wind WT WND 7.5 7.5 7.5 Berkshire MA 3/1/2020 2/1/2020 8/21/2018 Eversource 23 kV Feeder Berkshire Substation NA N N WMA W N
768 9/30/2019 G 6/13/2018 Solar with battery addition OT SUN BAT 1.32 6.138 6.138 Hampshire MA 9/3/2019 6/1/2019 Eversource Tillson Substation NA Y Y WMA C N
767 6/3/2019 G 6/13/2018 Solar PV SUN 20 20 20 Fairfield ME 11/30/2020 9/14/2020 6/3/2019 Tap point on 34.5kV CMP Section 9 approximately 2.2mi west of Shawmut Hydro S/S in the direction of Skowhegan South Side S/S. CNR N N PD ME W F
766 4/29/2024 G 5/22/2018 Solar PV SUN 5.2 5.2 5.2 Washington RI 11/24/2024 11/15/2024 GRID 68F1 feeder (Richmond, RI) NA Y Y NGRID RI A N
765 1/25/2021 G 5/9/2018 Solar PV SUN 10 10 10 Providence RI 7/15/2021 6/30/2021 1/25/2021 GRID 228 circuit 23 kV feeder (7 Mile Rd, Scituate) NA Y Y NGRID RI W N
764 9/30/2019 G 5/9/2018 Solar PV SUN 10 10 10 Providence RI 9/30/2019 8/30/2019 GRID 2228 circuit 23 kV feeder (Hope Rd, Cranston) NA Y Y NGRID RI C N
763 6/22/2022 G 4/27/2018 Davenport Solar PV SUN 15 15 15 Rutland VT 12/1/2021 11/1/2021 6/14/2022 Florence - S. Middlebury Jct. 46 kV line, approx. 4 miles from Florence NR Y Y ISO-NE VT W F
762 5/21/2018 G 4/27/2018 Solar PV SUN 22.5 22.5 22.5 Rutland VT 8/1/2020 5/15/2020 5/18/2018 POI tap of GMP Florence - S. Middlebury Jct. 46 kV line, approx. 4 miles from Florence. Site is 13 acres on Carver Street/Syndicate Road, Brandon, VT 05733 CNR N N PD VT W F
761 3/26/2020 G 4/27/2018 Storage OT BAT 150 150 150 Middlesex MA 5/31/2021 4/30/2021 3/26/2020 National Grid 115 kV line M139 CNR N N PD BOST W F
760 5/17/2023 G 4/26/2018 Downeast Wind WT WND 126 126 126 Washington ME 12/18/2024 12/2/2024 Primary POI: Emera Maine 115 line 52 near Epping switching station Alternate POI: Epping station NR Y Y ISO-NE PD BHE A F
759 8/12/2022 G 4/26/2018 Wallingford GT Uprate GT NG 0 350 350 New Haven CT 5/31/2022 5/31/2022 WED 115kV Lines 1305 and 1406 CNR N N SWCT C F
758 5/17/2023 G 4/26/2018 Ocean State Power uprate CC DFO NG 73.204 631.2 652.342 Providence RI 11/30/2025 11/30/2025 NGRID 345kV Sherman Road (existing OSP I and II switchyard) CNR Y Y ISO-NE PD RI A F
757 8/12/2020 G 4/26/2018 Solar PV SUN 20 20 20 Somerset ME 11/1/2021 10/15/2021 8/12/2020 Approximately at 44°42'47.78"N, 69°39'15.37"W at proposed interconnection substation to tap CMP Section 83 line and SAPI Somerset generator tap line. Substation to have short gen tie line to project site located between Kendall Annex Road and Middle Road in Fairfield, Maine CNR N N PD ME W F
756 8/12/2020 G 4/26/2018 Solar PV SUN 20 20 20 Kennebec ME 11/1/2021 10/15/2021 8/12/2020 CMP Albion to Detroit 115 kV line approximately 2.5 miles from Albion. CNR N N PD ME W F
755 12/27/2018 G 4/25/2018 Bingham Wind CNR Only WT WND 0 184.8 184.8 Somerset ME 12/13/2016 8/15/2016 CMP 115kV Guilford Substation CNR N N ME C F
754 11/1/2021 G 4/25/2018 Solar PV SUN 30 30 30 Cheshire NH 7/30/2024 6/30/2024 10/31/2021 Primary: NGRID 115 KV Line I-135 between Fitzwilliam Sub and Flagg Pond Sub Alternate 1: NGRID 115 KV Line J-136 between Bellows Falls Sub and Flagg Pond Sub Alternate 2: Eversource 115 KV Bus at Monadnock Substation via short 115 KV gentie line from project site CNR Y Y ISO-NE PD NH W F
753 8/6/2019 G 4/20/2018 Solar PV SUN 20 20 20 Franklin VT 11/1/2021 10/15/2021 8/6/2019 VEC Sheldon Substation - 46 kV CNR N N PD VT W F
752 5/14/2019 G 4/19/2018 Energy Storage OT BAT 102.85 102.85 102.85 Bristol MA 5/2/2022 3/2/2022 5/13/2019 Eversource 115kV Cross Road Substation [both buses at Cross Road Substation (bus/line 111 = primary; bus/line 109 = alternate)] CNR N N PD SEMA W F
751 8/12/2020 G 4/12/2018 Solar PV SUN 20 20 20 Orange VT 11/1/2021 10/15/2021 8/12/2020 GMP's Randolph Center substation 46 kV CNR Y Y ISO-NE VT W F
750 8/6/2019 G 4/12/2018 Solar PV SUN 20 20 20 Franklin VT 11/1/2021 10/15/2021 8/6/2019 VEC's Highgate - Enosburg 46 kV line, 700 feet from Highgate CNR N N VT W F
749 8/28/2019 G 4/12/2018 Solar PV SUN 150 150 150 Franklin ME 10/31/2021 8/1/2021 8/27/2019 CMP Larrabee Road 345 kV CNR N N PD ME W F
748 8/28/2019 G 4/12/2018 Battery storage addition (see Q746) OT WND BAT 24.3 238.6 238.6 Franklin ME 10/31/2021 8/1/2021 8/27/2019 CMP Larrabee Road Station 345 kV CNR N N PD ME W F
747 8/28/2019 G 4/12/2018 Battery storage addition (see Q745) OT WND BAT 24.4 265.6 265.6 Franklin ME 10/31/2021 8/1/2021 8/27/2019 CMP Larrabee Road Station,345 kV CNR N N PD ME W F
746 8/28/2019 G 4/12/2018 Wind WT WND 214.3 214.3 214.3 Franklin ME 12/15/2021 10/29/2021 8/27/2019 CMP Larrabee Road Station 345 kV CNR N N PD ME W F
745 8/28/2019 G 4/12/2018 Wind WT WND 241.2 241.2 241.2 Franklin ME 10/29/2021 8/1/2021 8/27/2019 CMP Larrabee Road Station 345 kV CNR N N PD ME W F
744 2/7/2019 G 4/12/2018 Wind WT WND 150 150 150 Franklin ME 12/1/2022 9/1/2022 2/7/2019 Approximate location of the proposed Point of Interconnection is the CMP Avangrid Larrabee Road 345 kV Substation CNR N N PD ME W F
743 2/7/2019 ETU 4/12/2018 noncontrollable ETU from Quebec to ME NA N/A 450 Franklin ME 12/1/2022 9/1/2022 2/7/2019 CMP/Avangrid 345 kV Larabee Road N/A N N PD ME W F
742 12/1/2020 ETU 4/12/2018 Internal noncontrollable ETU to Larabee Road - increase (see Q740 and Q741) NA N/A 540 Lewiston ME 12/31/2021 11/30/2021 11/29/2020 Larrabee Road 345 kV Substation in Lewiston, Androscoggin county Maine 04240. N/A N N PD ME W F
741 12/1/2020 ETU 4/12/2018 Internal noncontrollable ETU to Larabee Road - increase (see Q740) NA N/A 200 Lewiston ME 12/31/2021 11/30/2021 11/29/2020 Larrabee Road 345 kV Substation in Lewiston, Androscoggin county Maine 04240. N/A N N PD ME W F
740 12/1/2020 ETU 4/12/2018 Internal noncontrollable ETU to Larabee Road NA N/A 460 Lewiston ME 12/31/2021 11/30/2021 11/29/2020 Larrabee Road 345 kV Substation in Lewiston, Androscoggin county Maine 04240 N/A N N PD ME W F
739 1/17/2019 G 4/12/2018 Wind WT WND 89.7 89.7 89.7 Somerset ME 1/30/2020 1/15/2020 1/16/2019 CMP Section 3023 345kV line (via Johnson Mountain Substation) CNR N N PD ME W F
738 12/1/2020 ETU 4/12/2018 Internal noncontrollable ETU - interface upgrade NA N/A 400 Cumberland ME 11/30/2019 10/31/2019 11/30/2020 N/A N/A N N PD ME W F
737 2/7/2019 ETU 4/12/2018 Internal noncontrollable ETU from NMISA to Pittsfield ME NA N/A 1200 Somerset and Penobscot ME 12/31/2021 11/30/2021 2/7/2019 Emera Keene Rd substation and CMP Section 3023 345 kV Line N/A N N PD ME W F
736 2/7/2019 ETU 4/12/2018 Internal noncontrollable ETU to Pittsfield ME NA N/A 550 Somerset ME 12/31/2021 11/30/2021 2/7/2019 CMP Section 3023 345 kV N/A N N PD ME W F
735 2/7/2019 G 4/12/2018 Wind WT WND 600.6 600.599 600.599 Aroostook ME 12/1/2021 11/1/2021 2/7/2019 Primary: Orrington Substations 345kV with two alternatives: Keene Rd. Substation 345kV and the Orrington-Albion Rd 345kV line NR N N PD BHE W F
734 2/7/2019 G 4/12/2018 Wind WT WND 600.6 600.5999 600.5999 Aroostook ME 12/1/2021 11/1/2021 2/7/2019 Primary: Orrington Substations 345kV with two alternatives: Keene Rd. Substation 345kV and the Orrington-Albion Rd 345kV line NR N N PD BHE W F
733 12/1/2020 G 4/12/2018 Wind WT WND 103.5 103.5 103.5 Aroostook ME 11/20/2022 9/3/2022 12/1/2020 PITTSFIELD 345KV on line 3023 CNR N N PD BHE W F
732 12/1/2020 G 4/12/2018 Wind WT WND 103.5 103.5 103.5 Aroostook ME 11/20/2022 9/3/2022 12/1/2020 PITTSFIELD 345KV on line 3023 CNR N N PD BHE W F
731 12/1/2020 G 4/12/2018 Wind WT WND 103.5 103.5 103.5 Aroostook ME 11/20/2022 9/3/2022 12/1/2020 PITTSFIELD 345KV on line 3023 CNR N N PD BHE W F
730 12/1/2020 G 4/12/2018 Wind WT WND 103.5 103.5 103.5 Aroostook ME 11/20/2022 9/3/2022 12/1/2020 PITTSFIELD 345KV on line 3023 CNR N N PD BHE W F
729 12/1/2020 G 4/12/2018 Wind WT WND 103.5 103.5 103.5 Aroostook ME 11/20/2022 9/3/2022 12/1/2020 PITTSFIELD 345KV on line 3023 CNR N N PD BHE W F
728 6/28/2019 G 4/2/2018 Vernon Station Incremental Capacity Increase HD WAT 2.9 34.9 34.9 Windham VT 3/31/2019 3/31/2019 (Same as Existing POI Vernon Substation No.13 69 KV Bus) Street Address: 152 Governor Hunt Road CNR N N VT C F
727 10/26/2022 G 3/28/2018 Chariot Solar PV SUN 49.5 49.5 49.5 Cheshire NH 12/15/2024 11/15/2024 NGrid 115 kV Vernon Road tap to Vernon Road Substation, 2.5 mi from Vernon Road Substation NR Y Y ISO-NE PD VT A F
726 11/7/2022 G 3/21/2018 Cranberry Point Energy Storage OT BAT 150 150 150 Plymouth MA 5/30/2025 3/14/2025 Carver 115 kV Primary POI – Loop-in station with 3-breaker ring bus interconnecting to line 127 located just south of Carver substation Alternate POI – Expand the existing station to add a 4th bay with 2 breakers to interconnect the project. CNR Y Y ISO-NE PD SEMA A F
725 1/21/2021 G 3/20/2018 Wallingford Solar PV SUN 14.97 14.97 14.97 New Haven CT 12/18/2020 10/30/2020 WED Wallingford 13.8 KV substation NA Y Y ISO-NE SWCT C N
724 8/31/2023 G 3/7/2018 NTE Connecticut CC DFO NG 672 671 692 Windham CT 2/28/2025 11/15/2024 7/12/2023 Lake Road 345 kV CNR Y Y ISO-NE CT W F
723 5/6/2019 G 3/1/2018 Battery Storage OT BAT 142.8 142.8 142.8 Barnstable MA 5/31/2021 4/30/2021 3/27/2019 Primary POI: Eversource 115 kV W. Barnstable Alternative POI 1: Eversource 115 kV Barnstable Alternative POI 2: New Eversource W. Barnstable – Bourne 115 kV line (RSP #1725) tapped at 51% (7.2 miles) from W. Barnstable substation CNR N N PD SEMA W F
722 4/25/2018 G 2/21/2018 Solar PV SUN 24.6 24.6 24.6 Hartford CT 1/1/2020 12/31/2019 4/25/2018 Eversource North Simsbury NA N N CT W N
721 4/25/2018 G 2/21/2018 Solar PV SUN 26.4 26.4 26.4 Hartford CT 1/1/2020 12/31/2019 4/25/2018 Eversource North Simsbury NA N N CT W N
720 10/3/2022 G 2/21/2018 Solar PV SUN 15 15 15 New London CT 10/1/2022 8/29/2022 Eversource Shunock 32P NA Y Y NU CT C N
719 4/25/2018 G 2/21/2018 Solar PV SUN 19.92 19.92 19.92 Hartford CT 1/1/2021 12/31/2020 4/25/2018 Eversource Barber Hill 23J NA N N CT W N
718 3/5/2018 G 2/21/2018 Solar PV SUN 6 6 6 New London CT 4/2/2019 4/1/2019 3/2/2018 Eversource 13B25 Feeder NA N N CT W N
717 5/26/2022 G 2/21/2018 Battery Storage OT BAT 20 20 20 Hartford CT 2/1/2022 12/1/2021 5/26/2022 Eversource North Bloomfield 2A NA N N CT W N
716 9/19/2023 G 2/21/2018 Solar PV SUN 17.73 17.73 17.73 New London CT 8/18/2023 4/26/2023 Eversource Waterford 36F2 NA Y Y NU CT C N
715 10/3/2018 G 2/21/2018 Fusion Solar Center PV SUN 20 20 20 New London CT 4/18/2018 4/12/2018 Eversource Tunnel 12S NA Y Y NU CT C N
714 3/9/2023 G 2/21/2018 Solar PV SUN 20 20 20 Windham CT 6/1/2023 3/1/2023 3/9/2023 Eversource Frybrook 13B NA Y Y NU CT W N
713 12/17/2019 G 2/21/2018 Solar PV SUN 26.4 26.4 26.4 Hartford CT 12/10/2019 10/1/2019 Eversource North Simsbury NA Y Y NU CT C N
712 2/15/2023 G 2/21/2018 Solar PV SUN 20 20 20 Windham CT 6/30/2025 6/15/2025 2/15/2023 Eversource Frybrook 13B NA Y Y NU CT W N
711 4/10/2024 G 2/21/2018 Solar PV SUN 9.99 9.99 9.99 New London CT 3/30/2024 2/29/2024 Eversource Shunock 32P NA Y Y NU CT C N
710 9/24/2024 G 2/21/2018 Solar PV SUN 19.8 19.8 19.8 Litchfield CT 12/6/2024 11/13/2024 Eversource 14R31 Feeder NA Y Y NU CT A N
709 10/8/2020 G 2/21/2018 Fuel Cell FC FC 14.8 14.8 14.8 Hartford CT 1/1/2021 12/31/2020 10/1/2020 Eversource 12A Forestville NA N N CT W N
708 5/10/2024 G 2/21/2018 Solar PV SUN 20 20 20 Litchfield CT 2/1/2024 12/1/2023 5/10/2024 Eversource Rocky river 12Y NA Y Y NU CT W N
707 4/3/2019 G 2/21/2018 Solar PV SUN 7.5 7.5 7.5 Windham CT 4/1/2019 3/31/2019 4/3/2019 Eversource 11F10 Feeder NA N N CT W N
706 2/4/2020 G 2/21/2018 Beacon Falls Energy Park CNR only FC FC 0 62.9 62.9 New Haven CT 4/1/2022 2/1/2022 1/30/2020 Eversource, Beacon Falls Substation, 180 Cold Spring Rd, Beacon Falls, Junction of the 115 kV lines 1570-1 and 1319 CNR N N CT W F
705 11/26/2019 G 1/26/2018 Combined Cycle CNR CC NG 0 1030 1080 Providence RI 5/31/2023 2/1/2023 11/26/2019 Sherman Road 345kV substation CNR N N RI W F
704 10/8/2020 G 1/24/2018 Solar PV SUN 1.904 1.904 1.904 Bristol MA 2/21/2020 2/21/2020 NSTAR Wing Lane Substation, #1 bank NA N N SEMA C N
703 1/10/2020 G 1/24/2018 Solar PV SUN 6.75 6.75 6.75 Plymouth MA 4/23/2019 4/15/2019 NSTAR Crystal Spring Substation 13.2 kV bus NA Y Y NSTAR SEMA C N
702 7/11/2019 G 1/24/2018 Solar PV SUN 9.5 9.5 9.5 Plymouth MA 7/10/2019 6/28/2019 NSTAR Wareham Substation 23 kV bus NA Y Y NSTAR SEMA C N
701 2/14/2019 G 12/15/2017 Offshore Wind WT WND 400 400 400 NA MA 12/1/2023 8/1/2023 2/14/2019 Brayton Point Substation in the Town of Somerset, Massachusetts or alternatively at Davisville Substation in the Town of North Kingstown, Rhode Island CNR N N PD RI W F
700 9/16/2022 G 12/15/2017 Park City Offshore Wind WT WND 791 791 791 NA MA 12/31/2029 5/1/2029 Eversource 345 kV West Barnstable Substation NR Y Y ISO-NE PD SEMA A F
699 2/14/2019 G 12/13/2017 Offshore Wind with battery addition OT WND BAT 75 875 875 NA MA 5/31/2023 4/30/2022 2/14/2019 National Grid 345 kV Brayton Point Substation, Somerset, MA CNR N N RI W F
698 3/6/2020 G 12/7/2017 Solar PV SUN 8.04 8.04 8.04 Worcester MA 2/5/2020 2/3/2020 GRID 13.8 kV 612W3 Feeder (Pole 53) NA Y Y NGRID PD CMA C N
697 3/6/2020 G 12/7/2017 Solar PV SUN 5.97 5.97 5.97 Worcester MA 2/5/2020 2/3/2020 GRID 13.8 kV 612W1 Feeder (Pole 53) NA Y Y NGRID PD CMA C N
696 4/22/2019 G 11/27/2017 Johnston Landfill Wind WT WND 21 21 21 Providence RI 12/20/2018 12/10/2018 GRID Johnston substation, Circuit 2227 NA Y Y NGRID NA RI C N
695 8/14/2020 G 11/20/2017 Solar PV SUN 6.12 6.12 6.12 Washington RI 9/1/2020 5/1/2020 8/14/2020 GRID circuit 88F3 NA Y Y NGRID NA RI W N
694 8/14/2020 G 11/20/2017 Solar PV SUN 7 7 7 Washington RI 9/1/2020 5/1/2020 8/14/2020 GRID circuit 88F3 NA Y Y NGRID NA RI W N
693 7/9/2020 G 11/20/2017 Alton Solar PV SUN 13.875 13.875 13.875 Washington RI 4/30/2020 4/24/2020 Grid 85T3 circuit NA Y Y NGRID NA RI C N
692 5/24/2019 G 11/20/2017 Solar PV SUN 16.25 16.25 16.25 Providence RI 5/24/2019 5/22/2019 GRID 23 kV 2228 circuit/Grid 12.47 kV 21F1 circuit NA Y Y NGRID NA RI C N
691 11/10/2020 G 11/20/2017 University Solar PV SUN 31.34 31.34 31.34 Kent RI 9/15/2020 5/7/2020 GRID 3311 circuit in West Greenwich NA Y Y NGRID NA RI C N
690 2/9/2018 G 11/21/2017 Energy Storage OT BAT 100 100 100 Bristol MA 12/31/2021 9/1/2021 2/9/2018 Wing Lane 624 Eversource Energy 115KV CNR N N PD SEMA W F
689 2/16/2020 G 11/21/2017 Energy Storage OT BAT 100 100 100 Middlesex MA 5/31/2023 2/1/2023 2/14/2020 Wakefield 115 kV Substation Bus (Bus #114433) CNR Y N ISO-NE PD BOST W F
688 6/9/2020 G 11/21/2017 Energy Storage OT BAT 50 50 50 Worcester MA 12/31/2021 9/1/2021 2/9/2018 Little Rest Road 516 New England Power Co 115KV CNR N N NA CMA W F
687 2/6/2019 G 11/21/2017 Energy Storage OT BAT 150 150 150 Barnstable MA 12/31/2021 9/9/2021 2/6/2019 Falmouth 533 Eversource Energy 115KV CNR N N PD SEMA W F
686 3/12/2020 G 10/24/2017 Solar PV SUN 19.98 19.98 19.98 Berkshire MA 12/15/2021 9/15/2021 3/12/2020 National Grid 115kV line F132-2 CNR Y Y ISO-NE WMA W F
685 11/26/2019 G 10/20/2017 Solar PV SUN 20 20 20 Coos NH 7/1/2022 6/1/2022 11/26/2019 34.5 kV Express Feeder to Berlin substation CNR N N NH W F
684 5/14/2019 G 10/20/2017 Solar PV SUN 20 20 20 Grafton NH 7/1/2020 6/1/2020 5/10/2019 34.5 kV bus at Eversource NH Beebe Substation CNR N N PD NH W F
683 5/21/2019 G 10/20/2017 Solar PV SUN 20 20 20 Grafton NH 7/1/2020 6/1/2020 5/21/2019 34.5 kV bus at Eversource NH Beebe Substation CNR N N PD NH W F
682 7/25/2018 G 9/18/2017 solar with battery OT SUN BAT 20.005 20 20 Worcester MA 12/1/2020 11/17/2020 7/24/2018 National Grid 13.8kV circuit (E.-Winchendon Substation) on Winchendon Road (near Depot Road), Winchendon, MA CNR N N CMA W F
681 1/26/2021 G 8/3/2017 Solar PV SUN 20 20 20 Grafton NH 7/1/2022 6/1/2022 1/26/2021 Eversource 34.5 kV between Thornton and Beebe River CNR Y Y ISO-NE NA NH W F
680 5/20/2021 G 8/3/2017 Fair Haven Solar PV SUN 20 20 20 Rutland VT 1/1/2026 12/1/2025 GMP 46 kV between Carver Falls and Fair Haven Tap NR Y Y ISO-NE NA VT A F
679 1/26/2021 G 8/3/2017 Solar PV SUN 20 20 20 Hillsborough NH 7/1/2022 6/1/2022 1/26/2021 Eversource NH 34.5 kV line 313, between South Peterborough and Monadnock substations. The Project will tap this line at about 0.1-0.5 miles south of the South Peterborough substation. CNR Y Y ISO-NE NA VT W F
678 10/25/2017 G 8/3/2017 Solar PV SUN 20 20 20 Grafton NH 7/1/2019 6/1/2019 10/24/2017 Eversource 34.5 kV Beebe River substation CNR N N NH W F
677 10/25/2017 G 8/3/2017 Solar PV SUN 20 20 20 Grafton NH 7/1/2019 6/1/2019 10/24/2017 Eversource 34.5 kV Beebe River Substation CNR N N NH W F
676 10/5/2021 G 8/3/2017 Claremont Solar PV SUN 20 20 20 Sullivan NH 7/1/2023 6/1/2023 10/5/2021 GMP 46 kV line 107 between High Bridge and Windsor NR Y Y ISO-NE NA NH W F
675 12/7/2017 G 7/28/2017 Solar PV SUN 22 22 22 New London CT 12/31/2019 11/1/2019 9/27/2017 Eversource Bean Hill - Tunnel 115 kV CNR N N CT W F
674 5/20/2021 G 7/28/2017 Shaftsbury Solar PV SUN 20 20 20 Bennington VT 1/1/2026 12/1/2025 GMP 46 kV between East Arlington and S. Shaftsbury Tap NR Y Y ISO-NE NA VT A F
673 11/27/2017 G 7/26/2017 wind WT WND 20 20 20 Franklin VT 12/31/2020 10/1/2020 11/27/2017 Green Mountain Power 34.5kV TL 137 Line between North St. Albans and Sheldon Springs Substations along State Route 105 in Swanton Vermont (approximately at pole 44) CNR N N VT W F
672 10/22/2019 G 7/26/2017 Wind WT WND 630 630 630 Aroostook ME 12/31/2022 11/30/2022 10/22/2019 NSTAR 345 kV K Street substation. CNR N N CD BHE W F
671 10/25/2017 G 7/26/2017 Solar PV SUN 26 26 26 Hartford CT 12/1/2019 10/1/2019 10/25/2017 Interconnection to existing 115 kV transmission line running across the property between Eversources's Barbour Hill Substation and Endfield Substation. CNR N N CT W F
670 7/26/2024 G 7/25/2017 Three Corners Solar PV SUN 110 113.4 113.4 Somerset ME 7/27/2024 7/26/2024 CMP Albion Rd 115kV substation CNR Y Y ISO-NE PD ME C F
669 2/14/2019 G 7/25/2017 Offshore Wind WT WND 288 288 288 NA MA 12/1/2023 9/1/2023 2/14/2019 115 kV Brayton Point Station (Primary) or 115 kV Davisville Substation (alternative) CNR N N PD RI W F
668 2/23/2021 ETU 7/24/2017 NE Clean Power Link - controllable HVDC Tie - CNI only NA N/A Windsor VT 12/31/2027 10/28/2027 Coolidge Substation NI N N VT A F
667 4/12/2018 G 7/21/2017 Solar PV SUN 0 150 150 Somerset ME 10/31/2020 8/1/2020 4/12/2018 CMP Larrabee Road 345 kV CNR N N PD ME W F
666 4/12/2018 G 7/21/2017 battery storage additional (see Q664) OT WND BAT 0 238.6 238.6 Franklin ME 10/31/2020 8/1/2020 4/12/2018 CMP Larrabee Road Station 345 kV CNR N N PD ME W F
665 4/12/2018 G 7/21/2017 Battery storage addition (see Q663) OT WND BAT 0 265.6 265.6 Franklin ME 10/31/2020 8/1/2020 4/12/2018 CMP Larrabee Road Station,345 kV CNR N N PD ME W F
664 4/12/2018 G 7/21/2017 Wind WT WND 0 214.3 214.3 Franklin ME 10/31/2020 8/1/2020 4/12/2018 CMP Larrabee Road Station 345 kV CNR N N PD ME W F
663 4/12/2018 G 7/21/2017 Wind WT WND 0 241.2 241.2 Franklin ME 10/31/2020 8/1/2020 4/12/2018 CMP Larrabee Road Station 345 kV CNR N N PD ME W F
662 4/12/2018 G 7/20/2017 Wind WT WND 150 150 150 Franklin ME 12/1/2022 9/1/2022 4/12/2018 CMP Avangrid Larrabee Road 345 kV Substation CNR N N PD ME W F
661 4/12/2018 ETU 7/20/2017 345 kV AC line from Quebec to ME NA N/A 450 Franklin ME 12/1/2022 9/1/2022 4/12/2018 CMP/Avangrid 345 kV Larabee Road N/A N N PD ME W F
660 9/10/2020 G 7/20/2017 Solar PV SUN 20 20 20 Windham VT 7/1/2022 6/1/2022 9/10/2020 National Grid line tap 69 kV transmission line (D-4), feeding the Vernon Station No. 13 CNR Y Y ISO-NE NA NH W F
659 4/12/2018 ETU 7/18/2017 AC to Larabee Road increase (See Q652 and 658) NA N/A 540 Lewiston ME 12/31/2020 11/30/2020 4/12/2018 Larrabee Road 345 kV Substation in Lewiston, Androscoggin county Maine 04240. NI N N PD ME W F
658 4/12/2018 ETU 7/14/2017 AC to Larabee Road increase (see Q652) NA N/A 200 Lewiston ME 12/31/2020 11/30/2020 4/12/2018 Larrabee Road 345 kV Substation in Lewiston, Androscoggin county Maine 04240. NI N N PD ME W F
657 9/12/2019 ETU 6/29/2017 ETU to increase Downeast Loop transfer NA N/A Hancock ME 12/31/2020 11/30/2020 9/12/2019 N/A N/A N N PD BHE W F
656 2/23/2021 G 6/28/2017 Weaver Wind CNR (see Q420) WT WND 0 72.6 72.6 Hancock ME 12/12/2020 10/13/2020 EMERA Maine 115kV Bull Hill switching station NR N N BHE C F
655 11/30/2021 G 6/15/2017 RoxWind WT WND 15.3 15.3 15.3 Oxford ME 11/30/2021 11/9/2021 34.5 kV Bus at Roxbury Substation, Roxbury, Maine CNR Y Y ISO-NE PD ME C F
654 4/16/2018 G 6/9/2017 Wind CNR only (see Q460, 461, 462) WT WND 0 312 312 Aroostook ME 12/30/2020 9/15/2020 4/12/2018 Pittsfield 345KV CNR N N BHE W F
653 5/14/2019 G 6/9/2017 Number Nine Wind CNR only (Q417) WT WND 0 250 250 Aroostook ME 10/31/2021 4/5/2021 5/13/2019 Pittsfield 345KV CNR N N BHE W F
652 4/12/2018 ETU 6/1/2017 AC to Larabee Road NA N/A 460 Lewiston ME 12/31/2020 11/30/2020 4/12/2018 Larrabee Road 345 kV Substation in Lewiston, Androscoggin county Maine 04240. NI N N PD ME W F
651 7/29/2019 ETU 5/11/2017 AC tie line (import only) NA N/A 600 Berkshire MA 12/31/2023 9/15/2023 7/29/2019 NY Alps 345kV substation and Eversource Berkshire 345 kV substation CNI Y N ISO-NE WMA W F
650 2/5/2018 ETU 5/8/2017 ETU CNI only (see Q498) NA N/A 0 Colchester VT 12/31/2021 10/1/2021 2/2/2018 N/A CNI N N VT W F
649 12/14/2022 G 5/4/2017 Silver Maple Wind WT WND 20 20 20 Penobscot ME 12/14/2022 9/24/2022 Pisgah Mountain Substation, Clifton, ME. 115 kv Bus. NR Y Y ISO-NE PD BHE C F
648 6/1/2017 G 4/28/2017 Gas Turbine Repowering GT DFO NG 0 376 378 Middlesex CT 5/31/2021 3/1/2021 6/1/2017 Middletown Station 345KV Substation CNR N N CT W F
647 6/11/2020 G 4/28/2017 Gas turbine repowering GT DFO NG 23 376 378 Middlesex CT 5/31/2022 2/1/2022 6/11/2020 Middletown Substation at 115KV, MD#2 breaker position CNR Y Y ISO-NE CT W F
646 7/24/2017 G 4/28/2017 Solar PV SUN 20.1 20.1 20.1 Franklin VT 9/1/2019 8/1/2019 7/24/2017 VEC Highgate - Enosburg 46 kV line, 700 feet from Highgate CNR N N VT W F
645 7/24/2017 G 4/28/2017 Solar PV SUN 20.1 20.1 20.1 Orange VT 12/15/2019 11/15/2019 7/24/2017 GMP Randolph Center Substation 46 kV CNR N N VT W F
644 7/24/2017 G 4/28/2017 Solar PV SUN 20.1 20.1 20.1 Franklin VT 10/31/2018 10/15/2018 7/24/2017 VEC Sheldon - Rocktenn 46 kV line CNR N N VT W F
643 5/24/2017 G 4/27/2017 Solar CNR only PV SUN 0 20 20 New Haven CT 12/31/2018 11/15/2018 5/23/2017 CT_NU 115 kV Line from Wallingford to NU_1208_WAL. Proposed POI is located at 41° 26’ 27.9” N , 72° 50’36.6” W (see the attached site layout drawing). CNR N N CT W F
642 5/31/2017 G 4/26/2017 Repowering Increase GT DFO NG 34.85 98.12 98.16 Norfolk MA 5/22/2021 2/22/2021 5/31/2017 BELD station 16 switchyard CNR N N SEMA W F
641 8/13/2018 G 4/24/2017 Wind WT WND 65.55 54.6 54.6 Oxford ME 12/31/2020 9/15/2020 8/13/2018 CMP 115 kV Line 210 CNR N N PD ME W F
640 12/1/2020 ETU 4/21/2017 1000 MW HVDC (import only) NA N/A 1000 Plymouth MA 12/31/2022 11/30/2022 11/30/2020 Northern Interconnection: Coleson Cove 345kV Substation, New Brunswick Southern Interconnection: 345kV lines from Pilgrim Substation, Plymouth, Massachusetts NI N N PD SEMA W F
639 11/2/2020 ETU 4/19/2017 NECEC 1200 MW HVDC (import only) - controllable NA N/A 1200 Androscoggin ME 1/7/2026 9/1/2025 CMP Larrabee Rd 345 kV Substation NI Y Y ISO-NE PD ME A F
638 8/8/2019 G 4/13/2017 Solar CNR only (see Q578) PV SUN 0 152 152 Franklin ME 10/31/2019 8/1/2019 8/8/2019 CMP Larrabee Road 345 kV. CNR N N PD ME W F
637 8/8/2019 G 4/13/2017 BSS CNR only (see Q577) OT WND BAT 0 270.46 270.46 Franklin ME 10/31/2019 8/1/2019 8/8/2019 CMP Larrabee Road Station,345 kV CNR N N PD ME W F
636 8/8/2019 G 4/13/2017 BSS CNR only (see Q576) OT WND BAT 0 241.49 241.49 Franklin ME 10/31/2019 8/1/2019 8/8/2019 CMP Larrabee Road station 345 kV CNR N N PD ME W F
635 8/8/2019 G 4/13/2017 Wind CNR (see Q574) WT WND 0 216.41 216.41 Franklin ME 10/31/2019 8/1/2019 8/8/2019 CMP Larabee Road 345 kV station CNR N N PD ME W F
634 8/8/2019 G 4/11/2017 Wind CNR (see Q573) WT WND 0 245.38 245.38 Franklin ME 10/31/2019 8/1/2019 8/8/2019 CMP Larabee Road 345 kV station CNR N N ME W F
633 2/24/2020 G 4/6/2017 Passadumkeag Wind CNR only WT WND 0 39.97 39.97 Penobscot ME 6/28/2019 6/28/2019 Existing connection between Emera Maine 115kV lines 64 and 97 NR N N BHE C F
632 1/23/2020 G 4/5/2017 Offshore Wind w/ battery storage OT WND BAT 880 880 880 NA MA 12/6/2024 4/5/2024 1/23/2020 Eversource, 115kV Bourne Substation, Barnstable County, Massachusetts CNR Y N ISO-NE PD SEMA W F
631 7/26/2017 G 4/5/2017 CHP IC NG 8 8.64 8.64 Coos NH 7/15/2018 6/15/2018 7/26/2017 PSNH 34.5 kV Line, Berlin, NH CNR N N NH W F
630 11/29/2017 G 4/5/2017 Project Increase ST MSW 2.153 15.67 15.67 Hartford CT 9/1/2017 9/1/2017 11/21/2017 Connecticut Light and Powers 13.8 kv Forestville 12A Substation CNR N N CT W F
629 5/24/2017 G 3/7/2017 Solar PV SUN 20 20 20 New Haven CT 12/31/2018 11/15/2018 5/23/2017 CT_NU 115 kV Line from Wallingford to NU_1208_WAL. Proposed POI is located at 41° 26’ 27.9” N , 72° 50’36.6” W (see the drawing with file name "Project Facility Layout - 22NOV16.pdf" for a map of proposed POI location). NR N N CT W F
628 9/15/2017 G 3/7/2017 Solar PV SUN 30 30 30 Cheshire NH 12/31/2018 9/30/2018 8/9/2017 Eversource 34.5 kV Monadnock SS (3120 line) NA N N NH W N
627 7/16/2019 ETU 12/27/2016 400 kV HVDC Tie - Import Only NA N/A 1200 1200 1200 Grafton NH 12/31/2022 10/1/2022 7/16/2019 GRID 230 kV Comerford Substation CNI N N NH W F
626 4/3/2018 G 12/14/2016 Wind WT WND 376.2 376.2 376.2 Aroostook ME 12/1/2019 10/1/2019 4/2/2018 MEPCO 396 line CNR N N PD BHE W F
625 4/11/2019 ETU 11/10/2016 345 kV AC line NA N/A 1600 1600 1600 Bristol MA 12/31/2023 8/31/2023 4/11/2019 345 kV Brayton point substation N/A N N PD RI W F
624 8/26/2020 G 11/8/2016 Vineyard Offshore Wind WT WND 800 800 800 NA MA 10/31/2024 1/2/2024 115 kV Barnstable Substation CNR Y Y ISO-NE PD SEMA A F
623 8/12/2021 G 10/31/2016 Solar PV SUN 150 150 150 York ME 12/31/2022 12/15/2022 8/12/2021 CMP/Eversource 345 kV Line 391 from Buxton substation to Scobie Pond substation (approx. 27.7 miles from Buxton substation) NR Y Y ISO-NE PD ME W F
622 4/29/2022 G 10/17/2016 Cogen DG GT NG 43 43 43 Middlesex MA 9/30/2021 8/31/2020 Putnum Station 831 NA Y Y NU CMA C N
621 4/12/2018 G 10/17/2016 Wind WT WND 93.6 93.6 93.6 Somerset ME 1/15/2020 12/30/2019 4/12/2018 CMP Section 3023 345 kV line (via Johnson Mountain substation) CNR N N PD ME W F
620 8/13/2020 G 10/7/2016 Solar PV SUN 75 75 75 Washington ME 5/31/2022 5/15/2022 8/12/2020 Emera 115 kV Deblois substation NR Y Y ISO-NE PD BHE W F
619 1/25/2017 ETU 9/16/2016 Bi-directional AC LIne NA N/A Berkshire MA 12/31/2021 11/30/2021 1/25/2017 NY Alps 345 kV Substation to WMECO Berkshire 345 kV substation N/A N N PD WMA W F
618 8/10/2022 G 8/1/2016 Bay State Offshore Wind 1 WT WND 800 800 800 NA MA 5/31/2026 9/21/2025 8/10/2022 National Grid, 345 kV Brayton Point Substation, Somerset, MA NR Y Y ISO-NE PD RI W F
617 7/23/2024 G 7/22/2016 Simple Cycle Gas Turbine GT DFO NG 61.851 61.851 67.851 Essex MA 6/29/2024 1/11/2024 Peabody Waters River Substation NA Y Y NGRID BOST C N
616 7/14/2016 G 7/1/2016 Solar PV SUN 19.9 Windsor VT 7/1/2017 6/15/2017 7/13/2016 115 kV Cooolidge Substation CNR N N PD VT W F
615 7/14/2016 G 6/28/2016 Solar PV SUN 78.4 78.4 78.4 Cheshire NH 7/1/2018 6/15/2018 7/13/2016 Mondanock to Ashburnham Eversource 115 kV line CNR N N PD VT W F
614 7/14/2016 G 6/28/2016 Solar PV SUN 78.4 78.4 78.4 Franklin ME 7/1/2018 6/15/2018 7/13/2016 CMP Sturtevant Substation - 115 kV CNR N N PD ME W F
613 7/14/2016 G 6/28/2016 Solar PV SUN 63 63 63 Windham CT 7/1/2018 6/15/2018 7/13/2016 Killingly to Tunnel 115 kV line CNR N N PD CT W F
612 9/25/2017 G 4/26/2016 Medway Hydro - CNR only HD WAT 0 4.003 4.003 Penobscot ME 8/14/2017 8/14/2017 Medway Substation CNR N N BHE C F
611 1/4/2018 G 4/25/2016 Combustion Turbine GT NG 102 102 102 Fairfield CT 6/1/2019 1/1/2019 1/4/2018 Eversource Energy 115kV MiddleRiver Substation Danbury, CT CNR Y N ISO-NE PD SWCT W F
610 3/27/2017 G 4/22/2016 Steam Turbines ST BLQ DFO KER WDS 75 75 80 Franklin ME 5/31/2018 5/30/2018 3/24/2017 Central Maine Power (CMP) Riley 115kV Section 230 (K230-2) CNR N N PD ME W F
609 6/3/2016 G 4/22/2016 Gas Turbine Upgrade GT DFO 23.52 162 162 New Haven CT 5/31/2020 4/21/2020 6/3/2016 POI is the CL&P Devon 115kv Substation CNR N N PD CT W F
608 5/24/2016 G 4/22/2016 Combined Cycle GT CC NG WO 68.01 68.01 69.5 Bristol MA 5/1/2020 12/31/2019 5/24/2016 Located at current Cleary node 375,376 interconnected with National Grid s-8 and v-5 line, SEMA load zone. CNR N N PD SEMA W F
607 11/29/2017 G 4/21/2016 Canton Mountain Wind CNR Only WT WND 0 22.8 22.8 Oxford ME 12/1/2017 10/18/2017 CMP Ludden Lane Substation, Canton, Maine CNR N N ME C F
606 6/8/2017 G 4/21/2016 Huntington Falls 2017 Upgrades HD WAT 1.59 1.24 1.24 Chittenden VT 4/12/2017 3/13/2017 GMP Huntington Falls Substation 46 kV Circuit Breaker BB-10 CNR Y Y PD VT C F
605 11/9/2020 G 4/21/2016 Sanford Airport Solar CNR only PV SUN 0 50 50 York ME 11/7/2020 10/6/2020 CMP Sanford 115kV substation NR N N PD ME C F
604 8/1/2018 G 4/20/2016 Lake Road CNR Only (see Q534) CC NG 0 882 951 Windham CT 5/20/2018 11/26/2017 345kV Lake Road 27E Substation CNR N N PD RI C F
603 6/15/2022 G 4/15/2016 Essential Power Newington - CNRC Increase CC DFO NG 0 596.1 634.9 Rockingham NH 10/28/2016 10/28/2016 Public Service New Hampshire Newington Switchyard - Gosling Road, Newington, NH CNR N N NH C F
602 10/25/2023 G 4/14/2016 Moore Station Uprate HW WAT 4.6 195.9 195.9 Grafton NH 10/18/2023 9/22/2023 NGRID at Moore power station switchyard 230kV CNR Y Y ISO-NE NH C F
601 8/28/2017 G 4/14/2016 Combined Cycle Upgrade CC DFO NG 40 655.873 689.794 Providence RI 5/31/2020 3/1/2020 8/28/2017 NGRID 345kV Sherman Road (existing OSP I and II switchyard) CNR N N PD RI W F
600 8/28/2017 G 4/14/2016 Combined Cycle Uprate CC DFO NG 21.077 615.873 649.794 Providence RI 7/31/2016 7/15/2016 8/28/2017 NGRID 345kV Sherman Road (existing OSP I and II switchyard) CNR N N PD RI W F
599 1/23/2018 G 4/5/2016 Solar PV SUN 65 65 65 Cheshire NH 4/18/2018 4/15/2018 1/23/2018 NGrid 115kV line from Vernon road tap to the Vernon Road Substation CNR N N PD VT W F
598 3/28/2018 G 3/7/2016 Combined Cycle CC DFO NG 563 563 576 Windham CT 3/1/2022 9/1/2021 3/28/2018 Killingly/Lake Road 345 kV CNR Y N ISO-NE PD CT W F
597 4/20/2018 G 2/24/2016 Hydro HD WAT 28.325 28.325 28.325 Oxford/Franklin/Androscoggin ME 6/1/2019 5/31/2019 4/20/2018 CMP Section 230 (115 kV) at southeast end, high side of Verso Androscoggin substation CNR N N PD ME W F
596 5/19/2017 G 2/8/2016 Combined Cycle CC DFO NG 1120 1120 1170 Windham CT 6/1/2020 10/1/2019 5/19/2017 Killingly or Lake Road 345 kV CNR N N PD CT W F
595 6/26/2017 G 2/8/2016 Bridgeport Energy PSS Tuning GT NG 0 578 588 Fairfield CT 10/28/2016 10/28/2016 UI Singer Substation CNR Y Y ISO-NE SWCT C F
594 4/9/2018 G 1/27/2016 Wind WT WND 0 245.48 245.48 Franklin ME 10/31/2019 8/1/2019 4/9/2018 CMP''s existing Orrington - Albion Road 345 kV line section 3023 NR N N PD ME W F
593 4/9/2018 G 1/27/2016 Wind WT WND 0 216.41 216.41 Franklin ME 10/31/2019 8/1/2019 4/9/2018 CMP''s Orrington - Albion Road 345 kV line, section 3023 NR N N PD ME W F
592 1/9/2023 G 1/21/2016 Bear Swamp Unit 1 and 2 Upgrade PS WAT 66 663 663 Berkshire MA 1/6/2023 12/1/2022 GRID 230 kV Bear Swamp substation CNR Y Y ISO-NE PD WMA C F
591 4/12/2018 ETU 1/20/2016 AC Line NA N/A 400 400 400 Cumberland ME 11/30/2019 10/31/2019 4/12/2018 CMP Surowiec Area N/A N N PD ME W F
590 4/12/2018 ETU 1/11/2016 AC Line from NMISA to Chester and Pittsfield, ME NA N/A 1200 1200 1200 Somerset and Penobscot ME 12/31/2019 11/30/2019 4/12/2018 Emera Keene Rd substation and CMP Section 3023 345 kV Line N/A N N PD ME W F
589 4/12/2018 ETU 1/11/2016 AC Line to Pittsfield, ME NA N/A 550 550 550 Somerset ME 12/31/2019 11/30/2019 4/12/2018 CMP Section 3023 345 kV Line N/A N N PD ME W F
588 12/27/2021 G 1/7/2016 Quinebaug Solar PV SUN 49 49 49 Windham CT 12/18/2021 12/11/2021 Killingly to Tunnel 115 kV line (approx 5.5 miles south of Brooklyn Substation) GPS Coordinates: - 71 55’ 27.9” W - 41 44’ 14.21” N NR Y Y ISO-NE PD CT C F
587 9/29/2016 G 1/7/2016 Solar PV SUN 98 98 98 Cheshire NH 7/1/2018 6/15/2018 9/28/2016 115 kV Eversource Fitzwilliam Substation CNR N N PD VT W F
586 10/28/2016 G 1/4/2016 Hemphill Increase ST WDS 3.363 17.5 17.5 Sullivan NH 10/28/2016 10/28/2016 34.5 Kv PSNH 316 Utility Line CNR Y Y ISO-NE NH C F
585 3/5/2018 ETU 12/14/2015 HVDC Tie NB to Mystic NA N/A 900 900 900 Middlesex MA 12/30/2020 11/30/2020 3/5/2018 NB 345 kV Coleson Cove substation to NSTAR 345 kV Mystic substation CNI N N PD BOST W F
584 10/31/2018 ETU 12/10/2015 ETU CNI only (see Q508) NA N/A 0 0 0 Berkshire MA 8/31/2019 7/31/2019 10/31/2018 NY Alps substation to WMECO Berkshire substation CNI N N WMA W F
583 11/9/2020 G 12/4/2015 Sanford Airport Solar PV SUN 50 50 50 York ME 11/7/2020 10/6/2020 CMP Sanford 115kV Substation NR Y Y ISO-NE PD ME C F
582 2/5/2018 G 12/2/2015 Solar PV SUN 3.11 3.105 3.105 Worcester MA 12/1/2017 11/1/2017 2/5/2018 POI is the GRID 69KV switchyard at the Harrington Street Facility. 229 Harrington Street, East Brookfield, MA. National Grid has this information. CNR Y N CMA W F
581 2/5/2018 G 12/2/2015 Solar PV SUN 2.66 2.66 2.66 Worcester MA 12/1/2017 11/1/2017 2/5/2018 POI is the GRID 69KV switchyard at the Harrington Street Facility. 229 Harrington Street, East Brookfield, MA. National Grid has this information. CNR Y N CMA W F
580 5/18/2016 G 11/30/2015 Combined Cycle CC DFO NG 1020 1020 1030 Worcester MA 5/31/2020 1/15/2020 5/17/2016 Anticipated interconnection is the National Grid 345kV line 366 between the West Farnum and Millbury substations, and/or the Eversource 345kV line 3361 between Sherman Rd and Blackstone. CNR N N PD CMA W F
579 4/21/2016 G 11/25/2015 Energy Center OT NG OTH 570.1 570.1 569.6 Cheshire NH 6/1/2020 3/1/2020 4/21/2016 Eversource (PSNH) 379 line crossing Forest Lake Road (POI will be south of Forest Lake Road), which is in close proximity to the Project site. CNR N N PD VT W F
578 8/8/2019 G 11/20/2015 Solar PV SUN 152 152 152 Somerset ME 10/31/2019 8/1/2019 8/8/2019 CMP Larrabee Road 345 kV. NR Y N ISO-NE PD ME W F
577 8/8/2019 G 11/12/2015 Battery Storage OT WND BAT 25.08 270.46 270.46 Frqanklin ME 11/9/2019 8/1/2019 8/8/2019 CMP Larrabee Road Station,345 kV NR Y N ISO-NE PD ME W F
576 8/8/2019 G 11/12/2015 Battery Storage OT WND BAT 52.26 241.49 241.49 Franklin ME 10/31/2019 8/1/2019 8/8/2019 CMP Larrabee Road station 345 kV NR Y N ISO-NE PD ME W F
575 8/25/2017 G 11/3/2015 Casco Bay Energy Storage OT BAT 16.2 16.2 16.2 Cumberland ME 12/31/2016 12/2/2016 CMP''s PTF 115kV Upper Bus at William F Wyman Station NR Y Y ISO-NE ME C F
574 8/8/2019 G 11/3/2015 Wind WT WND 216.41 216.41 216.41 Franklin ME 10/31/2019 8/1/2019 8/8/2019 CMP Larrabee Road Station 345 kV NR Y N ISO-NE PD ME W F
573 8/8/2019 G 11/3/2015 Wind WT WND 245.38 245.38 245.38 Franklin ME 10/31/2019 8/1/2019 8/8/2019 CMP Larrabee Road Station 345 kV NR Y N ISO-NE PD ME W F
572 4/9/2018 G 11/3/2015 Wind WT WND 113 113 113 Franklin ME 10/31/2019 8/1/2019 4/9/2018 CMP Larrabee Road 345 kV station NR N N PD ME W F
571 8/8/2019 ETU 11/2/2015 Wyman Area to Larabee Rd Line NA N/A 850 850 850 Somerset/Androscoggin ME 11/30/2019 10/31/2019 8/8/2019 Wyman Area to CMP Larabee Rd 345 kV sub N/A Y N ISO-NE PD ME W F
570 5/31/2016 G 10/21/2015 Kendall Revised Reconfiguration Project CC DFO NG 0 250 250 Middlesex MA 5/31/2016 5/31/2016 Where line 875-539 interconnects with TO''s 115KV bus at station CNR N N BOST C F
569 6/25/2018 ETU 10/16/2015 HVDC from ME to MA (MA import only) NA N/A 1200 1200 1200 Plymouth MA 12/31/2021 11/30/2021 6/25/2018 Emera Orrington 345 kV substation to Eversource Jordan Rd N/A N N PD SEMA W F
568 3/11/2021 G 9/25/2015 Solar PV SUN 10 10 10 Rockingham NH 11/1/2021 10/15/2021 3/11/2021 Unitil 34.5 kV W. Port. St. sub NA Y Y NH W N
567 9/21/2015 G 9/11/2015 Solar PV SUN 196 196 196 Franklin VT 7/1/2017 6/15/2017 9/21/2015 VELCO Highgate Substation - 345 kV Bus CNR N N VT W F
566 4/18/2016 G 9/9/2015 Solar PV SUN 19.9 19.9 19.9 Rutland VT 12/1/2016 11/1/2016 4/15/2016 VELCO Florence Substation - 46 kV CNR N N PD VT W F
565 12/20/2018 G 9/8/2015 Coolidge Solar PV SUN 19.9 19.9 19.9 Windsor VT 12/20/2018 12/12/2018 115 kV Coolidge Substation CNR Y Y ISO-NE PD VT C F
564 2/24/2016 G 9/4/2015 Solar PV SUN 19.9 19.9 19.9 Franklin VT 12/1/2016 11/15/2016 2/24/2016 115 kV Highgate Substation CNR N N PD VT W F
563 9/8/2015 G 9/1/2015 Solar PV SUN 20 20 20 Rutland VT 11/1/2016 10/1/2016 9/3/2015 VELCO 46 kV bus at Florence Substation NA N N VT W N
562 5/24/2017 G 8/27/2015 Solar PV SUN 20 20 20 Orleans VT 8/31/2017 7/31/2017 5/24/2017 VEC Irasburg H16 46 kV line NA N N VT W N
561 1/26/2017 G 8/27/2015 Solar PV SUN 20 20 20 Franklin VT 8/31/2017 7/31/2017 1/25/2017 VEC Highgate to Rock Tenn 46 kV line NA N N VT W N
560 10/30/2015 G 8/27/2015 Solar PV SUN 20 20 20 Orange VT 12/1/2016 11/1/2016 10/29/2015 GMP 46 kV Randolph Center Substation NA N N VT W N
559 9/8/2015 G 8/12/2015 solar PV SUN 20 20 20 Windsor VT 12/1/2016 11/15/2016 9/3/2015 115 kV Coolidge substation NA N N VT W N
558 9/8/2015 G 8/12/2015 solar PV SUN 20 20 20 Franklin VT 12/1/2016 11/15/2016 9/3/2015 115 kV Highgate Substation NA N N VT W N
557 10/27/2021 G 8/10/2015 Farminton Solar PV SUN 78.4 78.4 78.4 Franklin ME 10/27/2021 9/9/2021 CMP Sturtevant Substation - 115 kV NR Y Y ISO-NE PD ME C F
556 4/27/2017 G 8/7/2015 Wind Farm WT WND 79.2 79.2 79.2 Somerset ME 12/1/2019 9/1/2019 4/27/2017 CMP Wyman - Harris 115 kV CNR N N PD ME W F
555 1/18/2019 G 8/7/2015 Wind farm WT WND 39.6 39.6 39.6 Oxford ME 12/1/2019 9/1/2019 1/18/2019 CMP Rumford-Kimball Road 115 kV CNR Y N PD ME W F
554 7/5/2017 G 6/18/2015 Southbridge LFGTE Engine 2 IC LFG 1.6 3.2 3.2 Worcester MA 8/18/2018 7/25/2018 7/5/2017 National Grid 413L4 (Existing facility POI) CNR Y N NGRID CMA W F
553 8/28/2015 G 6/12/2015 Solar PV SUN 19.9 19.9 19.9 Franklin ME 12/1/2016 11/15/2016 8/28/2015 115 kV Sturtevant sub CNR N N PD ME W F
552 12/8/2020 G 6/12/2015 Nutmeg Solar, LLC PV SUN 19.9 19.9 19.9 Hartford CT 12/7/2020 11/15/2020 115kV Sitico Sub NR Y Y ISO-NE CT C F
551 8/4/2015 G 6/12/2015 Solar PV SUN 19.9 19.9 19.9 Windsor VT 12/1/2016 11/15/2016 8/4/2015 115kV Coolidge sub CNR N N VT W F
550 8/4/2015 G 6/12/2015 Solar PV SUN 19.9 19.9 19.9 Franklin VT 12/1/2016 11/15/2016 8/4/2015 115 kV Highgate Sub CNR N N VT W F
549 7/13/2015 G 5/28/2015 Combined Cycle CC DFO NG 870 870 893 Newport RI 5/1/2020 1/2/2020 7/9/2015 interconnection on NGRID 115kV M13 & L14 lines connecting to Somerset and Bell Rock substations CNR N N PD RI W F
548 5/20/2016 G 5/28/2015 Combined Cycle CC DFO NG 870 870 893 Plymouth MA 5/1/2020 1/2/2020 5/19/2016 interconnection between Carver and Tremont substations (NSTAR 115kV Lines 127/128 and 134): ALT connection 345kV Carver substation CNR N N BL SEMA W F
547 5/31/2018 G 4/28/2015 Wind uprate WT WND 2.93 42.9 42.9 Penobscot ME 12/31/2018 12/1/2018 5/31/2018 Existing connection between Emera Maine 115kV lines 64 and 97 NR N N PD BHE W F
546 5/21/2019 G 3/4/2015 NEA Bell. Uprate (Northeast Energy Associates, LP) CC DFO NG 1.393 314.7 340.241 Norfolk MA 7/31/2018 7/15/2018 345 kV NEA Bellingham substation CNR N N SEMA C F
545 6/29/2015 G 3/3/2015 Proctor Hydroelectric Station Uprate HD WAT 3.241 2 2 Rutland VT 6/25/2015 5/2/2015 GMP Proctor Substation 46kV Circuit Breaker BB8 CNR N Y VT C F
544 8/18/2015 G 3/3/2015 Increase RISEC Winter CNR CC NG 0 613 625 Providence RI 8/17/2015 8/17/2015 115 kV RISE substation CNR N N RI C F
543 12/30/2019 G 3/2/2015 Antrim Wind WT WND 28.4 28.4 28.4 Hillsborough NH 12/24/2019 8/16/2019 Proposed POI is to PSNH 115 kV line L163. CNR Y Y ISO-NE PD NH C F
542 4/18/2016 G 3/2/2015 combustion turbine GT DFO NG 97 97 97 Norfolk MA 2/1/2018 12/1/2017 4/18/2016 NSTAR 115kV Edgar substation CNR N N PD SEMA W F
541 2/17/2016 G 3/2/2015 Combined cycle (alt to Q442/472) CC DFO NG 431 431 452 Hampden MA 3/1/2019 6/1/2018 2/16/2016 115kV Line 1302 between Buck Pond and Pochassic substations, approximately 1 mile south of Buck Pond CNR N N WMA W F
540 5/21/2018 G 3/2/2015 CPV Towantic Increase CC DFO NG 55.5 800.5 830.5 New Haven CT 5/21/2018 1/24/2018 CL&P 115kV Lines 1575, 1585 & 1990 CNR Y Y ISO-NE PD SWCT C F
539 1/29/2016 G 3/2/2015 Hoosac Wind Project CNR Only WT WND 0 28.5 28.5 Franklin MA 1/19/2016 1/19/2016 Hoosac 69 kV Substation CNR N N WMA C F
538 4/27/2016 G 3/2/2015 Internal Combustion IC NG 119.4 119.4 119.4 Newport RI 5/31/2019 4/30/2019 4/27/2016 Near Bell Rock and Somerset on NGRID 115kV lines L14 and M13. Adjacent to existing Tiverton combined cycle generator, possibly associated with existing tap. CNR N N PD RI W F
537 5/22/2015 G 2/28/2015 Combustion Turbine GT NG 11.965 11.965 14.097 Middlesex MA 11/30/2016 8/31/2016 5/21/2015 MECO 23KV Behen St feeder load side of MTR 04034085 CNR N N BOST W N
536 12/10/2015 G 2/27/2015 Wind WT WND 4.98 4.98 4.98 Orleans VT 9/13/2016 9/1/2016 12/10/2015 GMP Line 14 between Irasburg and Lowell Substations approximately 3.6 miles from Irasburg Substation adjacent to Kidder Hill Road CNR N N VT W F
535 1/7/2020 G 2/27/2015 Holiday Hill Community Wind WT WND 4.98 4.98 4.98 Hampden MA 1/7/2020 11/26/2019 WMECo 23 kV line 19J1 adjacent to Pine Hill Road in the town of Russell, Massachusetts CNR Y Y NU WMA C F
534 8/1/2018 G 2/27/2015 Lake Road Upgrades CC NG 49.836 882 951 Windham CT 5/20/2018 11/26/2017 345kV Lake Road 27E Substation CNR Y Y ISO-NE PD CT C F
533 8/1/2017 G 2/27/2015 Milford Upgrades - Phase I CC NG 16.606 293 318.5 New Haven CT 6/5/2017 5/22/2017 115kV East Devon Substation CNR Y Y ISO-NE PD SWCT C F
533 8/1/2017 G 2/27/2015 Milford Upgrades - Phase II CC NG 16.606 293 318.5 New Haven CT 5/22/2017 4/12/2017 115kV East Devon Substation CNR Y Y ISO-NE PD SWCT C F
532 6/2/2016 G 2/27/2015 wind WT WND 17.4 17.4 17.4 Franklin VT 9/15/2016 9/1/2016 6/1/2016 GMP 34.5 kV Line between North St. Albans and Sheldon Springs Substations. State Route 105, Swanton, Vermont CNR N N VT W F
531 4/5/2018 G 2/27/2015 Combined Cycle Uprate CC NG 29.999 546.8459 582.5609 Penobscot ME 8/1/2018 7/16/2018 4/5/2018 EMERA Maine-Graham Station via 115kv CNR N N PD BHE W F
530 11/21/2017 G 2/26/2015 Bridgeport Energy Wet Compression Upgrade CC NG 18 578 588 Fairfield CT 6/1/2018 5/16/2018 9/14/2017 UI Singer Substation CNR Y Y ISO-NE PD SWCT W F
529 6/26/2017 G 2/26/2015 Combined Cycle CNR Only CC NG 0 585.648 615 Worcester MA 11/3/2017 10/20/2017 6/26/2017 ANP Blackstone 345kV Bus 110785 Station BLK_336 CNR N N CMA W F
528 9/29/2016 G 2/26/2015 Combined Cycle Upgrate #3 CC NG 30 249.583 260.73 Worcester MA 10/8/2018 9/24/2018 9/28/2016 Milford Power Switch DS-F3 115kV (Nat Grid # D-130-3) and Milford Power Switch DS-A3 115kV (Nat Grid # C-129-3) CNR Y N ISO-NE PD CMA W F
527 12/20/2018 G 2/26/2015 Combined Cycle Uprate #2 CC NG 30 219.583 230.73 Worcester MA 12/14/2018 12/13/2018 Milford Power Switch DS-F3 115kV (Nat Grid #D-130-3) and Milford Power Switch DS-A3 115kV (Nat Grid #C-129-3). CNR Y Y ISO-NE PD CMA C F
526 9/29/2016 G 2/26/2015 Combined Cycle Upgrade #1 CC NG 40.583 189.583 200.73 Worcester MA 10/8/2018 9/24/2018 9/28/2016 Milford Power Switch DS-F3 115kV (Nat Grid # D-130-3) and Milford Power Switch DS-A3 115kV (Nat Grid # C-129-3) CNR Y N ISO-NE PD CMA W F
525 11/8/2016 G 2/25/2015 Tiverton Power LLC Upgrade CC NG 21.5 287.5 305.5 Newport RI 11/4/2016 11/2/2016 near Bell Rock and Somerset on NGRID 115kV lines L14 and M13. CNR Y Y ISO-NE RI C F
524 3/31/2015 G 2/23/2015 Combustion Turbine (Alt to Q523) GT DFO NG 0 226.5 233.5 Providence RI 5/1/2019 1/1/2019 3/31/2015 Both National Grid 115kV lines S171 and T172 south of the Rhode Island State Energy tap. CNR N N RI W F
523 9/14/2015 G 2/23/2015 Combustion Turbine GT DFO NG 226.5 226.5 233.5 Providence RI 5/1/2019 1/1/2019 9/11/2015 Both National Grid 345kV lines 328 and 332 south of the Rhode Island State Energy project CNR N N PD RI W F
522 7/9/2015 G 2/20/2015 Plainfield 2.3 MW Capacity Restoration (CNR Only) ST WDS 0 38.5 38.5 Windham CT 7/1/2015 7/1/2015 Frybrook substation, 115 KV CNR N N CT C F
521 3/10/2016 G 2/17/2015 Combustion Turbine GT DFO NG 109.799 109.799 109.799 Fairfield CT 5/2/2018 4/4/2018 3/10/2016 CL&P (Eversource) 115 kV Middle River Substation CNR N N PD SWCT W F
520 3/10/2016 G 2/17/2015 Simple Cycle gas turbine GT DFO NG 109.799 109.799 109.799 Fairfield CT 5/2/2018 4/4/2018 3/10/2016 Eversource Energy 115 kv Line Middle River Substation 28M CNR N N PD SWCT W F
519 8/18/2015 ETU 2/16/2015 HVDC/AC Tie - Import only NA N/A 1200 1200 1200 Rockingham NH 4/30/2019 3/30/2019 8/18/2015 HQ Des Cantons substation to PSNH Deerfield substation CNI N N PD NH W F
518 7/9/2015 ETU 2/16/2015 HVDC from S. Maine to K Street - bidirectional fl NA N/A 1000 1000 1000 Suffolk MA 12/1/2018 11/1/2018 7/9/2015 CMP 345 kV ME Yankee substation to NSTAR 115 kV K Street substation N/A N N PD BOST W F
517 7/9/2015 ETU 2/16/2015 HVDC from S. Maine to Mystic - bidirectional flow NA N/A 1000 1000 1000 Middlesex MA 12/31/2018 11/1/2018 7/9/2015 CMP 345 kV ME Yankee substation to NSTAR 345 kV Mystic substation N/A N N PD BOST W F
516 4/15/2015 ETU 2/16/2015 HVDC Tie - Import only NA N/A 425 425 425 Addison VT 6/30/2018 1/30/2018 4/15/2015 HQ to VELCO 345 kV New Haven substation CNI N N VT W F
515 4/15/2015 ETU 2/16/2015 HVDC Tie - Import only NA N/A 425 425 425 Franklin VT 6/30/2018 1/30/2018 4/15/2015 HQ to VELCO Williston 115 kV substation CNI N N VT W F
514 4/17/2015 ETU 2/16/2015 Expand NB/NE Interface NA N/A 350 350 350 Aroostook ME 11/1/2017 9/1/2017 4/17/2015 NB to ME interface CNI N N BHE W F
513 4/17/2015 ETU 2/16/2015 Coos ETU NA N/A Coos NH 7/1/2016 7/1/2016 4/17/2015 PSNH Coos area transmission N/A N N NH W F
512 4/17/2015 ETU 2/16/2015 AC to HVDC Tie NA N/A 1200 1200 1200 Middlesex MA 3/31/2019 1/1/2019 4/17/2015 NB 345 kV Keswick or St. Andre substation to NGRID 345 kV Wakefield substation CNI N N BOST W F
511 4/15/2015 ETU 2/16/2015 HVDC Line NA N/A 1000 1000 1000 Barnstable MA 6/1/2020 6/1/2020 4/15/2015 NSTAR 345 kV Barnstable substation N/A N N SEMA W F
510 4/15/2015 ETU 2/16/2015 HVDC Line NA N/A 1000 1000 1000 Plymouth MA 6/1/2020 6/1/2020 4/15/2015 NSTAR 345 kV Carver substation N/A N N SEMA W F
509 4/17/2015 ETU 2/16/2015 HVDC Line NA N/A 1100 1100 1100 Middlesex MA 6/30/2017 3/30/2017 4/17/2015 Orrington substation to NGRID Tewksbury substation N/A N N BOST W F
508 10/31/2018 ETU 2/16/2015 HVDC from NY to WMA - bidirectional NA N/A 600 600 600 Berkshire MA 8/30/2019 7/30/2019 10/31/2018 NY Alps substation to WMECO Berkshire substation NI Y Y ISO-NE PD WMA W F
507 1/30/2018 ETU 2/16/2015 AC Tie - bidirectional flows NA N/A 75 75 75 Aroostook ME 7/31/2017 7/25/2017 1/30/2018 NMISA Mullen substation to Emera Keene Road substation NI N N PD BHE W F
506 2/10/2020 ETU 2/16/2015 Internal HVDC - North to South flow NA N/A 1000 1000 1000 Suffolk MA 10/1/2027 9/1/2027 2/10/2020 NMISA to NSTAR 345 kV K Street substation N/A Y Y ISO-NE PD BOST W F
505 4/17/2015 ETU 2/16/2015 HVDC Tie - Import only NA N/A 1000 1000 1000 Windsor VT 12/31/2017 12/31/2017 4/17/2015 HQ to VELCO 345 kV Coolidge substation CNI N N VT W F
504 4/15/2015 ETU 2/16/2015 HVDC Tie - Import only NA N/A 1000 1000 1000 Addison VT 12/31/2018 10/31/2018 4/15/2015 HQ 735 kV substation to VELCO 345 kV New Haven substation CNI N N VT W F
503 4/15/2015 ETU 2/16/2015 HVDC Tie - Import only NA N/A 1000 1000 1000 Rutland VT 12/31/2018 10/31/2018 4/15/2015 HQ 735 kV substation to VELCO 345 kV W. Rutland substation CNI N N VT W F
502 4/17/2015 ETU 2/16/2015 345 kV Tie - Phase 1 NA N/A 200 200 200 Aroostook ME 12/1/2016 12/1/2016 4/17/2015 Houlton, ME to MEPCO 396 Line N/A N N BHE W F
502 4/17/2015 ETU 2/16/2015 345 kV Tie - Phase 2 NA N/A 0 0 0 Aroostook ME 12/1/2016 12/1/2016 4/17/2015 Bridgewater, ME to MEPCO 396 Line N/A N N BHE W F
501 3/26/2021 ETU 2/16/2015 NE Clean Power Link - controllable HVDC Tie - Import only NA N/A 1000 1000 1000 Windsor VT 12/31/2027 10/28/2027 HQ 735 kV substation to VELCO 345 kV Coolidge substation NI Y Y ISO-NE PD VT A F
500 7/8/2019 ETU 2/16/2015 Keene Road ETU NA N/A Penobscot ME 12/1/2018 12/15/2018 6/15/2018 Emera Keene Road substation N/A Y N PD BHE W F
499 8/14/2019 ETU 2/16/2015 Northern Pass Transmission Project (300 kV HVDC/AC Tie) - Import Only NA N/A 1090 1090 1090 Rockingham NH 12/29/2022 11/4/2022 8/14/2019 HQ Des Cantes substation to PSNH Deerfield substation NI Y Y ISO-NE PD NH W F
498 2/5/2018 ETU 2/16/2015 150 kV HVDC Tie - Import Only NA N/A 400 400 400 Colchester VT 12/31/2020 12/1/2020 2/2/2018 NYPA 230/115 kV substation to VELCO 345 kV New Haven Substation NI Y Y ISO-NE VT W F
497 2/4/2020 G 2/13/2015 Beacon Falls Energy Park FC NG 62.9 62.9 62.9 New Haven CT 4/1/2022 2/1/2022 1/30/2020 Beacon Falls Substation, 180 Cold Spring Rd, Beacon Falls, CT Junction of 115kV lines 1570-1 and 1319 NR Y Y ISO-NE SWCT W F
496 7/22/2019 G 2/13/2015 Millinocket Frequency Conversion HW WAT 0 126 126 Penobscot ME 6/15/2019 2/13/2019 Powersville Substation, Emera, 115kV, Line62, existing node424. NR Y Y ISO-NE PD BHE C F
495 2/17/2015 ETU 2/13/2015 1200 MW HVDC Tie - Import Only NA N/A Rockingham NH 12/1/2018 9/1/2018 2/16/2015 HQ Des Cantons substation to PSNH Deerfield Substation N/A N N NH W F
494 2/17/2015 ETU 2/12/2015 1000 MW HVDC - bidirectional NA N/A Suffolk MA 12/1/2018 9/1/2018 2/16/2015 CMP 345 kV ME Yankee to NSTAR 115 kV K Street N/A N N BOST W F
493 2/17/2015 ETU 2/12/2015 1000 MW HVDC - bidirectional NA N/A Middlesex MA 12/31/2018 9/1/2018 2/16/2015 CMP 345 kV ME Yankee to NSTAR 345 kV Mystic N/A N N BOST W F
492 11/3/2017 G 2/5/2015 Combustion Turbine Generator GT DFO NG 238 238 238 Providence RI 5/31/2020 3/1/2020 10/3/2017 NGRID 345 kV Sherman Road (via OSP Switchyard) CNR Y Y ISO-NE PD RI W F
491 1/26/2016 G 1/16/2015 Fore River CNR Increase CC DFO NG 0 800 843 Norfolk MA 1/20/2016 1/20/2016 NSTAR Edgar 115kv substation CNR N N SEMA C F
490 5/31/2016 G 1/15/2015 Kendall Reconfiguration Project CC DFO NG 1.88 75 75 Middlesex MA 5/31/2016 5/31/2016 Where line 875-539 interconnects with TO''s 115 kv bus at station 875 CNR N N BOST C F
489 11/26/2019 G 1/8/2015 Clear River CC NG 1030 1030 1080 Providence RI 5/31/2022 1/15/2022 11/26/2019 Sherman Road 345kV Station NR Y Y ISO-NE RI W F
488 10/16/2015 G 12/22/2014 Wind WT WND 73.5 73.5 73.5 Windham VT 12/31/2019 10/1/2019 10/16/2015 VELCO Coolidge - Vermont Yankee 345 kV line CNR N N VT W F
487 4/21/2020 G 12/18/2014 Cricket Valley Project (QP444 in NYISO Queue) CC NG 1020 1020 1132 Dutchess NY 4/18/2020 7/1/2019 Pleasant Valley - Long Mtn 345 kV NA Y N C N
486 6/8/2018 G 12/19/2014 Wind WT WND 250 250 250 Hancock ME 12/1/2021 10/1/2021 6/8/2018 Rebel Hill 115 kV NR N N PD BHE W F
485 4/27/2015 G 12/10/2014 Combined Cycle CC DFO NG 837 837 844 Hampden MA 6/1/2019 9/1/2018 4/23/2015 Ludlow 19S Substation, Ludlow, MA CNR N N WMA W F
484 11/16/2015 G 12/4/2014 Newington Gas Turbine Uprate CC NG 27.9 596.1 634.8 Rockingham NH 10/30/2015 10/30/2015 Public Service New Hampshire Newington Switchyard - Gosling Road, Newington, NH CNR Y Y ISO-NE NH C F
483 3/30/2016 G 11/21/2014 Wyman Hydro CNR only HW WAT 0 89.9 89.9 Somerset ME 3/30/2016 3/24/2016 Interconnection of Buyer’s 115 kV gang operated disconnect switch BS ½ to CMP’s 115 kV Bus No. 2 located in the 115 kV switchyard CNR N N ME C F
482 1/8/2015 G 11/18/2014 Hydro HD WAT 1.318 0.325 0.325 Rutland VT 12/12/2014 12/11/2014 1/8/2015 GMP Power Circuit 85G2 from Ryegate Paper Substation No. 85. CNR N N VT W F
481 6/15/2022 G 11/18/2014 GRE Capacity Uprate CC NG 41 762 812 Rockingham NH 6/29/2017 9/1/2015 Watts Brook, North Litchfield CNR Y Y ISO-NE NH C F
480 2/23/2015 ETU 11/13/2014 1000 MW HVDC Tie NA N/A Suffolk MA 12/31/2017 10/31/2017 2/12/2015 HQ to NSTAR K Street 115 kV substation N/A N N BOST W F
479 11/19/2014 G 10/17/2014 Combined Cycle Increase CC NG 33 754 838 Rockingham NH 3/8/2015 3/7/2015 11/18/2014 Watts Brook, North Litchfield CNR N N NH W F
478 8/17/2016 G 10/1/2014 Wind WT WND 9.6 9.6 9.6 Washington ME 6/1/2016 5/1/2016 8/17/2016 Emera 34.5kV Line 16 NA N N BHE W N
477 6/3/2019 G 9/19/2014 Deerfield Wind Project WT WND 30 30 30 Bennington VT 6/1/2019 12/8/2017 Future GMP Putnam Road 69 kV Substation on Y-25N Line CNR Y Y ISO-NE WMA C F
476 6/21/2016 G 8/29/2014 Wind WT WND 52.8 52.8 52.8 Penobscot/Washington ME 10/1/2017 9/1/2017 6/17/2016 Emera Maine (Bangor Hydro) Keene Road Substation (Connecting through Evergreen Gen Lead, LLC Line 56) CNR N N PD BHE W F
475 2/17/2015 ETU 8/14/2014 600 MW HVDC Tie NA N/A Berkshire MA 12/30/2019 9/30/2019 2/16/2015 Alps Sub in NY to WMECO Berkshire Sub in MA N/A N N WMA W F
474 4/10/2015 G 8/1/2014 CNR Increase CC NG 0 1600 1700 Middlesex MA 5/31/2016 5/30/2016 4/9/2015 Mystic 115 and 345 kV Stations CNR N N BOST W F
473 7/21/2014 TS 6/30/2014 RNS Application NA N/A 0 0 0 Norfolk MA 1/1/2017 1/1/2017 7/21/2014 NU 115 kV N/A N N BOST W F
472 12/29/2015 G 6/20/2014 Combined Cycle Increase CC DFO NG 22 409.9 441.1 Hampden MA 3/1/2019 6/1/2018 12/28/2015 115kV Line 1302 between Buck Pond and Pochassic substations, approximately 1 mile south of Buck Pond CNR Y Y ISO-NE WMA W F
471 4/12/2018 G 6/19/2014 Wind WT WND 600.6 600.6 600.6 Aroostook ME 12/30/2019 11/30/2019 4/12/2018 Primary: Orrington Substations 345kV with two alternatives: Keene Rd. Substation 345kV and the Orrington-Albion Rd 345kV line NR N N PD BHE W F
470 4/12/2018 G 6/19/2014 Wind WT WND 600.6 600.6 600.6 Aroostook ME 12/30/2018 11/30/2018 4/12/2018 Primary: Orrington Substations 345kV with two alternatives: Keene Rd. Substation 345kV and the Orrington-Albion Rd 345kV line NR N N PD BHE W F
469 6/23/2015 G 6/16/2014 Bridgeport Energy Uprate CC NG 84 560 588 Fairfield CT 6/5/2015 3/31/2015 UI Singer Substation CNR Y Y ISO-NE PD SWCT C F
468 3/16/2015 G 6/2/2014 Manchester Street Station Increase and CNR CC NG 27 510 510 Providence RI 3/12/2015 3/2/2015 CTGs NGrid 115 kV Franklin Square Substation. STGs NGrid 11.5 kV distribution substation CNR Y Y ISO-NE PD RI C F
467 6/9/2020 G 5/29/2014 MASSPOWER CNR Recovery CC NG 0 256.1 279.9 Hampden MA 11/10/2014 11/10/2014 115kV Shawinigan Substation CNR N N WMA C F
466 2/17/2015 ETU 5/14/2014 AC Tie NA N/A Aroostook ME 7/31/2016 2/28/2016 2/16/2015 NMISA to Emera Keene Rd Substation N/A N N BHE W F
465 2/17/2015 ETU 5/13/2014 425 MW HVDC Tie NA N/A Addison VT 6/30/2018 1/30/2018 2/16/2015 VELCO 345 kV New Haven substation N/A N N VT W F
464 2/17/2015 ETU 5/12/2014 1000 MW HVDC NA N/A Suffolk MA 6/30/2019 1/30/2019 2/16/2015 NMISA to NSTAR K Street 345 kV substation N/A N N BOST W F
463 2/17/2015 ETU 4/30/2014 425 MW HVDC Tie NA N/A Franklin VT 6/30/2018 1/30/2018 2/16/2015 HQ to VELCO Williston 115 kV substation N/A N N VT W F
462 4/12/2018 G 4/30/2014 wind WT WND 104 104 104 Aroostook ME 12/30/2020 9/15/2020 4/12/2018 Pittsfield 345KV NR N N PD BHE W F
461 4/12/2018 G 4/30/2014 Wind WT WND 104 104 104 Aroostook ME 12/30/2018 9/15/2018 4/12/2018 Pittsfield 345KV NR N N PD BHE W F
460 4/12/2018 G 4/29/2014 Wind WT WND 104 104 104 Aroostook ME 12/30/2020 9/15/2020 4/12/2018 Pittsfield 345KV NR N N PD BHE W F
459 4/12/2018 G 4/29/2014 Wind WT WND 104 104 104 Aroostook ME 12/30/2020 9/15/2020 4/12/2018 Pittsfield 345KV NR N N PD BHE W F
458 4/12/2018 G 4/28/2014 Wind WT WND 104 104 104 Aroostook ME 12/30/2020 9/15/2020 4/12/2018 Pittsfield 345KV NR N N PD BHE W F
457 11/19/2014 ETU 4/17/2014 500 MW HVDC Tie NA N/A Chittenden VT 12/31/2017 12/31/2017 11/18/2014 HQ to VELCO 115 kV Essex substation N/A N N VT W F
456 2/13/2015 ETU 4/17/2014 1200 MW HVDC Tie NA N/A Middlesex MA 12/31/2017 12/31/2017 2/12/2015 HQ to NSTAR 345 kV Mystic substation N/A N N BOST W F
455 2/17/2015 ETU 4/17/2014 1000 MW HVDC Tie NA N/A Windsor VT 12/31/2017 12/31/2017 2/16/2015 HQ to VELCO 345 kv Coolidge substation N/A N N VT W F
454 6/21/2016 G 4/7/2014 Wind Increase (see Q452) WT WND 0.8 85.8 85.8 Somerset ME 12/30/2018 11/30/2018 6/17/2016 Harris substation near the Town of Jackman and Misery Township Somerset County, Maine NR N N PD ME W F
453 6/11/2014 G 3/31/2014 Offshore Wind WT WND 10 10 10 Lincoln ME 11/13/2017 9/11/2017 6/11/2014 CMP Bristol Substation, Bristol Maine NR N N ME W F
452 6/21/2016 G 3/4/2014 Wind WT WND 85 85 85 Somerset ME 12/30/2018 11/30/2018 6/17/2016 Harris substation near the Town of Jackman and Misery Township Somerset County, Maine NR N N PD ME W F
451 5/21/2014 G 3/4/2014 Combined Cycle CC DFO NG 100 345 345 Fairfield CT 5/31/2018 5/1/2018 5/21/2014 NU/CL&P Norwalk Harbor 115kV substation CNR N N NOR W F
450 5/21/2014 G 3/4/2014 Combustion Turbine GT DFO 245 245 245 Fairfield CT 5/31/2018 5/1/2018 5/21/2014 NU/CL&P Norwalk Harbor 115kV Substation CNR N N NOR W F
449 6/17/2019 G 3/4/2014 Canal 3 GT DFO NG 333 333 336.2 Barnstable MA 6/15/2019 4/1/2019 NU/NStar 345kV Canal Substation CNR Y Y ISO-NE SEMA C F
448 6/11/2014 G 3/4/2014 Fuel Cell FC NG 5.6 5.6 5.6 New London CT 5/31/2018 5/1/2018 6/11/2014 NU/CL&P Montville substation, 4160V station service bus CNR N N CT W F
447 8/29/2024 G 3/4/2014 Passadumkeag Windpark CNR Only WT WND 0 39.975 39.975 Penobscot ME 7/1/2016 4/12/2016 115kV line between James River and Enfield substations on Line 64 NR N N BHE C F
446 4/1/2014 G 3/4/2014 Gas Turbine GT DFO NG 47.5 59.5 59.5 Chittenden VT 5/31/2018 3/31/2018 3/31/2014 Gorge substation, No. 16, Breaker 3320. CNR N N VT W F
445 3/2/2015 G 3/4/2014 Gas Turbine GT DFO NG 103.5 103.5 103.5 Norfolk MA 5/31/2018 2/1/2018 3/2/2015 Edgar 115 kV Station CNR N N PD SEMA W F
444 5/2/2019 G 5/2/2014 Medway Peaker - SEMARI GT DFO NG 207.7 207.7 207.7 Norfolk MA 3/14/2019 2/8/2019 Medway 115 kV station CNR Y Y ISO-NE PD SEMA C F
443 5/25/2017 G 3/3/2014 Brockton Combined Cycle CNR Increase CC NG 0 354.9 383.9 Plymouth MA 5/31/2019 1/25/2019 5/25/2017 Grid 115 kV E20 and F19 Lines NR N N SEMA W F
442 12/29/2015 G 2/26/2014 Combined Cycle CC DFO NG 387.9 387.9 422.1 Hampden MA 3/1/2019 6/1/2018 12/28/2015 115kV Line 1302 between Buck Pond and Pochassic substations, approximately 1 mile south of Buck Pond. CNR Y Y ISO-NE WMA W F
441 11/26/2018 G 2/25/2014 Glendale Hydroelectric Expansion Project HD WAT 0.2 0.1856 0.1856 Berkshire MA 11/13/2018 11/7/2018 GRID 13.8 kV CNR Y N NGRID WMA C F
440 5/8/2018 G 2/24/2014 Wallingford Energy Center GT NG 100 350 350 New Haven CT 5/9/2018 12/7/2017 CMEEC 115 kV Wallingford Substation Generating facility. CNR Y Y ISO-NE SWCT C F
439 2/12/2015 G 2/24/2014 Simple Cycle GT NG 478 478 483 Essex MA 5/1/2018 1/1/2018 2/12/2015 GRID Ward Hill – Tewksbury 345 kV line, approximately 1.8 miles from the Ward Hill CNR N N CMA W F
438 5/31/2017 G 2/24/2014 Potter Repowering GT NG -21.2 63.27 65.25 Norfolk MA 5/22/2019 2/22/2019 5/31/2017 BELD Station 16 Switchyard NR Y Y ISO-NE SEMA W F
437 6/15/2022 G 2/10/2014 Jericho Wind expansion WT WND 3.5 Coos NH 1/23/2016 10/16/2015 PSNH Berlin Substation Bus 1 Breaker 3521. CNR Y Y ISO-NE NH C F
436 11/7/2014 G 2/5/2014 Gas Turbine (alt. to QP412) GT DFO NG 0 335 335 Fairfield CT 5/31/2018 2/1/2018 11/7/2014 345 kV generator side connection to the transmission grid. CNR Y N ISO-NE PD SWCT W F
435 1/19/2018 G 1/31/2014 Wind WT WND 103.5 103.5 103.5 Washington ME 12/31/2018 9/30/2018 1/19/2018 Bangor Hydro Epping Substation, Columbia, Washington County, ME NR N N PD BHE W F
434 2/17/2015 ETU 1/29/2014 Expand Interface NA N/A Aroostook ME 11/1/2017 9/1/2017 2/16/2015 TBD N/A N N BHE W F
433 4/30/2014 G 1/24/2014 MATEP (Combined Cycle) Increase CC DFO NG 1.7 62.083 66 Suffolk MA 4/21/2014 3/21/2014 At existing point of interconnection for MATEP (Combined Cycle) CNR N N BOST C F
432 3/28/2017 ETU 1/21/2014 115 KV ETU NA N/A Aroostook ME 7/31/2017 7/31/2017 5/14/2014 MPS 69 kV Mullen substation to ME Gen Lead 115 kV line N/A N N BHE W N
431 1/29/2014 TS 1/14/2014 Local Transmission Service - 99 MW NA N/A 0 0 0 Coos NH 1/1/2015 1/1/2015 1/28/2014 NA N/A N N NH W F
430 2/17/2015 ETU 1/13/2014 Coos ETU NA N/A Coos NH 7/1/2016 7/1/2016 2/16/2015 TBD N/A N N NH W F
429 1/10/2014 G 12/2/2013 Offshore Wind WT WND 12 12 12 Lincoln ME 11/6/2017 10/2/2017 1/10/2014 Central Maine Power, Bristol Substation, Bristol Maine NR N N ME W F
428 2/17/2015 ETU 11/15/2013 1200 MW AC to HVDC Tie NA N/A Middlesex MA 3/31/2019 1/1/2019 2/16/2015 NB 345 Keswick or St. Andre substation to GRID 345 kV Wakefield substation N/A N N BOST W F
427 2/17/2015 ETU 10/15/2013 1000 MW HVDC Tie V3 (See Q425) NA N/A Addison VT 12/31/2018 10/31/2018 2/16/2015 HQ 735 kV substation to Velco 345 kV New Haven substation N/A N N VT W F
426 2/17/2015 ETU 10/15/2013 1000 MW HVDC Tie V2 (See Q425) NA N/A Rutland VT 12/31/2018 10/31/2018 2/16/2015 HQ 735 kV substation to Velco 345 kV W. Rutland Substation N/A N N VT W F
425 2/17/2015 ETU 9/23/2013 1000 MW HVDC Tie V1 NA N/A Windsor VT 12/31/2018 10/31/2018 2/16/2015 HQ 735 kV substation to Velco 345 kV Coolidge substation N/A N N VT W F
424 11/6/2013 G 9/11/2013 Hydro Increase HW WAT 0.1 0.65 0.65 Hampden MA 1/1/2014 1/1/2014 11/5/2013 HGE 115 kV North Canal substation CNR N N WMA W F
423 3/12/2014 G 9/10/2013 Wind WT WND 74.29 74.29 74.29 Merrimack/Grafton NH 12/31/2016 10/1/2016 3/12/2014 A201 Comerford - North Litchfield 230 kV line CNR N N NH W F
422 5/14/2019 G 7/26/2013 Number Nine Wind Farm CNR WT WND 0 250 250 Aroostook ME 10/31/2021 4/5/2021 5/13/2019 MEPCO line in Haynesville, ME NR N N BHE W F
421 4/11/2017 G 7/18/2013 Spruce Ridge Wind CNR (see Q390) WT WND 0 50.82 50.82 Grafton NH 10/31/2017 8/18/2017 4/10/2017 NGRID 230 kV Comerford/Dunbarton Line NR N N NH W F
420 12/14/2020 G 7/15/2013 Weaver Wind WT WND 72.6 72.6 72.6 Hancock ME 12/12/2020 10/13/2020 Bull Hill Switching Station NR Y Y ISO-NE PD BHE C F
419 7/3/2014 G 5/2/2013 Wind WT WND 33 33 33 Franklin ME 11/1/2016 10/1/2016 7/2/2014 CMP 115 kV Bigalow Substation NR N N PD ME W F
418 2/14/2014 G 5/1/2013 Biomass ST DFO WDS 37 37 37 Windsor VT 8/30/2015 6/30/2015 2/14/2014 GMP L97 Line CNR N N BL VT W F
417 5/14/2019 G 4/25/2013 Number Nine Wind Farm WT WND 250 250 250 Aroostook ME 10/31/2021 4/5/2021 5/13/2019 Pittsfield 345KV NR Y Y ISO-NE PD BHE W F
416 11/12/2013 G 4/23/2013 Wind WT WND 18 18 18 Coos NH 4/30/2017 4/12/2017 7/17/2013 Pontook Hydro CNR N N NH W F
415 1/25/2016 G 4/12/2013 Jericho Wind WT WND 8.55 8.55 8.55 Coos NH 1/23/2016 10/16/2015 PSNH Berlin Substation CNR Y Y ISO-NE BL NH C F
414 6/24/2014 G 3/26/2013 EP Newington Energy Capacity Increase CC NG 21.2 568.2 594.8 Rockingham NH 6/17/2014 5/31/2014 PSNH Newington 345 kV substation CNR Y Y ISO-NE BL NH C F
413 2/17/2015 ETU 3/4/2013 Keene Rd ETU NA N/A 0 0 Penobscot ME 3/1/2016 11/1/2015 2/16/2015 BHE Keene Road Substation N/A N N BHE W F
412 6/10/2019 G 2/28/2013 PSEG Bridgeport Harbor CCGT Expansion CC DFO NG 509.6 509.6 532.6 Fairfield CT 6/10/2019 5/11/2019 UI 345 kV Singer CNR Y Y ISO-NE BL SWCT C F
411 7/16/2014 G 2/28/2013 Gas Turbine Increase GT DFO NG 10.9 39.4 45.8 Essex MA 12/31/2013 12/31/2013 Peabody B-154S line NA N Y BOST C N
410 9/2/2014 G 2/28/2013 Wind CNR WT WND 0 48 48 Peneobscot/Washington ME 8/1/2016 6/1/2016 8/25/2014 BHE Keene Rd CNR N N BHE W F
409 3/2/2015 G 2/28/2013 Gas Turbine GT DFO NG 207.7 207.7 204.4 Norfolk MA 5/31/2018 2/1/2018 3/2/2015 NSTAR 230 kV W. Medway Station CNR N N BL BOST W F
408 3/23/2016 G 2/28/2013 Gas Turbine GT DFO NG 207.7 207.7 204.4 Middlesex MA 5/31/2018 2/1/2018 3/17/2016 NSTAR 345 kV Mystic Station NR Y N PD BOST W F
407 9/16/2015 G 2/27/2013 Saddleback Increase and CNR (see Q287) WT WND 1.2 34.2 34.2 Franklin ME 9/15/2015 8/15/2015 CMP Ludden Lane Substation CNR N N ME C F
406 11/29/2017 G 2/22/2013 Canton Increase and CNR (see Q300) WT WND 3.55 22.8 22.8 Oxford ME 11/29/2017 10/18/2017 CMP Ludden Lane Substation NR N N ME C F
405 12/9/2016 G 1/18/2013 Block Island Wind Farm WT WND 29 29 29 Washington RI 12/9/2016 11/4/2016 Grid 34.5 kV NA Y Y NGRID RI C N
404 6/30/2017 G 1/8/2013 MATEP -3rd CTG GT DFO NG 14.15 100 105.6 Suffolk MA 6/28/2017 12/1/2016 NSTAR Brighton substation CNR Y Y ISO-NE BL BOST C F
403 12/16/2016 G 12/6/2012 Pisgah Mountain Increase (see Q349) WT WND 0.075 9.075 9.075 Penobscot ME 12/16/2016 11/1/2016 BHE Line 66 NR N N BHE C F
402 1/17/2014 G 10/16/2012 Mechanicsville Hydro Increase HD WAT 0.31 0.31 0.31 Windham CT 3/1/2013 3/1/2013 CL&P 23 kV at Mechanicsville CNR N N CT C F
401 12/11/2014 G 10/5/2012 Wind WT WND 19.8 19.8 19.8 Washington ME 12/31/2014 11/30/2014 8/14/2014 BHE Epping 115 kV substation or BHE 34.5 kV CNR N N PD BHE W F
400 4/19/2018 G 10/3/2012 Downeast Wind WT WND 90 90 90 Washington ME 10/3/2019 7/18/2019 4/19/2018 BHE Epping Substation NR Y Y ISO-NE PD BHE W F
399 2/27/2013 G 10/1/2012 Wind Increase WT WND 1.2 34.2 34.2 Franklin ME 8/15/2014 6/2/2014 2/27/2013 CMP Ludden Lane Substation CNR N N ME W F
398 11/15/2013 G 9/4/2012 Dighton Power Uprate CC NG 5 180 197 Bristol MA 12/5/2013 12/5/2013 GRID 115 kV U6 Line CNR Y Y ISO-NE CD SEMA C F
397 12/14/2016 G 8/30/2012 Hancock Wind Project WT WND 51 51 51 Hancock ME 12/14/2016 10/1/2016 BHE Line 66 - Bull Hill substation NR Y Y ISO-NE PD BHE C F
396 1/7/2020 G 8/28/2012 Berkshire Wind Increase WT WND 4.6 19.6 19.6 Berkshire MA 11/19/2019 9/25/2019 WMECO 23 kV from Partridge substation NR Y N NU BL WMA C F
395 10/24/2012 G 7/30/2012 Solar PV SUN 2.18 2.18 2.18 Windham VT 6/1/2013 5/15/2013 10/24/2012 CVPS 46 kV CNR N N VT W F
394 12/23/2013 G 7/25/2012 Bridgeport Fuel Cell I FC NG 5.6 5.6 5.6 Fairfield CT 12/22/2013 11/24/2013 UI 13.8 kV Ash Creek substation NA Y Y UI SWCT C N
394 12/23/2013 G 7/25/2012 Bridgeport Fuel Cell 2 FC NG 5.6 5.6 5.6 Fairfield CT 12/22/2013 11/24/2013 UI 13.8 kV New Congress I substation NA Y Y UI SWCT C N
394 12/23/2013 G 7/25/2012 Bridgeport Fuel Cell 3 FC NG 4.15 4.15 4.15 Fairfield CT 12/22/2013 11/24/2013 UI 13.8 kV New Congress II Substation NA Y Y UI SWCT C N
393 10/28/2015 G 5/7/2012 Wind WT WND 84 84 84 Somerset ME 11/1/2016 10/1/2016 10/28/2015 CMP 115 kV W. S. Wyman Hydro Substation NR N N PD ME W F
392 7/23/2012 G 3/28/2012 Wind WT WND 2.7 2.7 2.7 Coos NH 10/29/2012 10/15/2012 7/11/2012 PSNH 12.47 kV CNR N N NH W F
391 10/9/2015 G 2/2/2012 Weston Station Uprate U4 HD WAT 1.6 14.806 14.806 Somerset ME 7/31/2015 7/30/2015 CMP 34.5 kV Weston Substation CNR Y Y ISO-NE BL ME C F
391 12/17/2013 G 2/2/2012 Weston Station GSU/AVR Replacement U1 HD WAT 0 14.806 14.806 Somerset ME 12/14/2013 12/14/2013 CMP 34.5 kV Weston Substation CNR Y Y ISO-NE BL ME C F
391 10/9/2015 G 2/2/2012 Weston Station AVR Replacement U2-4 HD WAT 0 14.806 14.806 Somerset ME 7/31/2015 7/30/2015 CMP 34.5 kV Weston Substation CNR Y Y ISO-NE BL ME C F
390 4/11/2017 G 1/30/2012 Spruce Ridge Wind Farm WT WND 50.82 50.82 50.82 Grafton NH 10/31/2017 9/18/2017 4/10/2017 NGRID 230 kV Comerford/Dunbarton Line NR Y Y ISO-NE PD NH W F
389 3/23/2012 G 1/17/2012 Solar PV SUN 5.04 5.04 5.04 Fairfield CT 5/31/2013 3/31/2013 3/23/2012 CL&P 115 kV Norwalk Harbor Substation CNR N N NOR W F
388 3/26/2013 G 1/13/2012 Combined Cycle CC NG 680 680 700 Fairfield CT 5/31/2016 3/1/2016 3/19/2013 UI 115 kV or 345 kV N N PD SWCT W F
387 3/26/2013 G 1/13/2012 Gas Turbine Increase GT NG 13.5 250 250 New Haven CT 2/28/2013 2/28/2013 3/22/2013 CMEEC 115kV Wallingford Substation N Y SWCT W F
387 5/31/2018 G 1/13/2012 Footprint Combined Cycle Unit CC NG 715.6 715.6 715.6 Essex MA 5/31/2018 12/22/2017 NGRID 115 kV Salem Harbor Substation CNR Y Y NGRID BL BOST C F
386 2/5/2013 G 1/12/2012 Westbrook Energy Center Expansion CC NG 9.5 538 597 York ME 1/31/2013 1/31/2013 CMP 115 kV Westbrook Substation CNR Y Y ISO-NE CD SME C F
385 5/21/2014 G 1/6/2012 Wind WT WND 60 60 60 Calendonia and Essex VT 12/1/2015 9/1/2015 5/21/2014 VELCO 115 kV Lyndonville substation CNR N N PD VT W F
384 5/21/2018 G 12/29/2011 CPV Towantic Energy Center CC DFO NG 745 745 775 New Haven CT 5/21/2018 1/24/2018 CL&P 115 kV CNR Y Y ISO-NE PD SWCT C F
383 7/26/2013 G 12/22/2011 Wind WT WND 198 198 198 Franklin ME 10/31/2016 10/31/2015 7/26/2013 CMP Roxbury substation CNR N N PD ME W F
382 11/20/2012 G 12/5/2011 Wind WT WND 79.86 79.86 79.86 Oxford ME 10/31/2014 7/31/2014 11/20/2012 CMP 115 kV Rumford to Livermore Line CNR N N PD ME W F
381 10/21/2013 G 11/14/2011 Wind WT WND 11.9 11.9 11.9 Lincoln ME 9/15/2017 9/1/2017 10/21/2013 CMP 34.5 kV Boothbay Substation CNR Y N CMP BL ME W F
380 2/17/2015 ETU 11/10/2011 1000 MW HVDC Line NA N/A N/A MA 6/1/2020 1/1/2020 2/16/2015 NSTAR Carver 345 kV N/A N N SEMA W F
380 2/17/2015 ETU 11/10/2011 1000 MW HVDC Line NA N/A N/A MA 6/1/2020 1/1/2020 2/16/2015 NSTAR Barnstable 345 kV N/A N N SEMA W F
379 9/2/2014 G 10/19/2011 CornerStone Power Monson 2 PV SUN 4.92 4.92 4.92 Hampden MA 11/1/2014 10/15/2014 8/12/2014 GRID 69 kV N14 Line NR Y Y ISO-NE BL WMA W F
379 9/2/2014 G 10/19/2011 CornerStone Power Monson 3 PV SUN 4.92 4.92 4.92 Hampden MA 11/1/2014 10/15/2014 8/12/2014 GRID 69 kV N14 Line NR Y Y ISO-NE BL WMA W F
378 11/15/2013 ETU 10/18/2011 HVDC Line NA N/A 0 N/A MA 12/31/2015 12/31/2015 11/15/2013 MEPCO 345 kV at Haynesville or MPC 345 KV/GRID 115 N/A N N BOST W F
377 12/23/2016 G 9/14/2011 Harrington Street PV Project (QF) PV SUN 9.75 9.75 9.75 Worcester MA 12/23/2016 2/8/2016 GRID 69 kV NA Y Y NGRID WMA C N
376 7/30/2012 G 9/8/2011 Algonquin Power Windsor Locks CNR Increase IC NG 0 0 0 Hartford CT 7/20/2012 6/28/2012 CL&P Windsor Locks 23 kV Substation CNR Y Y ISO-NE BL CT C F
375 9/27/2013 G 9/7/2011 Wind WT WND 80 80 80 Merrimack/Grafton NH 12/31/2014 9/30/2014 9/27/2013 GRID Comerford/Merrimack 230 kV Line CNR N N BL NH W F
374 6/7/2012 G 8/24/2011 Brayton Pt. 1 Exciter Replacement ST BIT 0 0 0 Bristol MA 5/20/2012 5/12/2012 GRID 345 kV Brayton Pt Switchyard CNR Y Y ISO-NE RI C F
374 1/28/2014 G 8/24/2011 Brayton Pt. 2 Exciter Replacement ST BIT 0 0 0 Bristol MA 5/30/2014 5/22/2014 12/4/2013 GRID 345 kV Brayton Pt Switchyard CNR Y Y ISO-NE BL RI W F
373 9/21/2012 G 8/12/2011 CC Administrative Increase CC DFO NG 0 478 550 Hampden MA 9/21/2012 WMECO Ludlow 19S substation CNR N N WMA W F
372 1/7/2014 G 8/3/2011 Skelton Station Modernization Phase 1 HD WAT 1.083 21.083 21.083 York ME 12/28/2013 12/19/2013 CMP 34.5 kV Louden substation CNR Y Y ISO-NE ME C F
372 1/7/2014 G 8/3/2011 Skelton Station Modernization Phase 2 HD WAT 1.083 22.2 22.2 York ME 12/28/2013 12/14/2013 CMP 34.5 kV Louden substation CNR Y Y ISO-NE BL ME C F
371 8/6/2013 G 8/1/2011 Wind WT WND 33 33 33 Hillsborough NH 7/31/2015 6/30/2015 8/6/2013 PSNH L163 115 kV CNR Y Y ISO-NE PD NH W F
370 10/15/2012 G 7/1/2011 Shepaug AVR Upgrade HW WAT 0 0 0 New Haven CT 10/16/2012 9/23/2012 CL&P 69 kV bus at Shepaug CNR Y Y ISO-NE SWCT C F
369 11/29/2011 G 6/8/2011 Combined Cycle CC NG 745 745 775 Fairfield CT 6/1/2016 1/1/2016 11/28/2011 NU 345 kV Line CNR N N NOR W F
368 6/10/2014 G 5/27/2011 Wind WT WND 10 10 10 Hillsborough NH 9/30/2012 9/1/2012 8/23/2011 PSNH 7.2 kV to Milford Substation CNR N N NH W F
368 7/25/2013 G 5/27/2011 Wind WT WND 16.1 16.1 16.1 Hillsborough NH 10/31/2014 10/1/2014 7/25/2013 PSNH 34.5 kV to Monadnock substation CNR Y Y ISO-NE CD NH W F
367 11/19/2012 G 5/26/2011 Kingdom Community Wind Increase (see Q311) WT WND 3.075 64.575 64.575 Orleans VT 12/16/2012 8/29/2012 VEC Lowell 46 kV station CNR Y Y ISO-NE VT C F
366 3/30/2016 G 5/23/2011 Wyman Hydro Uprate U1 HW WAT 2.5 30 30 Somerset ME 3/30/2016 3/24/2016 CMP 115 kv Wyman CNR Y Y ISO-NE PD ME C F
366 3/25/2015 G 5/23/2011 Wyman Hydro Uprate U2 HW WAT 0 29.9 29.9 Somerset ME 3/23/2015 3/23/2015 CMP 115 kV Wyman CNR Y Y ISO-NE PD ME C F
366 3/30/2016 G 5/23/2011 Wyman Hydro Uprate U3 HW WAT 4.3 30 30 Somerset ME 3/30/2016 3/24/2016 CMP 115 kV Wyman CNR Y Y ISO-NE PD ME C F
365 11/14/2011 G 4/27/2011 Bridgeport Harbor #3 CNR Increase ST DFO SUB 5 385 385 Fairfield CT 10/31/2011 UI Pequonnock 115 kV substation CNR N Y SWCT C F
364 5/26/2011 G 4/7/2011 Solar PV SUN 4.92 4.92 4.92 Hampden MA 3/31/2012 3/1/2012 5/18/2011 GRID 69kV N-14 Line CNR N N WMA W F
363 7/29/2011 G 3/31/2011 Solar PV SUN 6 6 6 Bristol MA 12/31/2012 9/30/2012 7/29/2011 NSTAR 115 kV or 13.2 kV CNR N N SEMA W F
362 11/17/2011 G 3/22/2011 Milford Hydro Expansion Increase (Q358) HD WAT 0.183 9.083 9.083 Penobscot ME 11/4/2011 11/1/2011 BHE Milford substation CNR Y Y BHE BHE C F
361 5/19/2014 G 3/14/2011 Grandpas Knob Wind WT WND 20 20 20 West Rutland VT 12/31/2016 9/30/2016 5/19/2014 VELCO W Rutland 115 kV Substation NR Y Y ISO-NE BL VT W F
360 8/3/2011 G 3/14/2011 Indian River Power Supply CNR HD WAT 0 1.3 1.3 Hampden MA 8/2/2011 WMECO 23 kV circuit CNR N N WMA C F
360 1/13/2015 G 3/14/2011 Turners Falls Hydro CNR HD WAT 0 0.95 0.95 Franklin MA 5/29/2012 5/29/2012 WMECO 13.8 kV NR N N BL WMA C F
360 1/11/2012 G 3/14/2011 Woronoco Hydro CNR HD WAT 0 2.7 2.7 Hampden MA 1/6/2012 WMECO 23 kV CNR N N WMA C F
359 6/9/2020 G 3/7/2011 Bear Swamp AVR/PSS Unit 2 PS WAT 0 0 0 Franklin and Berkshire MA 7/13/2011 6/30/2011 GRID Bear Swamp 230 kV substation CNR Y Y ISO-NE WMA C F
359 3/9/2012 G 3/7/2011 Bear Swamp AVR/PSS Unit 1 PS WAT 0 0 0 Franklin and Bershire MA 3/8/2012 3/6/2012 Bear Swamp 230 kV substation CNR Y Y ISO-NE WMA C F
358 11/17/2011 G 3/4/2011 Milford Hydro Expansion HD WAT 2.5 8.9 8.9 Penobscot ME 11/4/2011 11/1/2011 BHE Milford Substation CNR Y Y BHE BHE C F
358 10/26/2016 G 3/4/2011 Medway Hydro Expansion HD WAT 0.6 4.003 4.003 Penobscot ME 4/4/2012 4/4/2012 BHE Medway substation CNR Y Y BHE BHE C F
358 10/6/2011 G 3/4/2011 Hydro HD WAT 2.274 2.274 2.274 Penobscot ME 8/15/2012 8/1/2012 10/5/2011 BHE Stillwater 12.5 kV substation CNR N N BHE W F
358 4/12/2011 G 3/4/2011 Hydro HD WAT 3.858 3.858 3.858 Penobscot ME 8/15/2012 8/1/2012 4/11/2011 BHE Orono 12.5 kV substation CNR N N BHE W F
357 7/1/2016 G 2/24/2011 Passadumkeag Windpark WT WND 39.975 39.975 39.975 Penobscot ME 5/23/2016 4/12/2016 BHE 115 kV between Enfield and James River Substat NR Y Y ISO-NE PD BHE C F
356 6/26/2012 G 2/4/2011 Altresco Increase (winter) CC DFO NG 0 160 192.5 Berkshire MA 6/29/2012 WMECO Doreen 19A substation CNR Y Y ISO-NE BL WMA C F
355 12/4/2012 ETU 1/27/2011 HVDC Tie NA N/A N/A 6/30/2016 12/4/2012 UI Singer 345 kV substation to LIPA Pt Jefferson 1 N/A N N W F
354 2/7/2011 G 1/12/2011 Combined Cycle Increase CC DFO NG 20.2 157.3 185.2 Berkshire MA 4/1/2011 2/4/2011 WMECO Doreen 19A Substation CNR N N WMA W F
353 8/8/2012 G 12/21/2010 Wind WT WND 9.9 9.9 9.9 Plymouth MA 12/31/2013 11/30/2013 8/8/2012 NSTAR 115 kV Valley substation CNR Y N ISO-NE BL SEMA W F
353 6/9/2011 G 12/21/2010 Wind WT WND 14.9 14.9 14.9 Barnstable MA 11/30/2012 10/31/2012 6/7/2011 NSTAR 115 kV Valley substation CNR N N SEMA W F
352 5/26/2011 G 12/14/2010 Salem Harbor Station Increase ST BIT RFO 8 750.58 753.07 Essex MA Salem Switchyard CNR N N BOST C F
351 1/11/2012 G 12/3/2010 Gulf Island Unit 2 Increase HW WAT 4.4 38.915 38.915 Androscoggin ME 4/26/2011 4/26/2011 CMP Gulf Island 115 kV CNR N Y SME C F
350 10/1/2015 G 11/10/2010 Wind WT WND 92.25 92.25 92.25 Washington ME 12/31/2015 10/1/2015 11/15/2013 BHE Washington County 115 kV substation NR N N PD BHE W F
350 10/5/2015 G 11/10/2010 Wind WT WND 96.9 96.9 96.9 Somerset ME 12/31/2016 10/1/2016 10/5/2015 CMP Wyman substation NR Y N ISO-NE PD ME W F
349 12/16/2016 G 10/20/2010 Pisgah Mountain WT WND 9 9 9 Penobscot ME 12/16/2016 11/1/2016 BHE Line 66 NR Y Y ISO-NE PD BHE C F
348 2/17/2015 ETU 10/13/2010 1090 MW HVDC Tie - Import Only NA N/A N/A NH 6/1/2018 5/1/2018 2/16/2015 HQ Des Cantons substation to PSNH Deerfield substa N/A Y Y NU NH W F
347 2/13/2014 G 10/7/2010 Bucksport G5 ST WDS 25 25 25 Hancock ME 11/15/2012 10/25/2012 CMP 115 kV NR Y Y ISO-NE BL ME C F
346 4/7/2015 G 10/1/2010 Burgess BioPower Increase ST WDS 9 67.5 67.5 Coos NH 6/17/2014 10/25/2013 PSNH Eastside (Berlin) Substation CNR Y Y ISO-NE PD NH C F
345 12/27/2012 G 9/8/2010 Groton Wind Farm WT WND 48 48 48 Grafton NH 12/28/2012 10/31/2012 PSNH Beebe River 115 kV Substation CNR Y Y ISO-NE PD NH C F
344 9/30/2011 G 9/7/2010 Mass Power Increase CC NG 5 256.3 279.89 Hampden MA 9/30/2011 9/30/2011 NU 115 kV Shawanigan CNR N Y WMA C F
343 3/21/2012 G 8/10/2010 Operating change ST NUC 0 0 0 Plymouth MA 3/21/2012 NSTAR 342 & 355 Line/345 switchyard NA N N BL SEMA W F
342 6/9/2011 G 7/21/2010 Manchester Street Station Exciter Upgrades & incre CC NG 12 483 510 Providence RI 6/14/2011 2/13/2011 GRID 115 kV Franklin substation CNR Y Y ISO-NE CD RI C F
341 11/15/2013 ETU 7/19/2010 HVDC Line NA N/A 0 N/A MA 12/31/2014 12/31/2014 11/15/2013 MEPCO 345kV at Haynesville or MPC 345 kV/NSTAR 345 N/A N N BOST W F
340 3/31/2011 G 6/24/2010 Biomass ST WDS 33 33 33.3 Bennington VT 3/31/2013 12/31/2012 3/28/2011 CVPS East Pownal to Bennington 46 KV line CNR N N BL VT W F
339 7/22/2010 G 6/9/2010 Exciter Upgrades CC NG 0 441 492 Providence RI 3/7/2011 2/13/2011 7/21/2010 GRID 115 kV Franklin substation NA N N RI W F
338 11/19/2012 G 5/14/2010 Wind WT WND 0 18 18 Hillsborough NH 12/3/2013 11/2/2013 11/19/2012 PSNH 34.5 kV 3140 Circuit NA N N NH W N
337 1/20/2012 G 5/14/2010 Verso Androscoggin Energy Cogen 1, 2, & 3 Increase CC KER NG 26 147 180 Franklin ME 1/13/2012 CMP Section 227 CNR Y Y ISO-NE BL ME C F
336 8/4/2010 G 5/14/2010 Manchester Street Station increase CC NG 0 471 492 Providence RI 8/2/2010 GRID 115 kV Franklin substation CNR N N RI C F
335 6/30/2011 G 5/14/2010 Biomass ST WDS 18.1 18.1 18.1 Hancock ME 3/1/2012 2/1/2012 6/30/2011 CMP 115 kV CNR Y N CD ME W F
334 3/21/2011 G 5/14/2010 Wind WT WND 30 30 30 Hampden MA 12/31/2012 10/1/2012 3/17/2011 Section #175 115kV line from Palmer to Little Rest CNR N N BL WMA W F
333 12/13/2016 G 5/14/2010 Bingham Wind WT WND 184.8 184.8 184.8 Somerset ME 12/13/2016 8/15/2016 CMP Guilford Substation CNR Y Y ISO-NE PD ME C F
332 2/19/2013 G 5/13/2010 RISEP Increase CC NG 66 613 625 Providence RI 11/12/2012 11/15/2011 115 kV RISE substation NR Y Y ISO-NE BL RI C F
331 1/10/2011 G 5/13/2010 Waterbury Generation Increase GT NG 7.5 103.6 103 New Haven CT 10/12/2010 9/30/2010 CL&P Baldwin 115 kV substation CNR N Y SWCT C F
331 5/31/2016 G 5/13/2010 Kendall #3 Back Pressure Steam Turbine ST DFO NG 7.5 28.5 28.4 Middlesex MA 5/31/2016 5/31/2016 115 kV Line 875-539 to NSTAR 875 substation CNR N Y BOST C F
330 6/9/2015 G 5/10/2010 Fair Haven Biomass ST WDS 33 33 33.3 Rutland VT 3/30/2016 1/29/2016 6/9/2015 CVPS 46 kV Castleton - Fair Haven NR Y Y ISO-NE BL VT W F
329 12/27/2012 G 5/7/2010 Georgia Mountain Community Wind WT WND 10 10 10 Chittenden VT 12/31/2012 12/20/2012 CVPS 34.5 kV Fairfax - Milton Line CNR Y Y ISO-NE BL VT C F
328 6/9/2020 G 5/6/2010 Douglas Woods Wind Units 1-11 WT WND 27.5 27.5 27.5 Worcester MA 10/1/2014 8/1/2014 9/5/2013 GRID 69 kV S19 at E. Webster Substation NR Y Y ISO-NE WMA W F
328 6/9/2020 G 5/6/2010 Douglas Woods Wind Unit 12 WT WND 2.5 30 30 Worcester MA 10/1/2014 8/1/2014 9/5/2013 GRID 69 kV S19 at E. Webster Substation NR Y Y ISO-NE WMA W F
327 8/26/2014 G 5/4/2010 Wind WT WND 48 48 48 Penobscot/Washington ME 9/1/2016 6/1/2016 8/25/2014 BHE Keene Rd Substation NR Y Y ISO-NE PD BHE W F
326 7/19/2010 G 4/8/2010 Solar PV SUN 19.92 19.92 19.92 Hampden MA 6/1/2012 4/1/2012 7/26/2010 GRID 69 kV N-14 Line CNR N N WMA W F
325 9/19/2011 G 2/10/2010 Wind WT WND 535.5 535.5 535.5 Washington RI 12/31/2015 9/30/2014 9/19/2011 GRID Brayton Point 345 kV substation NR N N BL RI W F
324 2/17/2015 ETU 1/22/2010 345kV Tie Line - Part 1 NA N/A N/A ME 12/1/2016 9/1/2016 2/16/2015 Houlton, ME to MEPCO Line N/A N N BHE W F
324 2/17/2015 ETU 1/22/2010 345 kV Tie Line - Part 2 NA N/A N/A ME 12/31/2016 9/1/2016 2/16/2015 MEPCO to Bridgewater, ME N/A N N BHE W F
323 7/30/2010 G 1/21/2010 Wind Increase (see QP290) WT WND 2 20 20 Oxford ME 12/30/2010 9/30/2010 7/29/2010 CMP Woodstock Substation CNR N N ME W F
323 12/21/2011 G 1/21/2010 Spruce Mountain Wind Increase WT WND 2 20 20 Oxford ME 12/21/2011 11/30/2011 CMP Woodstock substation NA N Y ME C N
322 6/29/2011 ETU 12/28/2009 345 kV Tie Line NA N/A N/A ME 7/1/2012 6/29/2011 Houlton to MEPCO Line N/A N N BHE W F
321 5/7/2014 G 12/24/2009 Rumford Falls Unit #3 increase HD WAT 1.3 44.1 44.1 Oxford ME 6/1/2010 6/1/2010 CMP 115 kV Rumford Substation CNR N N ME C F
320 11/1/2011 G 12/15/2009 Combined Cycle Repowering CC DFO NG 0 0 0 Fairfield CT 6/1/2014 1/1/2014 10/31/2011 Norwalk Harbor 115 kV station CNR N N CD NOR W F
319 6/9/2011 G 12/14/2009 Power Station Increase ST NUC 29 1253 1260 New London CT 11/30/2011 11/20/2011 6/9/2011 CL&P Millstone 345 kV substation CNR N N BL CT W F
318 5/13/2010 G 11/24/2009 Algonquin Power Windsor Locks Cogeneration Facilit GT DFO NG 0 47.5 47.5 Hartford CT 4/14/2010 4/14/2010 CL&P Windsor Locks Substation CNR N N CT C N
317 2/5/2013 G 11/4/2009 Bull Hill Wind Phase I WT WND 34.485 34.485 34.485 Hancock ME 10/31/2012 10/4/2012 BHE Line 66 NR Y Y ISO-NE PD BHE C F
317 8/22/2011 G 11/4/2009 Wind WT WND 46.8 81 81 Hancock ME 12/31/2013 10/1/2013 8/22/2011 BHE Line 66 CNR N N PD BHE W F
316 1/10/2011 G 11/2/2009 Red Shield Acquisition #5 GT NG WDS 9.5 26.15 27.25 Penobscot ME 10/4/2010 9/15/2010 BHE Line 5 - 46 kV CNR Y Y BHE ME C F
315 6/15/2012 G 10/20/2009 Cresent Hydroelectric Project Uprate HD WAT 0.667 1.667 1.667 Hampden MA 6/8/2012 WMECO 19J1 23 kV line CNR N N BL WMA C F
314 2/17/2015 ETU 10/16/2009 400 MW 150 kV HVDC Line NA N/A Colchester VT 6/1/2018 6/1/2018 2/16/2015 NYPA 230.115 kV substation in Plattsburg, NY to near VELCO 345 kV New Haven Substation N/A N N VT W F
314 12/3/2009 G 10/16/2009 Combined Cycle CC NG 410 410 455 Plymouth MA 5/1/2015 12/1/2014 12/2/2009 NSTAR 127 and 128 Lines or new 115 kV CNR N N SEMA W F
314 1/27/2010 TS 10/16/2009 RNS Application NA N/A Aroostook ME 12/1/2011 N/A N/A N N BHE W F
313 9/12/2012 G 10/8/2009 Gulf Island Unit 1 Increase HW WAT 0.975 33.945 34.175 Androscoggin ME 8/24/2012 8/23/2012 CMP Gulf Island 115 kV CNR N Y SME C F
313 5/10/2011 G 10/8/2009 Gulf Island Unit 3 Increase HW WAT 0.569 34.514 34.744 Androscoggin ME 4/26/2011 12/18/2010 CMP Gulf Island 115 kV CNR N Y SME C F
312 10/19/2011 G 9/18/2009 Biomass ST WDS 20 20 20 Cheshire NH 10/30/2013 6/30/2013 10/18/2011 PSNH 34.5 kV to Winchester substation CNR N N CD NH W F
311 11/19/2012 G 9/15/2009 Kingdom Community Wind WT WND 61.5 61.5 61.5 Orleans VT 11/16/2012 8/29/2012 VEC Lowell 46 kV station CNR Y Y ISO-NE PD VT C F
310 11/15/2012 G 9/10/2009 Kibby Wind Expansion WT WND 33 33 33 Franklin ME 10/15/2014 9/1/2014 11/15/2012 Section 267 to CMP Bigalow CNR Y Y ISO-NE PD ME W F
309 9/28/2009 G 9/1/2009 Hydro Uprate HD WAT 0.975 34.038 34.038 Lewiston ME 12/1/2009 11/1/2009 9/28/2009 CMP Gulf Island 115 kV CNR N N ME W F
308 8/8/2011 G 8/28/2009 Wind WT WND 28.8 28.8 28.8 Washington RI 12/31/2012 9/30/2012 8/8/2011 NGRID 3302 Feeder NR N N CD RI W F
307 5/30/2012 G 7/14/2009 Diesel IC DFO 9.125 9.125 9.125 Essex VT 5/30/2013 4/1/2013 5/30/2012 NGRID 34.5 kV Moore/Gilman Line CNR Y N ISO-NE CD VT W F
307 9/28/2009 G 7/14/2009 Wind Expansion WT WND 45 45 45 Franklin ME 10/31/2011 9/1/2011 9/10/2009 Section 267 NR N N ME W F
306 8/4/2010 G 7/13/2009 Hydro HD WAT 3.35 3.35 3.35 Hampden MA 4/1/2014 1/1/2014 8/4/2010 HG&E Prospect 24B substation CNR N N WMA W F
306 1/18/2013 G 7/13/2009 Overflow #3 HD WAT 0.5 0.5 0.5 Hampden MA 11/30/2013 10/31/2013 HG&E Holyoke Substation CNR N N WMA W F
305 11/19/2015 G 7/10/2009 Internal Combustion IC DFO 10 15.5 15.5 Dukes MA 5/31/2013 4/30/2013 10/20/2009 NSTAR 23 kV Edgartown0Vineyard Haven Rd Line CNR N N SEMA W F
305 7/29/2011 G 7/10/2009 Wind WT WND 66 66 66 Grafton/Merrimack NH 12/31/2012 10/1/2012 7/29/2011 Pemigewassett 115 kV Substation CNR N N PD NH W F
305 7/29/2011 G 7/10/2009 Wind (non-FERC alternative) WT WND 0 66 66 Grafton/Merrimack NH 12/31/2012 10/1/2012 Pemigewassett 34.5 kV Substation NA N N NH W N
304 9/28/2009 G 7/6/2009 Biomass IC WDS 4.9 4.9 4.9 Cumberland ME 4/30/2012 1/30/2012 9/16/2009 CMP Moshers 34.5 kV CNR N N SME W F
303 8/20/2009 G 6/23/2009 Biomass ST WDS 7.6 7.6 7.6 Cumberland ME 3/1/2010 2/16/2010 8/18/2009 Rigby/Pleasant Hill 34.5 kV Line NR N N SME W F
303 9/28/2009 G 6/24/2009 Biomass ST 9.5 9.5 9.5 Androscoggin ME 7/10/2009 TBD NR N N ME W F
302 4/26/2011 G 6/16/2009 Wind Alternative (see 272) WT WND 0 150 150 Aroostook ME 12/31/2012 9/1/2012 4/26/2011 BHE/MEPCO Line CNR N N PD BHE W F
301 11/19/2015 G 5/28/2009 Dundee Wind Increase WT WND 3.9 3.9 3.9 Penobscot ME 7/26/2011 5/1/2011 BHE Keene Rd Substation NR Y Y ISO-NE BHE C F
300 11/29/2017 G 5/14/2009 Canton Mountain Winds WT WND 19.25 19.25 19.25 Oxford ME 11/29/2017 10/18/2017 229 Line near Riley Substation NR Y Y ISO-NE PD ME C F
299 4/10/2012 G 5/11/2009 Seabrook PSS Enabling ST NUC 0 0 0 Rockingham NH 11/1/2009 11/1/2009 345 kV Seabrook substation CNR Y Y ISO-NE BL NH C F
298 5/12/2009 G 4/15/2009 Wind Uprate (see QP290) WT 1.5 1.5 1.5 Oxford ME 11/30/2010 9/30/2010 5/12/2009 CMP Woodstock Station NR N N ME W F
297 1/11/2012 G 3/25/2009 Wind WT WND 201.6 201.6 201.6 Aroostook ME 10/1/2013 7/1/2013 1/9/2012 MEPCO Line at Haynesville, ME CNR N N PD BHE W F
296 7/31/2009 G 2/20/2009 Biomass ST WDS 30 30 30 Windsor VT 5/1/2011 3/1/2011 7/30/2009 CVPS 46 kV circuit in Springfield Area MIS N N VT W N
296 5/19/2010 G 2/23/2009 Wind Farm WT WND 12 12 12 Chittenden VT 12/31/2010 12/31/2010 CVPS 34.5 kV Fairfax - Milton line NA N N VT W N
296 3/20/2013 G 3/20/2009 Salem Harbor 2 Exciter Replacement ST BIT 0 0 0 Essex MA 11/15/2009 11/15/2009 Salem Switchyard NA Y Y ISO-NE BOST C F
295 7/29/2015 G 2/9/2009 Combined Cycle CC NG 898 898 1012 Plymouth MA 3/1/2015 9/1/2014 5/8/2009 345 kV 322 Line CNR N N SEMA W F
294 7/29/2015 G 2/5/2009 Wind WT WND 20 20 20 Washington RI 6/30/2012 4/30/2012 5/7/2009 NGRID 34.5 kV 3302 line NS N N RI W F
293 5/19/2010 G 1/30/2009 Red Shield Acquisition - Hydro HD WAT 0 5 5 Penobscot ME 7/20/2009 BHE's Line 5 - 46 kV CNR N N ME C F
293 5/19/2010 G 1/30/2009 Red Shield Acquisition - Biomass ST WDS 0 13 16 Penobscot ME 7/20/2009 BHE's Line 5 - 46 kV CNR N N ME C F
292 2/1/2010 G 1/30/2009 Biomass Project ST WDS 49.7 49.7 51.5 Berkshire MA 10/1/2013 7/1/2013 1/26/2010 Doreen 115 kV substation of F132 115 kV line CNR N N BL WMA W F
291 6/24/2010 G 1/21/2009 Merrimack Unit 2 Second Uprate ST BIT 17.175 340 353.5 Merrimack NH 6/17/2010 6/1/2010 PSNH Merrimack Substation CNR Y Y ISO-NE BL NH C F
290 7/29/2010 G 1/15/2009 Wind WT WND 18 18 18 Oxford ME 12/30/2010 9/30/2010 7/29/2010 CMP Woodstock Substation CNR Y Y ISO-NE BL ME W F
290 12/21/2011 G 1/15/2009 Spruce Mountain Wind WT WND 18 18 18 Oxford ME 12/21/2011 11/30/2011 CMP Woodstock substation NA Y Y ISO-NE ME C N
289 8/5/2013 G 1/8/2009 Fuel Cell FC NG 9 9 9 New Haven CT 6/15/2012 5/15/2012 8/5/2013 UI''s Milvon substation NA Y Y UI SWCT W N
289 11/10/2011 G 1/8/2009 Sikorsky Aircraft GT NG 10.265 10.265 10.265 Fairfield CT 10/5/2011 7/24/2011 UI's Trap Falls substation NA Y Y UI SWCT C N
289 6/2/2010 G 1/8/2009 Yale University - Sterling Power Plant GT NG 17.6 17.6 17.6 New Haven CT 5/26/2010 5/1/2010 UI's Water Street substation NA Y Y UI SWCT C N
288 9/25/2009 TS 12/18/2008 Local Service Application - 87 MW 0 Somerset ME 9/1/2009 N/A N/A Y N ISO-NE ME C F
287 9/16/2015 G 12/18/2008 Saddleback Ridge Wind Project WT WND 33 33 33 Franklin ME 9/15/2015 8/15/2015 115kV Line 229 NR Y Y ISO-NE BL ME C F
286 9/30/2009 G 12/5/2008 Gas Turbine GT NG 187.5 187.5 199 Worcester MA 6/1/2012 2/1/2012 9/30/2009 115 kV bus at Millbury substation MIS N N CMA W F
285 8/29/2012 G 10/24/2008 Gas Turbine GT NG 35 35 35 Penobscot ME 7/31/2014 6/30/2014 8/29/2012 BHE Powersville substation CNR Y N ISO-NE PD BHE W F
284 4/10/2012 G 10/22/2008 Seabrook LP Turbine Blade replacement ST NUC 13 1257 1257 Rockingham NH 4/5/2012 12/31/2010 345 kV Seabrook Substation CNR Y Y ISO-NE NH C F
283 2/17/2015 ETU 10/20/2008 1100 MW HVDC Line NA N/A 0 N/A MA 6/30/2017 3/30/2017 2/16/2015 Orrington ME and BostonMA N/A N N BOST W F
282 6/29/2011 G 10/15/2008 Biomass Project ST WDS 49.7 49.7 51.5 Franklin MA 2/1/2014 11/1/2013 6/28/2011 115 kV line near Montage or Fench King substations CNR N N BL WMA W F
281 3/31/2010 G 10/6/2008 Wind WT WND 85 85 85 Rutland VT 9/1/2011 7/1/2011 3/30/2010 VELCO 115 kV K34 line CNR N N BL VT W F
281 2/12/2009 G 10/7/2008 Equipment Addition CC NG 45 Windham CT 1/30/2009 6/1/2008 CL&P 345 kV Lake Road substation MIS N N RI C F
280 9/24/2010 G 10/2/2008 Wind WT WND 180 180 180 Coos NH 9/1/2011 7/1/2011 9/24/2010 PSNH W-179 115 kV CNR N N PD NH W F
279 3/19/2009 G 9/30/2008 Biomass ST WDS 30 30 30 Windsor VT 5/1/2011 3/1/2011 2/20/2009 CVPS 46kV circuit in Springfield area MIS N N VT W N
278 6/13/2014 ETU 9/26/2008 Two terminal, 1000 MW , 500 kV, dc line NA N/A 0 N/A MA 3/31/2017 3/31/2017 6/13/2014 Maine Yankee Substation, South Boston Substation N/A N N BOST W F
277 3/19/2009 G 9/12/2008 Combined Cycle CC DFO NG 695 695 695 Fairfield CT 6/1/2013 1/15/2013 2/13/2009 CL&P 345 KV 321 line MIS N N SWCT W F
277 12/22/2014 G 9/22/2008 Combined Cycle (QP310 in NYISO Queue) CC NG 1002 1002 1115 Dutchess NY 1/31/2018 7/1/2017 12/18/2014 Pleasant Valley - Long Mtn 345 kV NA N N W N
276 9/19/2014 G 9/2/2008 Deerfield Wind WT WND 30 30 30 Bennington VT 12/31/2013 10/1/2013 9/11/2014 Y-25 North, 69 kV line between Searsburg and Benni NR Y Y ISO-NE BL WMA W F
275 4/21/2017 ETU 8/27/2008 Two terminal, 2000 MW , 500 kV, dc line NA N/A 0 N/A 3/31/2014 9/15/2008 Maine Yankee Substation, South Boston Substation N/A N N W F
274 10/4/2012 G 8/7/2008 GMP Generator Replacement GT DFO NG 29.5 41.5 48.7 Chittenden VT 6/1/2014 5/1/2014 10/14/2012 GMP Gorge Substation CNR Y Y ISO-NE VT W F
274 3/19/2009 TS 8/25/2008 Wind project point-to-point application NA N/A 0 100 100 Aroostoock ME 10/1/2011 N/A N/A N N BHE W F
273 11/1/2019 G 8/3/2008 Palmer Renewable Energy ST WDS 36.7 36.7 37 Hampden MA 7/15/2020 6/15/2020 10/16/2019 115 kV line near E. Springfield substation NR Y Y ISO-NE BL WMA W F
272 6/17/2009 G 8/1/2008 Wind WT WND 64 64 64 Franklin ME 8/1/2012 6/1/2012 6/15/2009 CMP Rumford or Bigelow Substation MIS N N ME W F
272 10/3/2008 G 8/1/2008 Wind WT WND 0 150 150 Aroostoock ME 8/1/2011 5/1/2011 10/3/2008 BHE Millinocket Substation MIS N N BHE W F
272 4/15/2009 G 8/1/2008 Wind WT WND 0 150 150 Aroostoock ME 8/1/2011 5/1/2011 3/10/2009 BHE Powersville Substation MIS N N BHE W F
272 2/16/2010 G 8/1/2008 Wind WT WND 85 85 85 Somerset ME 8/1/2012 6/1/2012 2/3/2010 CMP 115 KV LINE 222 CNR N N PD ME W F
272 5/1/2009 G 8/1/2008 Wind WT WND 128 128 128 Aroostoock ME 12/31/2013 10/31/2013 4/21/2009 BHE 345 kV 396 line MIS N N BHE W F
272 10/29/2015 G 8/1/2008 Oakfield II Wind - Keene Road WT WND 135.5 135.5 135.5 Aroostoock ME 10/29/2015 7/29/2015 BHE Keene Road Substation NR Y Y ISO-NE PD BHE C F
271 4/21/2017 ETU 7/30/2008 Two terminal, 1000 MW , 500 kV, dc line NA N/A 0 N/A 3/31/2014 5/12/2009 Hertel S/S in Quebec or Clay S/S in NY and Norwalk N/A N N W F
271 1/29/2010 ETU 7/30/2008 Two terminal, 1000 MW , 500 kV, dc line NA N/A 0 N/A 3/31/2014 Hertel S/S in Quebec or Clay S/S in NY and Glenbro N/A N N W F
271 7/16/2010 ETU 7/30/2008 Two terminal, 1000 MW , 500 kV, dc line NA N/A 0 N/A 3/31/2014 Hertel S/S in Quebec or Clay S/S in NY and Singer N/A N N W F
271 10/22/2009 TS 8/1/2008 MPS RNS Application NA N/A 0 Aroostoock ME 10/1/2010 N/A N/A N N BHE W F
270 3/31/2011 G 7/17/2008 Pumped Storage Project PS WAT 1000 1000 1000 Wiscasset ME 6/1/2014 6/1/2014 3/31/2011 Maine Yankee 345 kV substation NR N N BL ME W F
269 8/3/2011 G 7/14/2008 Indian River Power HD WAT 1.28 1.28 1.28 Hampden MA 8/2/2011 3/31/2011 WMELCO 23 kV circuit NR Y Y NU WMA C F
268 5/1/2009 G 7/8/2008 Wind ( increase in queue position 266) WT WND 8.5 8.5 8.5 Orleans VT 12/31/2011 9/15/2011 4/13/2009 CVPS Lowell Substation MIS N N VT W F
267 3/19/2009 G 6/24/2008 Gas Turbine Capacity Increase ( See queue position GT DFO NG 175 175 222 Fairfield CT 6/1/2011 2/1/2011 3/9/2009 345 kV line # 321 MIS N N SWCT W F
266 5/1/2009 G 6/19/2008 Wind WT WND 34 34 34 Orleans VT 12/31/2011 9/15/2011 4/13/2009 CVPS Lowell Substation MIS N N VT W F
265 12/5/2013 G 6/16/2008 MATEP - Third CTG GT DFO NG 12.5 12.5 14 Suffolk MA 6/1/2014 5/1/2014 1/7/2013 NSTAR Brighton Substation CNR Y Y NSTAR BOST W F
264 7/10/2008 G 6/4/2008 Landfill Gas IC LFG 0.8 0.8 0.8 NH 11/30/2008 11/1/2008 7/10/2008 NHEC 12.5 kV circuit MIS N N NH W N
264 9/28/2009 G 6/11/2008 Biomass Project ST WDS 10 10 10 Grafton NH 6/1/2010 6/1/2010 9/28/2009 PSNH 34.5 kV circuit #343 NA N N NH W N
263 3/25/2010 G 5/27/2008 Wind WT WND 385 385 385 Washington RI 12/1/2012 6/1/2011 3/24/2010 West Kingston Substation CNR N N BL RI W F
262 11/10/2011 G 5/23/2008 Rhode Island Landfill Gas Genco Increase (see QP # CC LFG 6 45.9 50.1 Providence RI 9/1/2013 9/1/2013 11/9/2011 NGRID 115 kV S171 line CNR Y Y NGRID RI W F
261 11/7/2008 G 5/19/2008 Combined Cycle CC NG 221.6 440 497 ME 12/31/2013 6/30/2013 11/7/2008 Yarmouth Substation 115 kV bus MIS N N ME W F
260 3/19/2009 G 5/8/2008 Wind WT WND 450 450 450 N/A RI 12/31/2013 6/30/2012 2/27/2009 Brayton Point 115 kV bus or Dexter 115 kV bus MIS N N RI W F
260 3/19/2009 G 5/8/2008 Wind WT WND 0 450 450 N/A RI 12/31/2013 6/30/2012 2/27/2009 Kent County 115 kV bus or Davisville 115 kV bus MIS N N RI W F
259 8/19/2010 G 5/7/2008 Combined Cycle CC NG 27 551 616.3 Providence RI 6/1/2012 6/1/2012 8/11/2010 115 kV RISE Substation CNR N N PD RI W F
259 2/12/2009 G 5/7/2008 Combined Cycle CC DFO NG 27 303.3 340.2 Norfolk MA 6/1/2010 6/1/2010 1/28/2009 345 kV NEA Bellingham Substation MIS N N RI W F
258 11/19/2015 G 4/15/2008 Merrimack Unit 2 Uprate ST BIT 4.65 327.5 337 Merrimack NH 5/26/2008 PSNH Merrimack Substation MIS N N NH C F
257 9/16/2013 G 4/14/2008 Wind Project-Phase 4( MPS Queue # 8) WT WND 250 250 250 N/A ME 9/1/2013 9/3/2013 Maine Public Service System, upgrades include tap NA N N MPS BHE W N
257 9/16/2013 G 4/14/2008 Wind Project-Phase 5( MPS Queue # 9) WT WND 150 150 150 N/A ME 9/1/2013 9/3/2013 9/3/2013 Maine Public Service System, upgrades include tap NA N N MPS BHE W N
256 3/26/2013 G 4/4/2008 Steam Turbine ST WDS 20 20 20 Merrimack NH 3/31/2013 12/30/2012 3/2/2013 Unitil 34.5kV line from PSNH Garvins station to UE NA N N NH W N
255 12/3/2009 G 3/31/2008 Wind WT WND 50 50 50 Grafton NH 12/31/2010 10/1/2010 9/30/2009 115 kV Plymouth substation CNR N N NH W F
255 11/13/2012 G 3/31/2008 Distribution Wind Alternative WT WND 2 50 50 Grafton NH 12/31/2012 10/1/2012 PSNH Ashland 34.5 kV NA N N NH W N
254 8/31/2009 G 3/10/2008 Wind WT WND 19.5 19.5 19.5 Penobscot ME 11/1/2010 11/1/2010 8/25/2009 CMP 115 kV line # 203 CNR N N ME W F
254 9/3/2015 G 3/25/2008 Wind Project WT WND 12.5 12.5 12.5 Berkshire MA 11/30/2016 10/31/2016 9/2/2015 WMECO Berkshire substation 23 kV circuit NA N N WMA W N
253 6/17/2009 G 3/11/2008 Combined Cycle CC DFO 269 269 310 Fairfield CT 6/1/2011 2/1/2011 6/1/2009 CL&P 115 kV 1876 line MIS N N SWCT W F
252 7/30/2010 G 2/13/2008 Foxwoods Central Plant GT NG 13.2 13.2 17.6 New London CT 7/15/2010 4/30/2010 CL&P 23 kV feeders from Tunnel and Mystic Substati NA Y Y NU CT C N
251 6/18/2014 G 2/15/2008 Burgess BioPower ST WDS 58.7 58.7 58.7 Coos NH 6/17/2014 10/25/2013 PSNH Eastside(Berlin) Substation CNR Y Y ISO-NE PD NH C F
250 11/30/2011 G 2/13/2008 Hamilton Sundstrand GT NG 5 4.9 6.1 Hartford CT 10/1/2011 9/30/2011 CL&P Windsor Locks Substation NA N Y CT C N
249 2/5/2013 G 2/4/2008 Stetson Wind II(Jimmey & Owl Mt.-UPC) WT WND 2.2 26.2 26.2 Washington ME 3/12/2010 1/15/2010 BHE Keene Road Substation NR Y Y ISO-NE BHE C F
248 11/19/2015 G 2/7/2008 New Haven Harbor 2-4 GT DFO NG 129.6 129.6 145.8 New Haven CT 5/23/2012 4/11/2012 UI East shore Substation 115 kV bus CNR Y Y ISO-NE PD CT C F
247 4/17/2009 G 1/31/2008 Reconnect Existing Hydro HD WAT 0 4.1 4.1 Orleans VT 5/31/2010 5/1/2010 4/2/2009 VELCO Newport Substation 46 kV bus MIS N N VT W F
247 4/17/2009 G 1/31/2008 Diesel generation IC DFO 10.3 10.3 10.3 Orleans VT 5/1/2009 5/1/2009 4/2/2009 VELCO Newport Substation 46 kV bus MIS N N VT W F
246 12/31/2008 G 1/29/2008 Gas Turbine GT NG 77 77 87 Worcester MA 6/1/2011 3/1/2011 12/31/2008 115 kV bus at Millbury substation MIS N N CMA W F
245 2/5/2013 G 1/11/2008 Stetson Wind II(Jimmey & Owl Mt.-UPC) See # 249 WT WND 24 24 24 Washington ME 3/12/2010 1/15/2010 BHE Keene Road Substation NR Y Y ISO-NE BHE C F
244 3/23/2012 G 1/3/2008 Wind WT WND 117 117 117 Somerset ME 12/30/2013 10/1/2013 3/21/2012 CMP 115 kV Wyman substation CNR Y Y ISO-NE BL ME W F
243 12/14/2011 G 1/4/2008 Increase to Steam Turbine Capacity Uprate (See QP ST BIT 6 648 669 Bristol MA 12/12/2011 12/11/2011 Brayton Point 345 kV Switchyard NR Y Y ISO-NE RI C F
242 9/25/2009 G 1/3/2008 Biomass Project ST WDS 20 20 20 Cheshire NH 10/30/2013 6/30/2013 9/18/2009 PSNH 115 kV N186 circuit CNR N N NH W F
241 1/30/2012 G 12/31/2007 Towantic Energy increase CC DFO NG 38 489 557 New Haven CT 12/31/2014 6/30/2014 1/27/2012 CL&P 115 kV lines between Baldwin Junction and Bea CNR Y Y ISO-NE SWCT W F
240 10/27/2010 G 12/18/2007 Gas Turbine GT KER NG 94 94 98 New London CT 6/1/2013 1/1/2013 10/27/2010 Montville Substation CNR N N BL CT W F
239 11/12/2008 G 12/12/2007 Gas Turbine Capacity Increase ( See queue position GT DFO NG 35 360 436 Fairfield CT 9/30/2010 6/30/2010 10/22/2008 UI 345 kV Singer Substation MIS N N SWCT W F
238 6/24/2010 G 12/7/2007 Barre Mass Landfill Gas IC LFG 1.6 1.6 2 Worcester MA 3/11/2011 2/11/2011 6/17/2010 13.8 kV distribution circuit NR Y Y ISO-NE WMA W F
237 1/14/2010 G 12/5/2007 Combined Cycle CC NG 285 285 300 Newport RI 12/1/2014 8/1/2014 1/14/2010 115 kV Tiverton Substation CNR N N PD RI W F
236 11/13/2012 G 11/30/2007 Pioneer Valley Energy Center CC DFO NG 353 353 421 Hampden MA 9/28/2015 4/29/2015 11/1/2012 115 kV line between Buck Pond and Pochassic substa CNR Y Y ISO-NE BL WMA W F
235 3/15/2008 G 11/15/2007 Gas Turbine GT NG 58 65 New Haven CT 1/31/2010 1/1/2010 2/27/2008 CL&P 46 kV circuit from Baldwin Substation MIS N N SWCT W F
235 6/30/2008 G 11/15/2007 Gas Turbine GT DFO NG 170 196 New London CT 5/31/2010 5/1/2010 6/30/2008 CL&P Card Street substation MIS N N CT W F
234 5/22/2009 G 11/7/2007 Moretown Landfill IC LFG 4.8 4.8 4.8 Washington VT 9/4/2008 9/4/2008 Green Mountain Power 34 kV feeder MIS N N VT C N
233 5/30/2013 G 11/2/2007 Rhode Island Landfill Gas Genco CC LFG 27.9 32.6 36.8 Providence RI 5/25/2013 12/10/2012 NGRID 115 kV S171 line CNR Y Y NGRID RI C F
232 1/29/2008 G 11/1/2007 Gas Turbine GT DFO NG 250 275 Hartford CT 6/1/2010 4/1/2010 1/29/2008 CL&P 329 345 kV line or 1895 115 kV line MIS N N CT W F
231 12/14/2011 G 10/25/2007 Brayton Point 3 Uprate( see 243) ST BIT 30 642 663 Bristol MA 12/12/2011 12/11/2011 Brayton Point 345 kV Switchyard NR Y Y ISO-NE RI C F
230 8/20/2009 G 10/15/2007 GMP Essex Diesel IC DFO 8 8 Colchester VT 10/30/2007 GMP Essex Substation MIS N Y N/A VT C F
229 9/8/2008 G 10/15/2007 Biomass Project ST WDS 41 41 Coos NH 12/31/2013 12/31/2013 9/8/2008 PSNH 34.5 kV circuit from Lost Nation or Whitefiel MIS N N NH W F
229 10/19/2011 G 10/15/2007 CPD Berlin ST WDS 29.5 29.5 29.5 Coos NH 8/31/2013 7/31/2013 10/11/2011 PSNH 115 kV Berlin Substation CNR Y Y ISO-NE PD NH W F
228 2/5/2013 G 10/9/2007 Dundee Wind WT WND 27 27 30 Penobscot ME 7/26/2011 5/1/2011 BHE Keene Road Substation NR Y Y ISO-NE BHE C F
227 9/23/2010 G 9/26/2007 Bear Swamp Uprate - First Unit PS WAT 43 333 333 Berkshire MA 3/31/2012 3/17/2012 9/23/2010 Bear Swamp 230 kV Substation NR Y Y ISO-NE WMA W F
227 9/23/2010 G 9/26/2007 Pump Storage Capacity Upgrade PS WAT 43 333 333 Berkshire MA 3/30/2013 3/16/2013 9/23/2010 Bear Swamp 230 kV Substation NR Y Y ISO-NE WMA W F
227 3/14/2008 ETU 9/28/2007 Increase Transfer South From Wyman Hydro NA N/A N/A ME N/A MIS N N ME W F
226 7/23/2009 G 9/5/2007 Combined Cycle Capacity Increase/ Generator Change CC NG 904 904 1010 Rockingham NH 6/30/2013 12/31/2012 7/14/2009 345 kV Seabrook Substation MIS N N NH W F
225 10/22/2010 G 8/13/2007 Combined Cycle Capacity Increase (See QP #202) CC NG 161 411 412 Windham CT 5/31/2013 1/31/2013 10/22/2010 CL&P 345 kV Lake Road substation CNR N N PD RI W F
225 8/20/2010 G 9/4/2007 Wind Project-Phase 1( MPS Queue # 6) WT WND 53.4 255 255 N/A 9/1/2010 Maine Public Service System, upgrades include tap NA N N N/A W N
224 2/17/2010 G 8/10/2007 VPPSA Swanton Gas Turbine #1 GT DFO NG 21 21.2 27.6 Franklin VT 2/12/2010 12/16/2009 Swanson Village 46 kV System NA Y Y ISO-NE VT C N
224 5/24/2010 G 8/10/2007 VPPSA Swanton Gas Turbine #2 GT DFO NG 21 21.2 27.6 Franklin VT 5/24/2010 5/1/2010 Swanton Village 46 kV System NA Y Y ISO-NE VT C N
223 11/19/2015 G 7/25/2007 Increase to biomass project in queue position 218 ST WDS 0 20.5 24 Berkshire MA 12/1/2010 9/1/2010 1/30/2009 Doreen 115 kV substation or F132 115 kV line MIS N N WMA W F
223 11/7/2007 G 7/25/2007 Gas Turbine GT NG 159 185 New Haven CT 5/6/2010 3/24/2010 11/7/2007 East Shore-Grand Ave 115 kV line MIS N N SWCT W F
222 5/30/2012 G 7/16/2007 Meriden Gas Turbines CC DFO NG 510 510 560 New Haven CT 6/1/2015 12/1/2014 5/30/2012 Haddam Neck-Southington 345 kV line CNR Y Y ISO-NE BL CT W F
221 2/4/2011 G 7/18/2007 Wind Project WT WND 34.9 34.9 34.9 Penobscot ME 12/30/2012 10/30/2012 2/4/2011 115 kV line between Enfield and James River substa NR Y Y ISO-NE BHE W F
220 5/22/2009 G 7/10/2007 Indeck Energy Alexandria ST WDS 16.5 16.5 16.5 Grafton NH 1/31/2009 9/7/2008 34.5 kV circuit from PSNH Peniwagewassett substat MIS Y Y NU NH C F
219 10/1/2010 G 7/6/2007 L'Energia CC DFO NG 74 74 77 Middlesex MA 1/1/2009 11/15/2008 J162 115kV line between Tewksbury and Perry Street MIS Y Y ISO-NE CMA C F
218 2/12/2009 G 6/27/2007 Biomass Project ( Also see queue position #223) ST WDS 62 41 48 Berkshire MA 12/1/2010 9/1/2010 1/30/2009 Doreen 115 kV substation or F132 115 kV line MIS N N WMA W F
217 4/9/2010 G 6/13/2007 Northfield Mt. Equipment Replacement PS WAT 0 1180 1180 Franklin MA 10/20/2008 10/20/2008 W. Mass Northfield 345 kV substation NA Y Y ISO-NE WMA C F
216 6/2/2010 G 6/8/2007 Combined Cycle CC DFO NG 244 244 294 Bristol MA 12/31/2013 11/1/2013 5/28/2010 Cleary 115 kV substation NR Y Y ISO-NE BL SEMA W F
215 10/15/2008 G 5/30/2007 Combined Cycle CC DFO NG 578 578 558 Norfolk MA 6/1/2013 2/1/2013 10/27/2008 NGRID 345 kV 344 Line MIS N N SEMA W F
215 12/19/2011 G 5/24/2007 Longfellow Wind WT WND 50 50 50 Oxford ME 12/1/2013 10/1/2013 12/14/2011 CMP 115 kV Rumford Substation CNR Y Y ISO-NE PD ME W F
214 10/15/2007 G 5/21/2007 Biomass Project ST WDS 41 41 Coos NH 8/31/2010 6/30/2010 10/27/2007 PSNH 34.5 kV circuit from Lost Nation or Whitefiel MIS N N NH W F
214 10/15/2007 G 5/21/2007 Biomass Project ST WDS 41 41 Coos NH 8/31/2010 6/30/2010 10/15/2007 PSNH 115 kV S136 line MIS N N NH W F
213 3/3/2010 G 5/15/2007 Gas Turbine GT NG 159 158.5 184.7 Worcester MA 6/1/2013 2/1/2013 3/3/2010 ANP Blackstone 345 kV substation CNR N N PD RI W F
213 11/20/2008 G 5/15/2007 Gas Turbine GT NG 159 158.5 184.7 Worcester MA 6/1/2010 2/1/2010 10/21/2008 ANP Milford 115 kV substation MIS N N RI W F
212 6/9/2020 G 5/15/2007 Biomass Project ST WDS 45 45 45 Hillsborough NH 2/28/2010 12/31/2009 5/28/2009 PSNH K-165 115 kV line MIS N N NH W F
211 11/20/2007 G 5/8/2007 Combined Cycle CC DFO NG 496 550 Bristol MA 6/1/2010 2/1/2010 11/20/2007 NSTAR 115 kV line #111 MIS N N SEMA W F
210 5/22/2009 G 4/30/2007 MATEP (Medical Area Total Energy Project)-modify i OT DFO NG Suffolk MA 12/11/2007 NSTAR Coburn Substation MIS N Y NSTAR BOST C F
209 5/22/2009 G 4/18/2007 Mount Tom Voltage Regulator Replacement ST BIT Hampden MA 6/30/2007 W Mass. Mt. Tom 115 kV Substation MIS N N WMA C F
208 12/12/2007 G 4/13/2007 Gas Turbine GT NG 100 100 Norfolk MA 6/1/2011 12/31/2010 8/21/2008 345 kV NEA Bellingham substation MIS N N RI W F
207 1/30/2012 G 4/3/2007 Towantic Energy CC DFO NG 452 452 540 New Haven CT 12/31/2014 6/30/2014 1/27/2012 CL&P 115 kV lines between Baldwin Junction and Bea CNR Y Y ISO-NE SWCT W F
206 5/22/2009 G 4/3/2007 Kimberly Clark-Unit 1 NG 28 28 Litchfield CT 5/5/2008 CL&P Rocky River Substation MIS Y Y NU SWCT C N
206 5/22/2009 G 4/3/2007 Kimberly Clark-Unit 2 NG 10.8 10.8 Litchfield CT 10/1/2008 CL&P Rocky River Substation MIS Y Y NU SWCT C N
206 5/22/2009 G 4/3/2007 Kimberly Clark-Unit 3 NG 4 4 4 Litchfield CT 1/5/2009 11/15/2008 CL&P Rocky River Substation MIS Y Y NU SWCT C N
205 10/3/2007 G 4/2/2007 Gas Turbine GT NG 8.1 9.1 Penobscot ME 6/1/2007 6/1/2007 10/3/2007 BHE's Line 5 - 46 kV MIS N N ME W F
204 4/24/2007 G 3/30/2007 Gas Turbine GT DFO NG 40 48 Hartford CT 12/31/2009 12/31/2009 4/27/2007 CL&P Windsor locks substation MIS N N CT W F
203 7/1/2009 G 3/20/2007 Landfill Gas IC LFG 6.3 6.3 6.3 Coos NH 12/31/2008 12/31/2008 7/1/2009 34.5 kV feeder from Littleton MIS N N NH W N
202 10/22/2010 G 2/27/2007 Combined Cycle CC NG 250 250 285 Windham CT 5/31/2013 1/31/2013 10/22/2010 CL&P 345 kV Lake Road substation CNR N N PD RI W F
201 12/15/2009 G 2/26/2007 Converts QP 164 to combined cycle facility and inc CC NG 0 162 162 Providence RI 2/26/2014 12/31/2013 12/14/2009 345 kV RISE Substation CNR N N RI W F
200 8/12/2013 G 2/21/2007 Wind Project WT WND 34 34 34 Coos NH 11/1/2014 8/1/2014 8/7/2013 New Hampshire Electric Coop 34.5 kV line NA N N NH W N
199 3/19/2010 G 2/21/2007 Waterbury Generating Facility GT NG 95.7 95.7 98.1 New Haven CT 6/26/2009 5/1/2009 CL&P Baldwin 115 kV substations CNR Y Y ISO-NE SWCT C F
198 5/7/2008 G 2/8/2007 Biomass Project ST WDS 56.4 67.5 Coos NH 6/1/2009 4/1/2009 5/7/2008 Near PSNH Lost Nation substation MIS N N NH W F
197 1/31/2012 G 1/31/2007 Record Hill Wind WT WND 50.6 50.6 50.6 Oxford ME 1/31/2012 11/28/2011 115kV Rumford Substation CNR Y Y ISO-NE ME C F
196 6/29/2011 G 1/16/2007 Northfield Mt Upgrade #3 PS WAT 25 295 295 Franklin MA 6/17/2011 6/1/2011 W. Mass Northfield 345 kV substation CNR Y Y ISO-NE WMA C F
196 6/6/2012 G 1/16/2007 Northfield Mt. Upgrade #2 PS WAT 25 295 295 Franklin MA 5/25/2012 6/1/2012 W. Mass Northfield 345 kV substation CNR Y Y ISO-NE WMA C F
196 5/21/2014 G 1/16/2007 Northfield Mt. Upgrade #4 PS WAT 25 295 295 Franklin MA 5/21/2014 5/21/2014 W. Mass Northfield 345 kV substation CNR Y Y ISO-NE WMA C F
196 2/22/2016 G 1/16/2007 Northfield Mt Upgrade #1 PS WAT 25 295 295 Franklin MA 2/18/2016 8/31/2015 W. Mass Northfield 345 kV substation CNR Y Y ISO-NE WMA C F
196 5/22/2009 G 1/26/2007 UMass Gas Turbine GT NG 10.4 8.5 11.4 Hampshire MA 1/29/2009 5/6/2008 WMECO Podick substation 13.8 kV feeders MIS Y Y NU WMA C N
195 9/25/2009 G 1/9/2007 Dartmouth Power Expansion GT KER NG 24 24 24 Bristol MA 9/24/2009 8/14/2009 NSTAR 115 kV line #111 CNR Y Y ISO-NE SEMA C F
194 5/1/2007 G 1/8/2007 Gas Turbine GT NG 177.1 189.3 New Haven CT 3/31/2010 1/15/2010 5/1/2007 UI 115 kV line # 8200 MIS N N SWCT W F
193 3/13/2012 G 1/5/2007 Ansonia Generation CC NG 60 60 67 New Haven CT 9/9/2013 7/10/2013 3/13/2012 UI Ansonia 115 kV substation CNR Y Y ISO-NE SWCT W F
192 3/26/2007 G 12/28/2006 Combined Cycle CC DFO NG 496 550 Litchfield CT 6/1/2010 4/1/2010 3/26/2007 CL&P Frostbridge Substation MIS N N W F
192 6/30/2008 G 12/28/2006 Combined Cycle CC DFO NG 496 550 Fairfield CT 6/1/2013 4/1/2013 7/30/2008 CL&P Plumtree Substation MIS N N SWCT W F
192 5/26/2011 G 1/3/2007 Salem Harbor Unit 3 Exciter Replacement ST BIT Essex MA 5/4/2007 Salem Switchyard MIS Y Y ISO-NE BOST C F
191 5/14/2007 G 12/22/2006 Gas Turbine GT NG 100 100 Fairfield CT 5/31/2010 3/31/2010 5/14/2007 UI 115 kV line #8909 MIS N N SWCT W F
191 9/14/2010 G 12/22/2006 Biomass Project ST WDS 26 26.25 26.75 Litchfield CT 3/1/2013 12/14/2012 9/13/2010 CL&P 115 kV line #1238 CNR Y Y ISO-NE SWCT W F
190 5/15/2009 G 12/22/2006 Gas Turbine GT DFO KER NG 156 156 200 Hampden MA 1/31/2010 10/30/2009 5/28/2009 W Mass. Mt. Tom 115 kV Substation MIS N N WMA W F
190 5/12/2009 G 12/22/2006 Gas Turbine GT DFO KER NG 39 39 50 New London CT 1/31/2010 10/30/2009 5/7/2009 CL&P Tunnel 115 kV Substation MIS Y N ISO-NE CT W F
190 5/15/2009 G 12/22/2006 Gas Turbine GT DFO KER NG 39 39 50 Litchfield CT 1/31/2010 10/30/2009 5/11/2009 CL&P Falls Village 69 kV Substation MIS Y N ISO-NE CT W F
190 5/15/2009 G 12/22/2006 Gas Turbine GT DFO KER NG 39 39 50 New Haven CT 1/31/2010 10/30/2009 5/7/2009 CL&P Stevenson 115 kV Substation MIS Y N ISO-NE SWCT W F
189 11/25/2009 G 12/15/2006 Covanta Haverhill Landfill Gas IC LFG 1.6 1.6 Essex MA 12/5/2007 NGRID 23 kV circuit # 2371 from Ward Hill substati MIS Y Y ISO-NE BOST C F
188 2/1/2007 G 12/7/2006 Gas Turbine Capacity Increase( #178) CC DFO NG 69 0 Plymouth MA 6/1/2010 4/1/2010 2/1/2007 115 kV F19 and/or E20 lines MIS N N SEMA W F
187 2/11/2009 G 12/5/2006 Fuel Cell FC NG 28.9 28.9 28.9 Fairfield CT 6/1/2009 6/1/2009 1/27/2009 UI Congress substation MIS N N SWCT W N
186 6/1/2009 G 12/1/2006 Gas Turbine GT DFO KER 78 78 93 New Haven CT 12/31/2011 10/30/2011 5/29/2009 CL&P Shepaug 115 kV substation MIS N N ISO-NE SWCT W F
186 6/1/2009 G 12/1/2006 Hydro HD WAT 6.5 48 48 New Haven CT 12/31/2011 10/30/2011 5/29/2009 CL&P Shepaug 115 kV substation MIS N N ISO-NE SWCT W F
185 2/21/2013 G 11/22/2006 Stetson Wind Phase I WT WND 60 58.7 58.7 Penobscot ME 1/22/2009 12/1/2008 BHE Keene Road 115 kV substation NR Y Y ISO-NE BHE C F
185 2/5/2013 G 11/22/2006 Rollins Wind (Stetson Wind Phase II) WT WND 27.8 27.8 27.8 Penobscot ME 7/26/2011 5/1/2011 BHE Keene Road 115 kV substation NR Y Y ISO-NE BHE C F
184 5/23/2007 G 11/17/2006 Gas Turbine Capacity Increase( #157) GT DFO NG 140 140 Middlesex MA 12/1/2008 9/1/2008 5/23/2007 337 Sandy Pond - Tewksbury 345 kV Line MIS N N ISO-NE CMA W F
183 10/1/2010 G 11/17/2006 Increase Existing Capacity ST NUC 70 1225 1245 New London CT 11/1/2008 11/1/2008 CL&P Millstone 345 kV Substation MIS Y Y ISO-NE CT C F
182 5/15/2009 G 10/20/2006 Gas Turbine Capacity Increase ( See queue position GT DFO NG 0 0 18.4 Fairfield CT 6/1/2010 2/1/2010 5/13/2009 345 kV line # 321 MIS N N ISO-NE SWCT W F
181 4/21/2017 ETU 11/9/2006 Transmission Expansion NA N/A 0 N/A CT 9/2/2009 Lake Road 345 kV Substation N/A Y N ISO-NE CT W F
180 4/21/2017 ETU 11/8/2006 Transmission Expansion NA N/A N/A CT 5/31/2007 CL&P Killingly 115 kV Substation N/A N N CT W F
180 2/16/2007 ETU 11/8/2006 Transmission Expansion NA N/A N/A CT CL&P Card 345 kV Substation N/A N N CT W F
179 5/22/2009 G 11/6/2006 Red Shield( Georgia Pacific/Old Town) ST WDS 16 16 Penobscot ME 11/1/2006 BHE's Line 5 - 46 kV MIS N N ISO-NE BHE C F
178 5/25/2017 G 11/2/2006 Brockton Combined Cycle CC DFO NG 332 332 371 Plymouth MA 5/31/2019 1/25/2019 5/25/2017 115 kV F19 and E20 lines NR Y Y ISO-NE SEMA W F
177 12/31/2008 G 10/23/2006 Gas Turbine GT DFO NG 190 190 190 Worcester MA 6/1/2011 3/1/2011 12/23/2008 115 kV bus at Millbury substation MIS N N ISO-NE CMA W F
176 12/31/2008 G 10/20/2006 Wind WT WND 145.5 145.5 145.5 Coos NH 12/30/2008 11/30/2008 12/29/2008 PSNH 115 kV Whitefield substation MIS N N ISO-NE NH W F
175 5/15/2009 G 10/20/2006 Gas Turbine GT DFO NG 175 175 203.6 Fairfield CT 6/1/2010 2/1/2010 5/13/2009 345 kV line # 321 MIS N N ISO-NE SWCT W F
174 8/9/2012 G 10/13/2006 Combined Cycle CC DFO NG 280 280 280 Hampden MA 7/1/2015 5/1/2015 8/10/2012 345 kV Stony Brook Substation CNR Y Y ISO-NE BL WMA W F
173 2/11/2009 G 9/21/2006 Wind Project WT WND 60 60 60 Rutland VT 10/30/2010 9/15/2010 1/21/2009 115 kV West Rutland substation MIS N N VT W F
172 10/19/2011 G 8/29/2006 Sheffield Wind Project WT WND 40 40 40 Caledonia VT 10/19/2011 9/19/2011 Irasburg - St. Johnsbury 115 kV CNR Y Y ISO-NE VT C F
171 6/30/2009 G 8/29/2006 Thomas A. Watson Generating Station GT DFO NG 108 108 115 Norfolk MA 6/23/2009 3/1/2009 115 kV Potter Substation CNR Y Y ISO-NE SEMA C F
170 4/16/2009 G 8/25/2006 Gas Turbine Capacity Increase (see #155) DFO NG 0 40 55 Middlesex MA 5/1/2011 3/1/2011 4/9/2009 NSTAR Mystic Substation MIS N N ISO-NE BOST W F
169 ETU 8/15/2006 Transmission Expansion NA N/A N/A VT 6/30/2009 VELCO Coolidge Substation N/A N N VT W F
169 G 8/15/2006 Biomass ST WDS 25 27.5 Windsor VT 6/30/2009 4/30/2009 11/2/2006 New Ludlow 115 kV Substation MIS N N VT W F
168 10/1/2009 G 8/11/2006 Wind Project-Phase 2( MPS Queue # 2&3) WT WND 250 250 N/A 9/30/2012 9/16/2009 Maine Public Service System, upgrades include tap MIS N N MPS W N
168 10/1/2009 G 8/11/2006 Wind Project-Phase 3( MPS Queue # 4) WT WND 250 250 N/A 9/30/2011 9/16/2009 Maine Public Service System, upgrades include tap N N MPS W N
167 2/11/2009 G 8/10/2006 Fuel Cell FC NG 16 16 16 New Haven CT 12/31/2009 12/31/2009 CL&P Cherry Street 13 kV substation MIS N N SWCT W N
166 6/15/2015 G 8/9/2006 Granite Reliable Power WT WND 94.5 94.5 94.5 Coos NH 2/15/2012 10/24/2011 PSNH W-179 115 kV line CNR Y Y ISO-NE NH C F
165 4/17/2009 G 8/3/2006 Combined Cycle( See # 226) CC NG 563 563 616 Rockingham NH 6/30/2013 12/31/2012 4/10/2009 345 kV Seabrook Substation MIS N N ISO-NE NH W F
164 12/15/2009 G 8/1/2006 Combined Cycle( see # 201) GT NG 320 158 196 Providence RI 6/1/2012 12/31/2011 12/14/2009 345 kV RISE Substation CNR N N BL RI W F
163 7/16/2009 G 7/24/2006 Mirant Kendall Jet 2 GT JF 18 18 22 Middlesex MA 1/31/2010 1/15/2010 7/14/2009 Kendall Station in Cambridge MIS Y Y NSTAR BOST W F
162 5/22/2009 G 7/18/2006 Vernon Repowering HD WAT 32 32 Windham VT 3/13/2008 MIS Y Y ISO-NE VT C F
161 7/16/2010 G 7/5/2006 Devon Units 15, 16, 17, 18 GT KER NG 196.8 196.8 196.8 New Haven CT 6/9/2010 4/1/2010 Devon Substation CNR Y Y ISO-NE SWCT C F
161 6/27/2011 G 7/5/2006 Middletown 12, 13, 14 and 15 GT JF KER NG 215 215 211 Middlesex CT 6/24/2011 4/5/2011 CL&P Middletown Substation or CL&P Scovill Rock Su CNR Y Y ISO-NE CT C F
161 2/15/2011 G 7/5/2006 Middletown 11 GT JF KER NG 107.5 107.5 110 Middlesex CT 6/1/2011 4/1/2011 2/10/2011 CL&P Middletown Substation CNR Y Y ISO-NE CT W F
161 4/15/2009 G 7/5/2006 Combined Cycle CC NG 223 630 690 New London CT 5/31/2013 2/1/2013 4/7/2009 Montville Substation MIS N N ISO-NE CT W F
161 3/28/2007 G 7/17/2006 Combustion Turbine NG CT 4/30/2008 CL&P Rocky River Substation MIS N N SWCT W N
160 11/26/2008 G 6/30/2006 Gas Turbine GT DFO NG 82.2 82.2 94.8 Middlesex CT 5/31/2011 4/30/2011 11/26/2008 CL&P Middletown Substation MIS Y N ISO-NE CT W F
159 11/12/2008 G 6/30/2006 Gas Turbine GT NG 325 325 375 Fairfield CT 9/30/2010 6/30/2010 10/22/2008 UI 345 kV Singer Substation MIS Y Y ISO-NE SWCT W F
159 G 6/30/2006 Fuel Cell FC NG 30 30 Fairfield CT 12/31/2008 3/31/2008 10/25/2006 NU Triangle Substation 11A MIS N N SWCT W F
159 G 6/30/2006 Fuel Cell FC NG 30 30 Fairfield CT 12/31/2008 3/31/2008 10/25/2006 UI Congress Street Substation 2C MIS N N SWCT W F
158 5/22/2009 G 6/21/2006 UTC - P&WA NG 7.5 7.5 Middlesex CT 12/21/2007 CL&P P&WA Substation MIS Y Y NU CT C F
157 12/29/2009 G 6/21/2006 Billerica Power GT NG WO 311 311 341 Middlesex MA 6/15/2011 5/15/2011 12/29/2009 J-162 line to Tewksbury Substation CNR Y Y ISO-NE CMA W F
156 5/26/2011 G 6/13/2006 Salem Harbor Unit 1 Exciter Replacement ST BIT Essex MA 11/26/2006 Salem Switchyard MIS Y Y ISO-NE BOST C F
156 G 6/13/2006 Brayton Point Unit 3 Voltage Regulator Replacement ST BIT Bristol MA 5/26/2006 Brayton Switchyard MIS N N RI C F
155 4/16/2009 G 6/2/2006 Gas Turbine DFO NG 160 120 130 Middlesex MA 5/1/2011 3/1/2011 NSTAR Mystic Substation MIS N N ISO-NE BOST W F
155 5/22/2009 G 6/2/2006 Fairfield University NG 5 5 Fairfield CT 12/11/2007 UI Ash Creek Substation MIS N N SWCT C N
155 2/11/2009 G 6/16/2006 Fuel Cell FC NG 14.4 14.4 14.4 Fairfield CT 6/1/2009 6/1/2009 UI Pequonnock Substation MIS N N SWCT W N
154 G 5/31/2006 Gas Turbine (Additional Capacity) GT DFO 29 0 Suffolk MA 8/1/2008 6/1/2008 NSTAR Chelsea Substation MIS N N BOST W F
153 10/8/2007 G 5/30/2006 Fuel Cell FC NG 8 8 Fairfield CT 5/31/2007 5/31/2007 CL&P Cedar Heights Substation MIS N N SWCT W N
152 G 5/30/2006 MATEP (Medical Area Total Energy Project) OT DFO NG 42 42 Suffolk MA NSTAR Brighton Substation MIS N Y NSTAR BOST C F
151 G 5/30/2006 Fitchburg Renewable Energy IC LFG 7.2 7.2 Worcester MA 8/29/2007 NGRID E. Westminster Substation 13.8 kV MIS Y Y NGRID CMA C F
150 12/12/2013 G 5/25/2006 Plainfield Renewable Energy Project ST WDS 37.5 37.5 38.5 Windham CT 12/12/2013 11/7/2013 CLP Fry Brook Substation CNR Y Y ISO-NE CT C F
149 4/21/2017 ETU 3/10/2006 Transmission Expansion NA N/A N/A CT 11/1/2006 12/4/2007 N/A N/A N N ISO-NE CT W F
148 4/16/2013 G 3/6/2006 Comerford Unit #1 HD WAT -17 24.3 24.5 Grafton NH 11/30/2009 11/30/2009 NGRID Comerford Substation CNR Y Y ISO-NE NH C F
148 3/21/2011 G 3/6/2006 Comerford Unit #3 HD WAT 8.3 48.2 38.5 Grafton NH 3/25/2011 2/15/2011 NGRID Comerford Substation CNR Y Y ISO-NE NH C F
148 3/28/2012 G 3/6/2006 Comerford Unit #2 HD WAT 8.4 48.3 48.5 Grafton NH 3/12/2012 2/27/2012 NGRID Comerford Substation CNR Y Y ISO-NE NH C F
148 3/26/2013 G 3/6/2006 Comerford Unit #4 HD WAT 8.3 48.2 48.5 Grafton NH 3/22/2013 12/25/2012 NGRID Comerford Substation Y Y ISO-NE NH C F
147 8/31/2007 G 2/28/2006 Gas Turbine GT DFO 168.2 168.2 Suffolk MA 6/1/2010 4/1/2010 11/2/2007 NSTAR Chelsea Substation MIS N N ISO-NE BOST W F
146 G 2/21/2006 Devon 10 GT JF KER 17 20 New Haven CT 6/29/2006 CL&P Devon Substation MIS Y Y ISO-NE SWCT C F
145 8/31/2007 G 2/13/2006 Wind Project WT WND 51 51 Windham CT 12/31/2009 12/1/2009 6/20/2008 CL&P 115 kV 1607 line MIS N N ISO-NE CT W F
144 G 2/6/2006 Biomass ST WDS 25 27.5 Windsor VT 4/30/2009 2/28/2009 VELCO Coolidge Substation MIS N N VT W F
143 G 1/16/2006 Land Fill Gas IC LFG 25 25 Providence RI 6/30/2007 6/1/2007 4/25/2006 Johnston Substation Distribution System MIS N N RI W F
142 G 12/21/2005 Wind Project WT WND 48 48 Windham VT 5/31/2008 3/31/2008 4/13/2006 CVPS Londonderry Substation 46 kV MIS N N VT W F
141 2/7/2007 G 12/14/2005 Gas Turbine GT DFO NG 200 200 Middlesex MA 9/30/2009 8/31/2009 2/7/2007 115 kV O 167 line between Everett and Mystic Subst MIS N N ISO-NE BOST W F
140 9/30/2007 G 12/13/2005 A. L. Pierce GT DFO NG 89.35 99.56 New Haven CT 10/1/2007 Wallingford Electrical Division, East Street Subst MIS Y Y ISO-NE SWCT C F
139 5/15/2009 G 10/14/2005 Lowell Power Generators GT NG 99 99 99 Middlesex MA 6/1/2010 4/1/2010 4/29/2009 J162 115kV line between Tewksbury and Perry Street MIS Y Y ISO-NE CMA W F
138 11/2/2009 G 9/26/2005 Kibby Wind Project WT WND 65 65 65 Franklin ME 10/30/2009 9/30/2009 Bigelow Substation CNR Y Y ISO-NE ME C F
138 10/26/2010 G 9/26/2005 Kibby Wind Project WT WND 65.5 65.5 65.5 Franklin ME 10/26/2010 9/15/2010 Bigelow Substation CNR Y Y ISO-NE ME C F
137 7/7/2011 G 9/23/2005 Rumford Hydro Configuration Modification HD WAT 0 Oxford ME 6/21/2011 5/20/2011 CMP 115 kV Line 218 NA Y Y ISO-NE ME C F
136 4/3/2007 G 8/19/2005 Biomass ST WDS 39 40 Somerset ME 12/31/2008 9/30/2008 4/3/2007 Gorbell Tap of CMP's Detroit-Wyman Hydro 66 - 115 MIS N N ISO-NE ME W F
135 4/24/2012 G 8/19/2005 Russell Biomass ST WDS 55 55 55 Hampden MA 8/1/2015 3/1/2015 3/15/2012 Blanford - Southwick - Elm 115 kV line CNR Y Y ISO-NE WMA W F
134 2/18/2008 G 8/3/2005 Wind Project WT WND 45 45 Bennington VT 12/30/2010 9/29/2010 8/19/2008 Y-25 North, 69 kV line between Searsburg and Benni MIS N N ISO-NE VT W F
133 G 8/1/2005 Combined Cycle CC DFO 115 124 Orleans VT 1/31/2010 12/31/2009 Newport 115 kV Substation MIS N N VT W F
132 6/30/2008 G 7/21/2005 Wind Project WT WND 9 9 Bennington VT 12/31/2007 6/1/2007 6/30/2008 Bennington - Brattleboro 46 kV MIS N N VT W F
131 2/18/2008 G 6/21/2005 Wind Project WT WND 90 90 Franklin ME 12/31/2010 6/1/2010 9/25/2008 Bigelow Substation MIS Y Y ISO-NE ME W F
130 G 5/24/2005 Wind Project WT WND 53 53 Caledonia VT 9/1/2007 8/1/2007 9/22/2006 Irasburg - St. Johnsbury 115 kV MIS N N VT W F
129 G 2/28/2005 Georgia Pacific ST WDS 16 16 Penobscot ME 4/4/2005 BHE's Line 5 - 46kV MIS Y Y ISO-NE BHE C F
128 G 2/11/2005 Biomass ST WDS 39 42 Litchfield CT 7/31/2007 5/31/2007 TBD MIS N N W F
127 5/22/2009 G 11/15/2004 Lempster WT WND 24 24 24 Sullivan NH 11/10/2008 9/4/2008 PSNH 34.5 kV circuit from Newport Substation MIS Y Y NU NH C N
126 G 11/9/2004 Biomass ST WDS 40 Cheshire NH 7/1/2007 N-186, 115kV line between Vernon Road Tap and bor MIS N N NH W F
125 2/18/2008 G 11/2/2004 Cos Cob Redevelopment GT KER 36 45.8 Fairfield CT 5/31/2008 Cos Cob 115 kV Substation MIS Y Y ISO-NE NOR C F
125 2/16/2010 G 11/2/2004 Norwalk Harbor Station Redevelopment GT KER 322.5 322.5 330 Fairfield CT 2/28/2013 12/31/2012 2/16/2010 Norwalk 345 kV Station CNR Y N ISO-NE BL NOR W F
125 G 11/2/2004 Devon Station Redevelopment New Haven CT 7/15/2010 Devon 115 kV Substation MIS N N SWCT W F
124 G 10/27/2004 Hardscrabble Mountain Project Caledonia VT 3/31/2006 St. Johnsbury- Irasburg 115 kV Line MIS N N VT W F
123 G 10/4/2004 GenPower Athens Somerset ME 6/1/2006 Gorbell Tap of CMP's Detroit-Wyman Hydro 66 - 115 MIS N N ME W F
122 G 7/20/2004 Rand-Whitney Co-Gen DFO NG 11.866 14.858 New London CT 1/3/2005 CL&P Distribution System/Montville 115 kV MIS Y Y ISO-NE CT C F
121 G 6/22/2004 Third Taxing District Units 1, 2 & 3 DFO 6 6 Fairfield CT 3/28/2005 CL&P 27.6 kV Distribution System/Norwalk 115kV MIS N Y N/A NOR C F
120 G 5/10/2004 Univ. of NH - CHP Strafford NH PSNH Dist. Sys./Madbury 115 kV MIS N N NH C N
119 10/19/2007 G 1/16/2004 Ridgebury Power Fairfield CT 6/1/2004 10/19/2007 CL&P Distribution System MIS N N SWCT W F
118 G 12/29/2003 Bridgeport Harbor Units 5 & 6 Fairfield CT 5/1/2005 Paquonnock 115 kV Substation MIS N N SWCT W F
118 G 12/29/2003 New Haven Harbor Units 2 & 3 New Haven CT 5/1/2005 East Shore 115 kV Substation MIS N N SWCT W F
117 G 12/8/2003 Waterside Power - 23 MW Fairfield CT 6/1/2004 Waterside 115 kV - Norwalk/Stamford MIS N N NOR W F
116 6/11/2012 G 11/10/2003 East Haven Wind Farm WT WND 6 Essex VT 10/30/2012 Village of Lyndonville Elec. Dept. Distribution Sy NA N N VT W N
115 12/31/2008 G 10/27/2003 SNEW Summer '04 Temporary Generator GT DFO 0 23.8 Fairfield CT 6/1/2004 12/31/2008 Norwalk 27.6 kV MIS N N NOR W F
114 G 10/2/2003 Waterside Power, LLC GT DFO 69.3 74.1 Fairfield CT 6/1/2004 Waterside 115 kV MIS Y Y ISO-NE NOR C F
113 G 9/29/2003 Sheffield Wind Power Project Caledonia VT 12/31/2005 TBD MIS N N VT W F
112 G 9/15/2003 NECCO Cogen IC DFO Suffolk MA 10/1/2003 Everett 23 kV MIS Y N NGRID BOST C F
111 G 7/21/2003 GLHA James River/Fraser Paper7 WAT 25 25 Coos NH 6/22/2004 Berlin 115 kV MIS Y Y ISO-NE NH C F
110 G 7/7/2003 UCONN COGEN Facility NG 24.9 24.9 Tolland CT 10/19/2005 Mansfield 69 kV MIS Y Y ISO-NE CT C F
109 12/31/2008 G 6/12/2003 AWT Fitchburg Wind Project WT WND 12 Worcester MA 10/1/2004 12/31/2008 Ashburnham No. 610 - 13.8 kV MIS N N WMA W N
108 12/27/2012 G 5/12/2003 Hoosac Wind Project WT WND 28.5 28.5 28.5 Berkshire & Franklin MA 12/27/2012 12/5/2012 Line Y25S NR Y Y NGRID WMA C F
107 G 4/7/2003 SNEW Summer '03 Temporary Generator GT NG 19.445 Fairfield CT 6/1/2003 Norwalk 27.6 kV MIS Y Y ISO-NE NOR C F
106 10/2/2009 G 3/18/2003 Ridgewood RI Generation Phase I IC LFG 4.2 4.2 Providence RI 2/18/2004 Johnston Substation Distribution System MIS Y Y NGRID RI C F
106 10/2/2009 G 3/18/2003 Ridgewood RI Generation Phase II IC LFG 4.2 4.2 Providence RI 11/20/2005 Johnston Substation Distribution System MIS Y Y NGRID RI C F
105 G 3/10/2003 Evergreen Wind Power - Bagley Mountain Penobscot ME 7/1/2004 Chester 115 kV MIS N N BHE W F
105 G 3/10/2003 Evergreen Wind Power - Blueberry Barrens Washington ME 10/1/2004 Deblois 115 kV MIS N N BHE W F
104 7/16/2010 G 3/6/2003 Waterside Power - 180 MW GT DFO NG 203.9 203.9 207.2 Fairfield CT 12/31/2011 9/30/2011 7/12/2010 Waterside 115 kV CNR Y Y ISO-NE PD NOR W F
103 G 3/4/2003 Waterside Power GT Fairfield CT 6/1/2003 Waterside 115 kV MIS Y Y ISO-NE NOR C F
102 10/14/2008 G 2/4/2003 Peabody Power GT DFO NG 97.2 97.2 Essex MA 5/1/2008 2/1/2008 10/14/2008 C155 & B154 - 115 kV Lines MIS Y Y NGRID BOST W F
101 G 1/15/2003 Seabrook Power Uprate7 ST NUC 1265 1265 Rockingham NH 10/31/2006 Increase Existing Unit Capacity MIS Y Y ISO-NE NH C F
100 G 12/12/2002 VT Yankee Nuclear Power Station Upgrade7 ST NUC 634.5 641.5 Windham VT 5/8/2006 Increase Existing Unit Capacity MIS Y Y ISO-NE VT C F
99 G 8/8/2002 Millstone 2 Upgrade7 ST NUC 897.5 905.7 New London CT 3/10/2004 Increase Existing Unit Capacity MIS Y Y ISO-NE CT C F
99 G 8/8/2002 Millstone 3 Upgrade7 ST NUC 1195 1207.4 New London CT 5/8/2006 Increase Existing Unit Capacity MIS Y Y ISO-NE CT C F
98 G 6/3/2002 Redington Wind Farm Phase II Franklin ME 12/1/2005 Bigelow 115 kV Substation MIS N N ME W F
97 ETU 12/26/2001 Western Maine Area Export Enhancement N/A Increase Export Capability from Rumford Power Asso MIS N N ME W F
96 G 12/12/2001 Great Northern - Millinocket HW WAT 126 126 Penobscot ME 5/20/2003 115 kV connection to Chester 115 kV Substation MIS Y Y BHE BHE C F
95 7/12/2011 G 11/21/2001 Kleen Energy Project CC DFO NG 619.8 619.8 620 Middlesex CT 7/12/2011 5/3/2011 Sectionalize 353 Line CNR Y Y ISO-NE CT C F
94 G 7/17/2001 CPV New Britain LLC Hartford CT 7/1/2005 Interconnection South New Britain CT 115 kV Corrid MIS N N CT W F
93 ETU 7/6/2001 New York Interface LTF PtP Out Service N/A 1/1/2002 Increase Export Capability to New York MIS N N W F
93 ETU 7/6/2001 New York Interface LTF PtP Out Service N/A 1/1/2002 Increase Export Capability to New York MIS N N W F
93 ETU 7/6/2001 HVDC Interconn. betw. Norwalk Stat, CT & Shore Rd N/A CT 5/1/2004 Interconnection between Norwalk Stat, CT & Shore R MIS N N NOR W F
93 ETU 7/6/2001 HVDC Interconn. betw. Norwalk Stat, CT & Shore Rd N/A CT 5/1/2004 Interconnection between Norwalk Stat, CT & Shore R MIS N N NOR W F
92 ETU 6/26/2001 Sithe Mystic 4,5,6 Reconfiguration of Interconnect Middlesex MA 3/31/2003 Reconfigure Mystic 4,5,6 Interconnection from Myst MIS N N BOST W F
91 ETU 6/12/2001 New York Interface LTF PtP Out Service N/A 6/1/2002 Increase Export Capability to New York MIS N N W F
91 ETU 6/12/2001 New York Interface LTF PtP Out Service N/A 6/1/2003 Increase Export Capability to New York MIS N N W F
90 G 6/8/2001 Cabot Station CUO Uprate HD WAT Franklin MA 5/1/2004 Increase generating capacity from 53.0 MW to 61.8 MIS Y Y NU WMA C F
89 1/13/2017 G 6/6/2001 Cape Wind Turbine Generators WT WND 454 454 454 N/A MA 12/31/2018 10/1/2018 1/12/2017 Near Barnstable 115 kV Substation NR Y Y ISO-NE SEMA W F
88 4/21/2017 ETU 6/1/2001 Increase Orrington South Transfer Limit NA N/A N/A 12/1/2007 1/2/2008 N/A MIS Y Y BHE ME W F
87 ETU 5/24/2001 Stage II Cross Sound Cable HVDC Interconnection New Haven CT 7/1/2003 HVDC terminal adjacent to East Shore 345kV Substat MIS N N CT W F
86 ETU 5/21/2001 New York Interface LTF PtP Out Service N/A 1/1/2002 Increase Export Capability to New York MIS N N W F
85 G 4/4/2001 Pilgrim Power Uprate ST NUC Plymouth MA 8/1/2003 Increase Existing Unit Capacity MIS Y Y NSTAR SEMA C F
84 G 3/13/2001 Phase 1 - Nantucket Shouls Wind Barnstable MA 12/31/2007 Near Barnstable 115kV Substation MIS N N SEMA W F
84 G 3/13/2001 Phase 2 - Nantucket Shouls Wind Barnstable MA 12/31/2008 Near Barnstable 115kV Substation MIS N N SEMA W F
84 G 3/13/2001 Phase 3 - Nantucket Shouls Wind Barnstable MA 12/31/2009 Near Barnstable 115kV Substation MIS N N SEMA W F
84 G 3/13/2001 Phase 4 - Nantucket Shouls Wind Barnstable MA 12/31/2010 Near Barnstable 115kV Substation MIS N N SEMA W F
84 G 3/13/2001 Phase I - Nantucket Sound Wind Project Barnstable MA 12/31/2004 Near Barnstable 115kV Substation MIS N N SEMA W F
84 G 3/13/2001 Phase 2 - Nantucket Sound Wind Barnstable MA 12/31/2005 Near Barnstable 115kV Substation MIS N N SEMA W F
83 ETU 3/12/2001 Neptune Phase3 Boston Import from NB or NS Suffolk MA 3/31/2004 Kingston St. 115/345 kV and K St. 115 kV Substatio MIS N N BOST W F
83 ETU 3/12/2001 Neptune Phase4 CT Import from NB or NS Fairfield & New Haven CT 3/31/2004 Glenbrook 115 kV and E. Shore St. 115/345 kV (sep. MIS N N NOR W F
83 ETU 3/12/2001 Neptune Phase5 ME Yankee Export to Boston, CT or N Lincoln ME 3/31/2004 Maine Yankee 345 kV (Bi-Polar HVDC Terminal) MIS N N ME W F
83 ETU 3/12/2001 Neptune Phase7 Wyman Export to Boston, CT, NYC or Cumberland ME 3/31/2004 Wyman 345 kV (Bi-Polar HVDC Terminal) MIS N N SEMA W F
82 G 2/14/2001 Cape Cod Offshore Wind Project Barnstable MA 12/31/2004 South of Barnstable 115kV Substation MIS N N SEMA W F
81 G 1/2/2001 Berwick Energy Center York ME 1/1/2002 Dover 115 kV Substation MIS N N NH W F
80 G 12/27/2000 Berlin Energy Project Coos NH 1/1/2002 Berlin 115 kV Substation (PSNH) MIS N N NH W F
79 ETU 12/18/2000 Milford CT - New York HVDC New Haven CT 6/30/2003 HVDC Devon CT 115 kV MIS N N SWCT W F
78 ETU 12/13/2000 Norwalk-Northport HVDC Fairfield CT 6/30/2003 HVDC Norwalk CT and Northport NY MIS N N NOR W F
77 5/31/2011 G 10/2/2000 Berkshire Wind Power Project WT WND 15 15 15 Berkshire MA 5/28/2011 5/6/2011 WMECO at Brodie Mt. In Lanesboro MA NA Y Y NU WMA C N
76 ETU 8/31/2000 New York Interface LTF PtP Out Service N/A 1/1/2001 Increase Export Capability to New York MIS N N W F
75 ETU 8/16/2000 New York Interface LTF PtP Out Service N/A 1/1/2001 Increase Export Capability to New York MIS Y Y ISO-NE W F
74 2/22/2011 G 7/24/2000 South Norwalk Repowering IC DFO NG 48.9 48.9 48.9 Fairfield CT 6/1/2011 4/15/2011 2/22/2011 Norwalk 115 kV Substation NA Y Y ISO-NE NOR W N
73 G 7/7/2000 Norwalk Harbor A Fairfield CT 12/31/2003 Norwalk 115 kV Station MIS N N NOR W F
73 G 7/7/2000 Norwalk Harbor B Fairfield CT 6/30/2004 Norwalk 115 kV Station MIS N N NOR W F
73 G 7/7/2000 Devon A New Haven CT 12/31/2003 Devon 115 kV Substation MIS N N SWCT W F
73 G 7/7/2000 Middletown A Middlesex CT 12/31/2003 Middletown Station MIS N N CT W F
73 G 7/7/2000 Middletown B Middlesex CT 12/31/2005 Middletown Station MIS N N CT W F
73 G 7/7/2000 Montville A New London CT 9/30/2004 Montville Station MIS N N CT W F
73 G 7/7/2000 Somerset Diversity Bristol MA 3/31/2004 Somerset 115 kV Station MIS N N SEMA W F
73 G 7/7/2000 Somerset A Bristol MA 12/31/2003 Somerset 115 kV Station MIS N N SEMA W F
72 G 6/28/2000 Tewksbury Power Middlesex MA 6/30/2004 Tewksbury 345 kV Station MIS N N CMA W F
71 G 5/22/2000 New Haven Harbor New Haven CT 6/1/2003 East Shore Substation MIS N N CT W F
71 G 5/22/2000 Bridgeport Harbor Station Fairfield CT 6/1/2003 Pequonnock 115 kV Substation MIS N N SWCT W F
70 ETU 4/25/2000 New York Interface LTF PtP Out Service N/A 7/31/2003 Increase Export Capability to New York MIS N N W F
69 ETU 4/20/2000 Neptune HVDC Cable Project N/A 3/31/2004 HVDC from Maine/ Maritimes to Boston Area and CT S MIS N N W F
68 ETU 3/9/2000 Bridgeport Long Island HVDC Fairfield CT 5/1/2003 HVDC to Long Island, NY from Bridgeport, CT MIS N N SWCT W F
67 G 2/25/2000 Lowell Power Expansion Middlesex MA 5/1/2001 Lowell Power 115 kV Station MIS Y Y NGRID CMA W F
66 G 12/20/1999 AEC Expansion Franklin ME 6/30/2001 Riley Road 115 kV Substation MIS N N ME W F
65 ETU 12/2/1999 EPMI LTF Pt to Pt In Svce. N/A 1/1/2002 N N W F
64 G 11/8/1999 West Springfield Station ST NG RFO Hampden MA 6/7/2002 West Springfield 115 kV Substation MIS Y Y ISO-NE WMA C F
64 G 11/8/1999 Seabrook Unit One Uprate Rockingham NH 5/1/2002 Increase Existing Unit Capacity MIS N N NH W F
63 ETU 11/4/1999 WESC LTF Pt to Pt In Svce N/A 2/1/2000 Increase Import Capability from NY N N W F
62 ETU 10/5/1999 New York Interface Import Expansion N/A 1/1/2000 Increase Import Capability from NY MIS N N W F
61 ETU 9/15/1999 New York Interface Import Expansion N/A 12/1/1999 Increase Import Capability from NY N N W F
60 ETU 9/1/1999 Sithe LTF Pt to Pt In Svce. N/A 3/1/2000 Increase Import Capability from NY N N W F
59 G 8/18/1999 Milford Power Uprate New Haven CT 6/30/2001 Increase Existing Unit Capacity MIS N N SWCT W F
59 G 8/18/1999 Berkshire Power Uprate Hampden MA 6/30/2001 Increase Existing Unit Capacity MIS N N WMA W F
58 ETU 8/5/1999 CPS LTF Pt to Pt In Svc. N/A 11/1/1999 Increase Import Capability from NY N N W F
57 G 6/4/1999 Norwich Power Station New London CT 1/1/2002 Bean Hill Substation MIS N N CT W F
56 ETU 2/25/1999 New York Interface Import Expansion N/A 5/1/1999 Increase Import Capability from New York N N W F
55 ETU 1/21/1999 Cross Sound Cable NA N/A New Haven CT 9/1/2003 HVDC terminal adjacent to East Shore 345kV Substat MIS Y Y TEUS CT C F
54 G 1/5/1999 Redington Mountain Wind Farm Franklin ME 12/31/2002 Bigelow 115 kV Substation MIS N N ME W F
53 ETU 11/30/1998 Tractebel LTF Int + Internal PtP N/A 5/1/2002 Import from the New Brunswick System ES N N W F
52 G 11/13/1998 Haddam Station Middlesex CT 12/31/2002 Site of the Former CT Yankee Plant MIS N N CT W F
52 G 11/13/1998 Haddam Station Phase II Middlesex CT 12/31/2002 Site of the Former CT Yankee Plant N N CT W F
51 ETU 10/30/1998 MEPCO-New England Interface Expansion N/A 1/1/2000 Import Capability from MEPCO MIS N N ME W F
50 G 10/29/1998 Patriot Cabot Street Station Hampden MA 12/31/2001 Holyoke Substation N N WMA W F
49 ETU 9/14/1998 Irving Oil LTF PtP N/A 4/1/2001 Import from NB Via MEPCO ES N N W F
48 G 9/9/1998 Bennington Energy Park Bennington VT 11/30/2001 TBD N N VT W F
48 G 9/9/1998 Rutland Energy Park Rutland VT 11/30/2001 TBD N N VT W F
47 G 8/26/1998 Nickel Hill Energy Project Middlesex MA 6/30/2001 Tewksbury 230 kV Substation MIS N N BOST W F
46 G 8/18/1998 Campello Power Co. Plymouth MA 6/30/2002 MIS N N SEMA W F
45 G 7/17/1998 Kendall Repowering Project CC NG Suffolk MA 12/18/2002 Kendall Station in Cambridge MIS Y Y NSTAR BOST C F
44 G 7/10/1998 Brockton Power Project Plymouth MA 1/31/2001 Industrial Blvd. MIS Y Y NGRID SEMA W F
43 ETU 6/8/1998 Tractebel LTF PtP N/A 12/31/2002 Import from the New Brunswick System N N W F
42 G 6/5/1998 Wiscassett Lincoln ME 10/1/2001 Maine Yankee 345 KV MIS N N ME W F
41 G 6/4/1998 Canal 2 Repowering Barnstable MA 6/30/2001 Canal 345 kV Station MIS N N SEMA W F
40 G 6/1/1998 Glen Charlie Unit One Plymouth MA 3/31/2001 Wareham 115 kV Substation N N SEMA W F
39 ETU 5/28/1998 CVPS/GMP LTF PtP Clinton NY 12/31/2001 Import from NY via PV20 MIS N N VT W F
39 ETU 5/28/1998 HQ Highgate2 HVDC Franklin VT 12/31/2001 Located on the Hydro Quebec sys. N. near Highgate, MIS N N VT W F
38 G 5/8/1998 Rocky River Power Litchfield CT 7/31/2001 Long Mountain 345 kV Station MIS N N CT W F
37 G 4/29/1998 FPLE RISE, LLC (R.I. Hope Energy) CC NG Providence RI 11/5/2002 S 171 and S 172 Lines MIS Y Y NGRID RI C F
36 G 4/14/1998 FPL Energy (Bedford) Bristol MA 11/30/2000 Industrial Park 115 kV Substation MIS N N SEMA W F
35 G 4/2/1998 Mason Lincoln ME 12/31/2000 Mason 345 kV Substation MIS N N ME W F
35 G 4/2/1998 Wyman A Cumberland ME 1/2/2000 Wyman 115 kV Station MIS N N SME W F
35 G 4/2/1998 Wyman B Cumberland ME 1/3/2000 Wyman 115 kV Station N N SME W F
34 G 4/1/1998 WEG-Norwich New London CT 6/30/2005 Montville 115 kV Substation N N CT W F
33 G 3/31/1998 Sithe Framingham Station Expansion Middlesex MA 12/31/2001 Framingham 230 kV N N BOST W F
33 G 3/31/1998 Sithe Medway Norfolk MA 12/31/2001 Existing Medway Station 345 kV MIS Y Y NSTAR RI W F
33 G 3/31/1998 Westbrook Power CC NG Cumberland ME 4/13/2001 Spring St. 115 kV Substation MIS Y Y CMP SME C F
33 G 3/31/1998 Sithe Edgar Station Expansion (Fore River) CC NG Norfolk MA 8/4/2003 Holbrook 345 kV MIS Y Y NSTAR SEMA C F
33 10/2/2009 G 3/31/1998 Sithe Mystic Station Expansion Unit 8 CC NG Suffolk MA 4/13/2003 Mystic 345 kV ES Y Y NSTAR BOST C F
33 10/2/2009 G 3/31/1998 Sithe Mystic Station Expansion Unit 9 CC NG Suffolk MA 6/11/2003 Mystic 345 kV ES Y Y NSTAR BOST C F
32 G 3/30/1998 Towantic Energy New Haven CT 12/31/2002 Beacon Falls 115 kV MIS Y Y ISO-NE CT W F
31 G 3/26/1998 North Smithfield Providence RI 6/30/2002 W. Farnum 345 kV MIS Y N NGRID RI W F
30 G 3/25/1998 Norwich Power Station New London CT 12/31/2000 Bean Hill Substation Y N NU CT W F
30 ETU 3/25/1998 Engage Energy LTF PtP N/A 12/31/2000 Import from New Brunswick via MEPCO ES Y N CMP W F
29 G 3/24/1998 Bucksport Energy, L.P. CC DFO NG Hancock ME 1/1/2001 Belfast 115 kV bus MIS Y Y CMP BHE C F
28 G 3/18/1998 Newington Energy Center Rockingham NH 3/31/2001 Newington 345 kV Station N N NH W F
27 G 3/13/1998 AES Carpenter Hartford CT 12/31/2001 Southington 345 kV Substation MIS N N CT W F
26 G 3/6/1998 S&P Cogeneration Essex MA 12/31/2001 Lynn 115 kV Y N BOST W F
25 G 2/27/1998 Patriot Power Bristol MA 3/31/2001 Bridgewater 345 kV Line N N SEMA W F
24 G 2/25/1998 Orrington Generation Penobscot ME 6/30/2001 Orrington 345 kV Station N N ME W F
23 ETU 2/19/1998 HQ-Surowiec Cumberland ME 12/31/2002 Surowiec 345 kV or MEPCO MIS Y N CMP ME W F
22 G 2/16/1998 Meriden Power New Haven CT 6/30/2003 Sectionalize 362 Line MIS Y Y ISO-NE CT W F
21 10/2/2009 G 2/11/1998 Wallingford Power Units 1&3 GT NG New Haven CT 12/31/2001 Wallingford 115 kV Substation MIS Y Y ISO-NE SWCT C F
21 10/2/2009 G 2/11/1998 Wallingford Power Unit 4 GT NG New Haven CT 1/23/2002 Wallingford 115 kV Substation MIS Y Y ISO-NE SWCT C F
21 10/2/2009 G 2/11/1998 Wallingford Power Units 2&5 GT NG New Haven CT 2/7/2002 Wallingford 115 kV Substation MIS Y Y ISO-NE SWCT C F
21 G 2/11/1998 AES Londonderry (Granite Ridge) CC DFO NG Rockingham NH 4/1/2003 N. Litchfield 230 kV Station and Watts Brook 115 k MIS Y Y ISO-NE NH C F
20 G 1/20/1998 Housatonic Power Fairfield CT 1/1/2001 398 Line N N CT W F
19 G 1/14/1998 Livermore Falls Androscoggin ME 12/1/2000 Livermore Falls 115 kV Substation N N ME W F
18 G 1/13/1998 Versaille Energy Center New London CT 12/31/2000 Tunnel 115 kV Substation N N CT W F
18 G 1/13/1998 White Mountain Cogen.Center Coos NH 12/31/2000 Lost Nation 115 kV Substation N N NH W F
18 G 1/13/1998 Sprague Newington (Piscataqua Power) Rockingham NH 1/1/2000 Newington 345 kV Station MIS N N NH W F
17 G 12/12/1997 SEI Newington (ConEd) CC JF NG Rockingham NH 9/18/2002 Newington 345 kV Station MIS Y Y NU NH C F
17 10/2/2009 G 12/12/1997 Lake Road Generating Units 1&2 CC DFO NG Windham CT 3/15/2002 Line 347 MIS Y Y ISO-NE RI C F
17 10/2/2009 G 12/12/1997 Lake Road Generating Unit 3 CC DFO NG Windham CT 5/22/2002 Line 347 MIS Y Y ISO-NE RI C F
16 G 10/24/1997 ANP Gorham Cumberland ME 7/1/2000 S. Gorham 345 kV Substation MIS Y Y CMP ME W F
15 G 10/9/1997 South Norwalk Fairfield CT 1/1/2000 Norwalk 115 kV Substation Y N ISO-NE NOR W F
14 G 9/30/1997 Cabot Power Middlesex MA 6/30/2000 Mystic 345 kV Station ES Y Y NSTAR BOST W F
13 G 8/22/1997 Summit Power Hampden MA 3/31/2001 1302 Line N N WMA W F
13 10/2/2009 G 8/22/1997 Milford Power Unit 1 CC DFO NG New Haven CT 2/12/2004 Devon 115 kV Substation MIS Y Y ISO-NE SWCT C F
13 10/2/2009 G 8/22/1997 Milford Power Unit 2 CC DFO NG New Haven CT 5/3/2004 Devon 115 kV Substation MIS Y Y ISO-NE SWCT C F
12 G 8/15/1997 Berkshire Power CC NG Hampden MA 6/19/2000 South Agawam Jct. 115 kV Station ES Y Y NU WMA C F
11 G 8/5/1997 Wareham Plymouth MA 2/28/2001 Adjacent to the Tremont Substation N N SEMA W F
10 G 7/24/1997 Maine Independence CC NG Penobscot ME 5/1/2000 Located at Graham Station in Veazie, ME Y Y CMP BHE C F
9 G 7/22/1997 IDC Bellingham Norfolk MA 12/31/2002 Sectionalize 336 Line MIS Y Y NSTAR RI W F
8 10/2/2009 G 7/15/1997 ANP Bellingham Energy Project Unit 1 CC NG Norfolk MA 10/24/2002 Sectionalize Line 303 MIS Y Y NGRID RI C F
8 10/2/2009 G 7/15/1997 ANP Bellingham Energy Project Unit 2 CC NG Norfolk MA 12/28/2002 Sectionalize Line 303 MIS Y Y NGRID RI C F
8 10/2/2009 G 7/15/1997 ANP Blackstone Energy Project Unit 1 CC NG Worcester MA 6/7/2001 Sectionalize 336 Line MIS Y Y NGRID RI C F
8 10/2/2009 G 7/15/1997 ANP Blackstone Energy Project Unit 2 CC NG Worcester MA 7/13/2001 Sectionalize 336 Line MIS Y Y NGRID RI C F
7 G 6/25/1997 Bridgeport Harbor Station CC NG Fairfield CT 7/24/1999 Pequonnock 115 kV Substation Y Y UI SWCT C F
6 G 6/12/1997 Rumford Power Associates CC NG Oxford ME 10/16/2000 Rumford 115 kV Substation Y Y CMP ME C F
5 G 5/9/1997 Brayton Pt Bristol MA 12/31/2001 Brayton Point 345 kV Station MIS Y Y NGRID RI W F
4 G 4/10/1997 EMI Dighton Power Project CC NG Bristol MA 8/1/1999 U6 Line ES Y Y NGRID SEMA C F
3 G 2/13/1997 Androscoggin Energy Center CC DFO NG Franklin ME 12/28/2000 Jay 115 kV Substation ES Y Y CMP ME C F
2 G 11/8/1996 EMI-Tiverton CC NG Newport RI 8/18/2000 Near Tiverton 115 kV Substation ES Y Y NGRID SEMA C F
1 G 6/7/1996 Millennium+K117 CC DFO NG Worcester MA 4/6/2001 W 123 Line ES Y Y NGRID WMA C F